B 4872.57
C 14447.43
D E3050 3150
F
PROPOSED EXISTING C.R. TO BE
GENERAL NOTES: DISMANTLED AND CONVERT IT TO NEW
1
BATTERY ROOM
ALCATEL PR-2K18
SEL
DT-REC
ALCATEL
CR
RECTI
ARGUS FUSE 1
ALCATEL
BATTERY
BATTERY
REC
BANK 1
BANK 2
UTILITY
ACBEL
ACBEL
RECTI
PR-1A
ROOM
PACU-12
ARGUS
RECTI
STORAGE
CABLE CR
ARGUS FUSE 2
BATTERY
BATTERY
VAULT
ROOM
BANK 2
BANK 1
ACBEL
ARGUS
RECTI
6090
PACU-11
BATTERY RECTIFIER
ROOM ROOM
UP
MDF
2
HALLWAY
PACU-E
PR-1 (MAIN)
LP-1
GUARD
PP-1
HOUSE
PROPOSED NEW GENSET ROOM
MDP ATS
MTS
600AT
MTS
LOCATION
PR-2K18
ECB
4090 OFFICE GEN-SET A
GENSET
D-85 FUEL
3
TANK
ROOM
STEP
UP
STEP
UP
5550
DAY TANK
4858.86
5
ROOM
KALIPULAKO ROAD
TV5 EQP'T
ROOM
15701.58
STORAGE
PUMP
OFFICE OFFICE
KALIPULAKO ROAD
BUSINESS
CR OFFICE
10559.55
EXISTING SERVICE
ENTRANCE
7
VICINITY MAP KALIPULAKO ST. EXTENSION
KALIPULAKO ROAD
EXISTING 3-100KVA
TRANSFORMER
PLDT LIPA
1 EXISTING SITE DEVELOPMENT PLAN
ME-01
LEGEND:
EXISTING
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 3x5TR FCU,
PROJECT DESCRIPTION: 1xWACU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
EXISTING SITE DEVELOPMENT PLAN
ME-01
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY:
CORPORATION
SITE ADDRESS: KALIPULAKO ST. EXTENSION, LIPA, BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-15
LONGITUDE: 120°9'35.74" LATITUDE: 13°56'15.69'' PLACE ISSUE: DATE APPROVED:
A 33850
A-1 A-2 A-3 B 4872.57
C 14447.43
D E 3050 3150
F
4602.81 4602.81
1 9400
GB
RISER UP TO 2ND FLOOR
EQUIPMENT ROOM
ALCATEL
SEL
PR-2K18
PROP. 1000AH PROP. 1000AH PROP. 1000AH PROP. 1000AH
E.F.
DT-REC
600 BATTERY BANK BATTERY BANK 600 600 BATTERY BANK BATTERY BANK 600
(DPC) (DPC) (DPC) (DPC)
30AT.
ELPP
PROP. 5TR
ACCU 1&2
2P ECB
ALCATEL
RECTI
PROPOSED 8000L
1200
ARGUS FUSE 1
PROPOSED 800L MANUAL
FP
ALCATEL
PROP. 1000AH PROP. 1000AH PROP. 1000AH PROP. 1000AH
DAY TANK PUMP
BATTERY
BATTERY BANK BATTERY BANK BATTERY BANK BATTERY BANK
BATTERY
REC
600 600 600 600
BANK 1
BANK 2
UTILITY
(DPC) (DPC) (DPC) (DPC)
ACBEL
FUEL
E.F.
1900 2300
2160
ACBEL
RECTI
PR-1A
40AT, 230V, 3P
ROOM
1300
600 600 600 600
BATTERY BANK BATTERY BANK BATTERY BANK BATTERY BANK
(DPC) (DPC) (DPC) (DPC)
1000
PACU-12
SWITCHBOARD
ARGUS
PROP. 5TR
RECTI
CABLE
570 600 800 600 580 600 800 600 570
2000
ACCU 3
4790
1680
ARGUS FUSE 2
700
BATTERY
BATTERY
VAULT
BANK 2
BANK 1
3260
ACBEL
ARGUS
RECTI
350
3660 E.F.
1200
PROPOSED WALL
800
1750
6090
PACU-11
40AT, 230V, 3P
NEMA 4X ECB
PROPOSED 500KW
1.1
RENOVATED C.R.
1110
PROP. ACU
OPEN TYPE GENSET BATTERY RECTIFIER
ROOM ROOM
UP
350
3000
MDF
1500
HALLWAY
350
PACU-E
LP-1
PP-1
GUARD
HOUSE
MDP
PROPOSED 500KW ATS
MTS
1110
950
600AT
MTS
OPEN TYPE GENSET
5160
350
PR-2K18
950
ECB
2.1 4090 OFFICE GEN-SET A
1500
1000
2700
MDP
E.F.
GENSET
D-85 FUEL
TANK
3
ROOM
1100
STEP
UP
6300
STEP
UP
5550
DAY TANK
4858.86
5
ROOM
KALIPULAKO ROAD
TV5 EQP'T
ROOM
15701.58
STORAGE
PUMP
OFFICE OFFICE
KALIPULAKO ROAD
BUSINESS
CR OFFICE
10559.55
7
KALIPULAKO ST. EXTENSION
KALIPULAKO ROAD
PROPOSED3x167KVA
PLDT LIPA
1 PROPOSED SITE DEVELOPMENT PLAN LEGEND:
ME-02
EXISTING
PROPOSED
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 3x5TR FCU,
PROJECT DESCRIPTION: 1xWACU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED SITE DEVELOPMENT PLAN
ME-02
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY:
CORPORATION
SITE ADDRESS: KALIPULAKO ST. EXTENSION, LIPA, BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-15
LONGITUDE: 120°9'35.74" LATITUDE: 13°56'15.69'' PLACE ISSUE: DATE APPROVED:
NOTES:
1. The diesel fuel transfer pump shall be positive rotary gear pump, fitted with mechanical seal and pressure relief valve.
2. The diesel fuel transfer pump should be rated at 36L/min at 15 meters TDH, coupled to 1hp electric motor, 1750 rpm, 230volts, 1phase, 60 hertz.
3. Diesel fuel transfer pump shall be US or Japan made, "Roper", "Viking", "Tuthill", Sherwood" or approved equal.
4. Proposed fuel supply lines existing fuel storage tank to skid mounted Genset Base tank shall be 1-1/2" B.I. Sched. 40.
5. The existing Genset Base tank shall be provided with float switch for controlling the motor driven auxiliary fuel transfer pump for low and high fuel level.Acceptable brands
are Fozmula, Kohgiken Mac-3 or approved equal
6. The existing Genset shall be provided with battery trickle charger, including power wires and conduit. Submit schematic diagram, brochure and shop drawing for approval
of PLDT.
7. Complete mounting of 500KW skid mounted generator set is included in the scope of work of the contractor.
8. Replacement of Genset batteries, air filters, fuel filters, oil filters and lubricating oil is included in the scope of work of the contractor.
9. Provision of New 2x500KW GENSET (OPEN TYPE)
10. All necessary accessories needed to operate the 2x500KW (OPEN TYPE) shall be provided by the contractor.
RAIN CAP
MUFFLER/PIPE HANGER
EXHAUST PIPE
EXHAUST MUFFLER
OF GENSET
ACESS DOOR
FOR RADIATOR
HOT AIR DUCT
PLDT LIPA
1 PROPOSED 500KW OPEN TYPE GENSET
ME-03
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 3x5TR FCU,
PROJECT DESCRIPTION: 1xWACU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED 500KW OPEN TYPE GENSET
ME-03
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY:
CORPORATION
SITE ADDRESS: KALIPULAKO ST. EXTENSION, LIPA, BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-15
LONGITUDE: 120°9'35.74" LATITUDE: 13°56'15.69'' PLACE ISSUE: DATE APPROVED:
A-1 A-2 A-3 B
4602.81 4602.81 2124.38
1 PROPOSED 8000L
30AT.
2P ECB
GB
ELPP
1200
PROPOSED 800L MANUAL
DAY TANK PUMP
FP
FUEL
E.F.
1900 2300
2160
STORAGE TANK PROP.
1300
1000
SWITCHBOARD
2000
4776.31
1680
3260
350
3660
1200
800
PROPOSED 500KW
1.1
1110
OPEN TYPE GENSET
3000
1500
1315.79
350
1110
950
OPEN TYPE GENSET
350
950
2.1 3476.71
1500
1000
2700
MDP
E.F.
3 612.18
1100
6300
5539.28
4 PLDT LIPA
LEGEND:
EXISTING
PROPOSED
1 PROPOSED FUEL PIPE LINE LAYOUT FUEL PIPE LINE
ME-04
EXHAUST FAN
SITE ADDRESS: KALIPULAKO ST. EXTENSION, LIPA, BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-15
LONGITUDE: 120°9'35.74" LATITUDE: 13°56'15.69'' PLACE ISSUE: DATE APPROVED:
NOTES:
1. THE DIESEL DUEL DIAGRAM TRANSFER PUMP MUST BE:
a. POSITIVE ROTARY GEAR PUMP, FITTED WITH MECHANICAL SEAL AND PRESSURE RELIEF VALVE.
b. RATED AT 15GPM AT 15m TDH, COUPLED TO 1HP ELECTRIC MOTOR, 1750 RPM, 230V,1PH,60HZ.
c. U.S OR JAPAN MADE, "ROPER", "VIKING", "SHERWOOD" OR EQUAL APPROVED.
2. FUEL LINES TO DAYTANK SHALL BE B.I SCHED . 40 AND SHALL BE PROVIDED WITH THE FOLLOWING: BRONZE Y-STRAINER,CHECK VALVES, BALL VALVES,
PIPE SUPPORTS AND CLAMPS. BRAND OF VALVES MUST BE "KITZ", "TOZEN" , OR EQUAL APPROVED.
3. THE EXISTING FUEL DAYTANK SHALL BE PROVIDED WITH FLOAT SWITCH FOR CONTROLLING THE MOTOR DRIVEN AUXILIARY FUEL PUMP FOR LOW AND
HIGH FUEL LEVEL ALARMS. ACCEPTABLE BRANDS ARE FOZMULA, KOHGIKENOR APPROVED EQUAL.
4. THE CONTRACTOR SHALL SUBMIT LAYOUT OF FUEL PIPE TRENCH FROM FUEL STORAGE TO GENSET FUEL TANK.
5. ACCEPTABLE BRAND OF PUMP CONTROL PANEL ARE SCHNEIDER OR APPROVED EQUAL.
6. ACCEPTABLE BRAND OF MANUL PUMP ARE TOKHEIM,TUTHILL,FILTRITE OR APPROVED EQUAL.
7. SUBMIT BROCHURE OF 500KW GENSET FOR APPROVAL PRIOR TO PURCHASE/DELIVERY.
8. THE GENSET MUST BE LOAD TESTED FOR 4HRS FULL LOAD PRIOR TO DELIVERY TO SITE.
PROPOSED PUMP
CONTROL PANEL
PROPOSED 25mmØ
B.I. SCHED 40 PIPE IN
500KW, 3P, 230V
FUEL PIPE TRENCH
/ EMBEDDED PROPOSED
FLOAT SWITCH
PROPOSED 625KVA GENSET 1
BALL Y CHECK BALL
PROPOSED BALL
VALVE
CHECK VALVE Y
STRAINER
BALL
VALVE
BALL
VALVE
CHECK
VALVE
VALVE STRAINER VALVE VALVE
PROPOSED 800
FUEL STORAGE M LITERS DAYTANK
TANK PROPOSED
MOTORIZED PUMP
BALL
VALVE
8000 L
BALL BALL
VALVE VALVE 500KW, 3P, 230V
PLDT LIPA
1 PROPOSED FUEL LINE SCHEMATIC DIAGRAM
ME-05
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 3x5TR FCU,
PROJECT DESCRIPTION: 1xWACU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED FUEL LINE SCHEMATIC DIAGRAM
ME-05
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY:
CORPORATION
SITE ADDRESS: KALIPULAKO ST. EXTENSION, LIPA, BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-15
LONGITUDE: 120°9'35.74" LATITUDE: 13°56'15.69'' PLACE ISSUE: DATE APPROVED:
EQUIPMENT SCHEDULE EQUIPMENT SCHEDULE
30AT.
GB
(PROPOSED GENSET ROOM) ( BATTERY ROOM, 1ST FLOOR )
2P ECB ELPP
PROPOSED 800L MANUAL
FP 1200
DAY TANK PUMP
PROPOSED WALL MOUNT EXHAUST FAN PROPOSED AUTO SHUTTER EXHAUST FAN
E.F.
2160
PROP.
1300
1000 SWITCHBOARD
2000 E.F.
1680 600
PROP. 1000AH
BATTERY BANK
PROP. 1000AH
BATTERY BANK 600 600
PROP. 1000AH
BATTERY BANK
PROP. 1000AH
BATTERY BANK 600
(DPC) (DPC) (DPC) (DPC)
350
PROP. 5TR
ACCU 1&2
1200 800
PROP. 1000AH PROP. 1000AH PROP. 1000AH PROP. 1000AH
BATTERY BANK BATTERY BANK BATTERY BANK BATTERY BANK
600 600 600 600
PROPOSED
PROPOSED 500KW 1110
(DPC) (DPC) (DPC) (DPC)
630CMH AUTO
OPEN TYPE GENSET
PROP. ELVSG - TIE
40AT, 230V, 3P
600
PROP. 500AH
EXP TO 1000AH
BATTERY BANK
PROP. 500AH
EXP TO 1000AH
BATTERY BANK
600 600
PROP. 500AH
EXP TO 1000AH
BATTERY BANK
PROP. 500AH
EXP TO 1000AH
BATTERY BANK
600
NEMA 4X ECB
SHUTTER
(DPC) (DPC) (DPC) (DPC)
EXHAUST FAN
PROP. 5TR
570 600 800 600 580 600 800 600 570
ACCU 3
PROPOSED 350
700
3100CMH WALL
MOUNT EXHAUST 3000 AIR CHANGES CALCULATION (CMH) PROPOSED WALL E.F. AIR CHANGES CALCULATION (CMH)
1750
FAN
1500 NO. OF TOTAL CMH AIR NO. OF TOTAL CMH AIR
L(M) W(M) H(M) VOLUME(M) EXHAUST FAN (EXHAUST FAN) CHANGES/HR V1(M) V2(M) VT(M)
EXHAUST FAN (EXHAUST FAN) CHANGES/HR
PROPOSED WALL
350 8.78 8.4 4 295 2 3100 21.02 50.05 6.87 56.92 2 630 22.14
PROP. ATS-2 PROP. ATS-1 PROP.
1500
NOTE: NOTE:
1000
PROP. EF OUTLET TO BE INSTALLED BESIDE THE PROP. EXHAUST FAN PROP. EF OUTLET TO BE INSTALLED BESIDE THE PROP. EXHAUST FAN
MDP
E.F.
2700
OR INSTALLATION BASED ON PLDT STANDARD OR INSTALLATION BASED ON PLDT STANDARD
1100
PLDT LIPA
6300 2 PROPOSED BATTERY ROOM (1ST FLR.)
ME-06
PLDT LIPA
1 PROPOSED GENSET ROOM
ME-06
PLDT LIPA
PROPOSED EXHAUST FAN LAYOUT
ME-06
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 3x5TR FCU,
PROJECT DESCRIPTION: 1xWACU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED EXHAUST FAN LAYOUT
ME-06
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY:
CORPORATION
SITE ADDRESS: KALIPULAKO ST. EXTENSION, LIPA, BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-15
LONGITUDE: 120°9'35.74" LATITUDE: 13°56'15.69'' PLACE ISSUE: DATE APPROVED:
NOTE:
1. ALL ANGLE BARS (50mm X 50mm X6mm) CONNECTION MUST BE FULLY
WELDED ON ALL JOINTS.
2. DAYTANK MUST BE REPAINTED WITH PRIMER PAINT AND FINISHED WITH
ENAMEL PAINT. 1300mm
3. SEE CE FOR DAYTANK BUNDWALL DETAILS.
600mm FLOAT SWITCH
GUARD SCREEN
BRACKET SUPPORT
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 3x5TR FCU,
PROJECT DESCRIPTION: 1xWACU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED DAY TANK SHOP DRAWING ME-07
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY:
CORPORATION
SITE ADDRESS: KALIPULAKO ST. EXTENSION, LIPA, BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-15
LONGITUDE: 120°9'35.74" LATITUDE: 13°56'15.69'' PLACE ISSUE: DATE APPROVED:
3710
1500
TOP VIEW
3710
1500
CONCRETE LEG SUPPORT
SIDE VIEW
NOTE: FRONT VIEW
1. FUEL STORAGE TANK MUST BE REPAINTED WITH PRIMER PAINT AND FINISHED WITH ENAMEL PAINT.
2. FUEL DAYTANK AND FUEL STORAGE TANK SHALL BE PROVIDED WITH BUNDWALL EQUIVALENT TO
110% OF FUEL CAPACITY.
PLDT LIPA
1 PROPOSED FUEL STORAGE TANK DETAILS AND COMPUTATION
ME-08
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 3x5TR FCU,
PROJECT DESCRIPTION: 1xWACU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROP. FUEL STORAGE TANK DETAILS
ME-08
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY:
CORPORATION AND COMPUTATIONS
SITE ADDRESS: KALIPULAKO ST. EXTENSION, LIPA, BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-15
LONGITUDE: 120°9'35.74" LATITUDE: 13°56'15.69'' PLACE ISSUE: DATE APPROVED:
EXHAUST PIPE
CONRETE WALL
4-12mm dia. LONGITUDINAL SEAM
BOLT, NUT AND PIPE INSULATION CROSS-SECTIONAL SEAM
WASHER
PERLITE BLOCK
INSULATION
C-CHANNEL
FICEMBOARD FICEMBOARD
EXHAUST PIPE
LONGITUDINAL AND
CROSS-SECTIONAL SEAM
(TYPICAL)
EXHAUST PIPE HANGER DETAIL EXHAUST THIMBLE PIPE EXHAUST CLADDING DETAIL
EGL
3000PSI CONCRETE
EXPANSION REINFORCED WITH
CLAMP 10MM DIA. BARS
BOLT PROPOSED 32mm 0.40m
FUEL SUPPLY LINES
2"PVC DRAIN PIPE
TO BE CLAMPLED
TO TRENCH WALL
@ EVERY 0.40m
CLAMPING 0.10
BAND
NOTE:
1. DRAIN TO BE TAPPED TO THE NEAREST EXISTING DRAINAGE SYSTEM
2. VERIFY JOBSITE AND SUBMIT SHOP DRAWINGS FOR APPROVAL.
PLDT LIPA
1 MISCELLANEOUS DETAILS
ME-09
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 3x5TR FCU,
PROJECT DESCRIPTION: 1xWACU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
MISCELLANEOUS DETAILS
ME-09
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY:
CORPORATION
SITE ADDRESS: KALIPULAKO ST. EXTENSION, LIPA, BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-15
LONGITUDE: 120°9'35.74" LATITUDE: 13°56'15.69'' PLACE ISSUE: DATE APPROVED:
B C D B C D
PROPOSED TO
DEMOLISH FOR
RENOVATION
4872.57 14447.43 4872.57 14447.43
1 1
4010 4720 5615 9370
RISER DOWN TO
1351.64 800 228.4 700 700 230 270 2270 460 720 500 500
EXISTING FLOOR SLOT
WIRING FCU 4 FCU
WIRING FCU 4 FCU
DCPB 1&2
DCPB 1&2
600 600 600 600 600 600 600 600 1000
FCU
FCU
689.94 350 500
ODF ODF 600 600 600 600 ODF ODF
STORAGE PROP. PROP. PROP. PROP. PROP. PROP. PROP. PROP.
612
CR
RECTIFIER RECTIFIER RECTIFIER RECTIFIER RECTIFIER RECTIFIER RECTIFIER RECTIFIER
DCPB 3&4
DCPB 3&4
CR
1750 SYSTEM 1 SYSTEM 1 SYSTEM 1 SYSTEM 1 SYSTEM 2 SYSTEM 2 SYSTEM 2 SYSTEM 2
PROP. 5TR
(STAND-BY)
MDF MDF
PROP. 5TR
1100
FCU 2
FCU 3
506 506
FCU 3
FCU 3
FCU 1
FCU 1
HUAWEI 600 HUAWEI 20AT, 230V, 3P
OPT 600 600 560 600 600 OPT 288 NEMA 1 ECB
HUAWEI
OPT
OPT
600
AG 1 AG 1 AS AG 1 AG 1 600 AG 1 AG 1 AS AG 1 AG 1
600 ODF ODF
300
ODF
ODF
5890 421.78
2380 1050 200 LOCKER 5890
EQP'T ROOM ROOM EQP'T ROOM
506
350 350
DOWN
DOWN
PROP 5TR
NEMA 1 ECB
20AT, 230V, 3P
FCU1
(working) 288
1250 600 600 1200 600
DCPDB 2
(CISCO)
PROP.
LOT 2
PROP.
SWITCHING 3100 600
SWITCHING
600 3100
2 2
UP
UP
FCU 14
FCU 14
FCU 13
FCU 13
4300
580 580
ROOM ROOM
DCPDB 1
(CISCO)
PROP.
LOT 2
PROP.
600 600
600 600 600 600 1700 680
PROP. CEN
HUAWEI HUAWEI HUAWEI HUAWEI HUAWEI HUAWEI
(CISCO)
300 ODF 400 ODF
EQUIP EQUIP EQUIP EQUIP EQUIP EQUIP 600
PROP.
600
ODF
800 900
3900 3900
ODF
ODF
600 300 600
700
OLT ROOM OLT ROOM
EQUIP
EQUIP
600 600
4090 4090
EQUIP
EQUIP
600 600
OFFICE OFFICE
DCPDB
DCPDB
600 600
PROP. LOT 1
1050 1050
(CISCO)
350 350
3 3
SMART SMART
TNT ACU
TNT ACU
ROOM 600
ROOM 600 600
PROP 2.5HP
WACU
(stand-by)
460 580 950 580 860 460 580 950 580 860
LEGEND:
EXISTING
PROPOSED
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 3x5TR FCU,
PROJECT DESCRIPTION: 1xWACU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PARTIAL SITE DEVELOPMENT PLAN (2ND FLOOR)
ME-10
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY:
CORPORATION
SITE ADDRESS: KALIPULAKO ST. EXTENSION, LIPA, BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-15
LONGITUDE: 120°9'35.74" LATITUDE: 13°56'15.69'' PLACE ISSUE: DATE APPROVED:
B 4872.57
C 14447.43
D B 4872.57
C 14447.43
D
HARD DRAWN COPPER TUBE HARD DRAWN COPPER TUBE
3 3
8"Ø LIQUID LINE RISER UP GOING TO 8"Ø LIQUID LINE RISER DOWN GOING
1 1
9370
RISER UP TO 2ND FLOOR 3 SECOND FLOOR RISER DOWN TO 3 TO FIRST FLOOR
EQUIPMENT ROOM 4"Ø GAS LINE 4"Ø GAS LINE
EXISTING FLOOR SLOT
ALCATEL E.F.
PR-2K18
SEL PROP. 1000AH PROP. 1000AH PROP. 1000AH PROP. 1000AH
WIRING FCU 4 FCU
DCPB 1&2
600 600 600 600 600 600 600 600 1000
FCU
BATTERY BANK BATTERY BANK BATTERY BANK BATTERY BANK
DT-REC
600 600 600 600
(DPC) (DPC) (DPC) (DPC)
PROP. 5TR
ACCU 1&2
ODF ODF
ALCATEL
RECTI
PROP. PROP. PROP. PROP. PROP. PROP. PROP. PROP.
ARGUS FUSE 1
612
CR
RECTIFIER RECTIFIER RECTIFIER RECTIFIER RECTIFIER RECTIFIER RECTIFIER RECTIFIER
ALCATEL
PROP. 1000AH PROP. 1000AH PROP. 1000AH PROP. 1000AH
DCPB 3&4
BATTERY
REC
BATTERY
600 BATTERY BANK BATTERY BANK 600 600 BATTERY BANK BATTERY BANK 600
PCM ROOM
BANK 1
BANK 2
AG 2 AG 2 AG 2 AG 2 NEMA 1 ECB
ACBEL
RECTI
PROP. 5TR
(STAND-BY)
MDF
PROP. 5TR
PR-1A
FCU 2
FCU 3
40AT, 230V, 3P
PROP. 500AH PROP. 500AH PROP. 500AH PROP. 500AH
NEMA 4X ECB 506 506
600 EXP TO 1000AH EXP TO 1000AH 600 600 EXP TO 1000AH EXP TO 1000AH 600
FCU 3
FCU 1
BATTERY BANK BATTERY BANK BATTERY BANK BATTERY BANK
(DPC) (DPC) (DPC) (DPC) HUAWEI 20AT, 230V, 3P
PACU-12
OPT 288 NEMA 1 ECB
ARGUS
PROP. 5TR
RECTI
570 600 800 600 580 600 800 600 570 PROPOSED WALL
CABLE
ACCU 3
HUAWEI
ARGUS FUSE 2
OPT
700
AS AG 1
BATTERY
AG 1
BATTERY
AG 1
VAULT AG 1
BANK 1
BANK 2
ODF
ACBEL
ARGUS
RECTI
PACU-11
40AT, 230V, 3P
ODF
5890 5890
NEMA 4X ECB
RENOVATED C.R.
PROP. ACU
EQP'T ROOM
BATTERY RECTIFIER MAIN PANEL 350
506
DOWN
PROPOSED WALL NEMA 4X PROP 5TR
NEMA 1 ECB
20AT, 230V, 3P
FCU1
288
ROOM ROOM
(working)
UP
1050 1250
HUAWEI
EQUIP
DCPB HUAWEI HUAWEI 300 1200
EQUIP EQUIP
MDF CR
DCPDB 2
(CISCO)
PROP.
LOT 2
PROP.
600
SWITCHING
600 3100
2 2
HALLWAY
UP
FCU 14
FCU 13
ROOM
DCPDB 1
(CISCO)
PROP.
LOT 2
PROP.
600 600
680
PROP. CEN
HUAWEI HUAWEI HUAWEI
(CISCO)
PACU-E
PR-1 (MAIN)
LP-1 PP-1 ODF
MDP
EQUIP EQUIP EQUIP 600
PROP.
ATS
ODF
MTS 900
600AT
MTS
3900
ODF
300 600
OLT ROOM
EQUIP
PR-2K18
ECB
600
EQUIP
GEN-SET A
600
OFFICE
DCPDB
600
GENSET
D-85 FUEL
PROP. LOT 1
1050
(CISCO)
TANK
350
3 3
SMART
TNT ACU
ROOM
ROOM 600 600
600 300
STEP
UP
307.5 305
STEP
PROP 2.5HP
WACU
(stand-by)
UP
LEGEND:
EXISTING
PROPOSED
REFRIGERANT PIPE:
3
8"Ø LIQUIDLINE (5TR)
3
4"Ø GAS LINE (5TR)
PROPOSED FCU
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 3x5TR FCU,
PROJECT DESCRIPTION: 1xWACU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED REFRIGERANT PIPE LAYOUT
ME-11
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY:
CORPORATION
SITE ADDRESS: KALIPULAKO ST. EXTENSION, LIPA, BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-15
LONGITUDE: 120°9'35.74" LATITUDE: 13°56'15.69'' PLACE ISSUE: DATE APPROVED:
B 4872.57
C 14447.43
D
RISER DOWN GOING
1
9370
RISER DOWN TO TO FIRST FLOOR
EXISTING FLOOR SLOT
WIRING FCU 4 FCU
DCPB 1&2
600 600 600 600 600 600 600 600 1000
FCU
ODF ODF 25mmØ PVC BLUE
PROP.
RECTIFIER
PROP.
RECTIFIER
PROP.
RECTIFIER
PROP.
RECTIFIER
PROP.
RECTIFIER
PROP.
RECTIFIER
PROP.
RECTIFIER
PROP.
RECTIFIER
612 PIPE DRAIN PIPE;
CR
DCPB 3&4
SYSTEM 1 SYSTEM 1 SYSTEM 1 SYSTEM 1 SYSTEM 2 SYSTEM 2 SYSTEM 2 SYSTEM 2
PCM ROOM AG 2 AG 2 AG 2 AG 2
20AT, 230V, 3P
NEMA 1 ECB TAP TO NEAREST
CATCH BASIN
PROP. 5TR
(STAND-BY)
MDF
PROP. 5TR
FCU 2
FCU 3
506 506
FCU 3
FCU 1
HUAWEI 20AT, 230V, 3P
PROPOSED WALL
HUAWEI
OPT
AG 1 AG 1 AS AG 1 AG 1
ODF
ODF
5890 EQP'T ROOM
25mmØ PVC BLUE 350
506
DOWN
PIPE DRAIN PIPE; PROP 5TR
NEMA 1 ECB
20AT, 230V, 3P
FCU1
(working) 288
TAP TO EXISTING
DRAIN LINE 1050 1250
HUAWEI
EQUIP
DCPB HUAWEI HUAWEI 300 1200
EQUIP EQUIP
CR
DCPDB 2
(CISCO)
PROP.
LOT 2
PROP.
600
SWITCHING
600 3100
UP
FCU 14
FCU 13
ROOM
DCPDB 1
(CISCO)
PROP.
LOT 2
PROP.
600 600
680
PROP. CEN
HUAWEI HUAWEI HUAWEI
(CISCO)
ODF
EQUIP EQUIP EQUIP 600
PROP.
ODF
900
3900
ODF
300 600
OLT ROOM
EQUIP
600
4090
EQUIP
600
OFFICE
DCPDB
600
PROP. LOT 1
1050
(CISCO)
350
3
SMART
TNT ACU
ROOM 600 600
600 300
307.5 305
PROP 2.5HP
WACU
(stand-by)
LEGEND:
EXISTING
PROPOSED
DRAIN PIPE
PLDT LIPA 25mmØ PVC BLUE PIPE
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 3x5TR FCU,
PROJECT DESCRIPTION: 1xWACU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED DRAIN LINE LAYOUT
ME-12
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY:
CORPORATION
SITE ADDRESS: KALIPULAKO ST. EXTENSION, LIPA, BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-15
LONGITUDE: 120°9'35.74" LATITUDE: 13°56'15.69'' PLACE ISSUE: DATE APPROVED:
PLDT LIPA
1 PROPOSED ACCU AND PANELS LAYOUT ISOMETRIC VIEW LEGEND:
ME-13
EXISTING
PROPOSED
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 3x5TR FCU,
PROJECT DESCRIPTION: 1xWACU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED ACCU AND PANELS LAYOUT ISOMETRIC VIEW
ME-13
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY:
CORPORATION
SITE ADDRESS: KALIPULAKO ST. EXTENSION, LIPA, BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-15
LONGITUDE: 120°9'35.74" LATITUDE: 13°56'15.69'' PLACE ISSUE: DATE APPROVED:
CONCRETE CEILING
AR
EB
GL AL
AN ST
25mmØ DRAIN LINE TAP TO E DE
P
NEAREST DRAIN CONNECTION
mm
400
±1.75m.
±2.05m.
P-TRAP
ACCU 5TR
936mm x 336mm x 722mm
1.0m.
PLDT LIPA
1 FCU & ACCU MOUNTING DETAILS
ME-14
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 3x5TR FCU,
PROJECT DESCRIPTION: 1xWACU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
MOUNTING DETAILS
ME-14
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY:
CORPORATION
SITE ADDRESS: KALIPULAKO ST. EXTENSION, LIPA, BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-15
LONGITUDE: 120°9'35.74" LATITUDE: 13°56'15.69'' PLACE ISSUE: DATE APPROVED:
1 DRAIN PIPE DETAILS
ME - 15 NOT TO SCALE
2 PIPE SUPPORT DETAILS
ME - 15 NOT TO SCALE
3 PIPE HANGER DETAILS
ME - 15 NOT TO SCALE
PLDT LIPA
MISCELLANEOUS DETAILS
ME-15
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 3x5TR FCU,
PROJECT DESCRIPTION: 1xWACU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
MISCELLANEOUS DETAILS
ME-15
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY:
CORPORATION
SITE ADDRESS: KALIPULAKO ST. EXTENSION, LIPA, BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-15
LONGITUDE: 120°9'35.74" LATITUDE: 13°56'15.69'' PLACE ISSUE: DATE APPROVED: