You are on page 1of 15

A 33850

B 4872.57
C 14447.43
D E3050 3150
F
PROPOSED EXISTING C.R. TO BE
GENERAL NOTES: DISMANTLED AND CONVERT IT TO NEW

1
BATTERY ROOM
ALCATEL PR-2K18
SEL

DT-REC
ALCATEL
CR

RECTI
ARGUS FUSE 1

ALCATEL
BATTERY
BATTERY

REC
BANK 1
BANK 2
UTILITY

ACBEL

ACBEL
RECTI

PR-1A
ROOM

PACU-12
ARGUS
RECTI

STORAGE
CABLE CR

ARGUS FUSE 2

BATTERY
BATTERY
VAULT

ROOM
BANK 2
BANK 1
ACBEL

ARGUS
RECTI
6090

PACU-11
BATTERY RECTIFIER
ROOM ROOM

UP
MDF

2
HALLWAY

PACU-E

PR-1 (MAIN)
LP-1

GUARD
PP-1

HOUSE
PROPOSED NEW GENSET ROOM
MDP ATS
MTS

600AT
MTS
LOCATION

PR-2K18
ECB
4090 OFFICE GEN-SET A

GENSET

D-85 FUEL
3

TANK
ROOM

STEP
UP
STEP
UP
5550

DAY TANK

4 TV5 GENSET STORAGE STORAGE


ROOM

4858.86

5
ROOM

KALIPULAKO ROAD
TV5 EQP'T
ROOM

15701.58

STORAGE
PUMP
OFFICE OFFICE

KALIPULAKO ROAD
BUSINESS
CR OFFICE

10559.55

EXISTING SERVICE
ENTRANCE

7
VICINITY MAP KALIPULAKO ST. EXTENSION

KALIPULAKO ROAD
EXISTING 3-100KVA
TRANSFORMER
PLDT LIPA
1 EXISTING SITE DEVELOPMENT PLAN
ME-01
LEGEND:
EXISTING
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 3x5TR FCU,
PROJECT DESCRIPTION: 1xWACU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
EXISTING SITE DEVELOPMENT PLAN
ME-01
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY:
CORPORATION

SITE ADDRESS: KALIPULAKO ST. EXTENSION, LIPA, BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-15
LONGITUDE: 120°9'35.74" LATITUDE: 13°56'15.69'' PLACE ISSUE: DATE APPROVED:
A 33850
A-1 A-2 A-3 B 4872.57
C 14447.43
D E 3050 3150
F
4602.81 4602.81

1 9400

GB
RISER UP TO 2ND FLOOR
EQUIPMENT ROOM

ALCATEL
SEL
PR-2K18
PROP. 1000AH PROP. 1000AH PROP. 1000AH PROP. 1000AH
E.F.

DT-REC
600 BATTERY BANK BATTERY BANK 600 600 BATTERY BANK BATTERY BANK 600
(DPC) (DPC) (DPC) (DPC)
30AT.
ELPP

PROP. 5TR
ACCU 1&2
2P ECB

ALCATEL
RECTI
PROPOSED 8000L

1200

ARGUS FUSE 1
PROPOSED 800L MANUAL
FP

ALCATEL
PROP. 1000AH PROP. 1000AH PROP. 1000AH PROP. 1000AH
DAY TANK PUMP

BATTERY
BATTERY BANK BATTERY BANK BATTERY BANK BATTERY BANK

BATTERY

REC
600 600 600 600

BANK 1
BANK 2
UTILITY
(DPC) (DPC) (DPC) (DPC)

ACBEL
FUEL

E.F.
1900 2300

2160

ACBEL
RECTI

PR-1A
40AT, 230V, 3P

STORAGE TANK PROP.


PROP. 500AH
EXP TO 1000AH
PROP. 500AH
EXP TO 1000AH
PROP. 500AH
EXP TO 1000AH
PROP. 500AH
EXP TO 1000AH
NEMA 4X ECB

ROOM

1300
600 600 600 600
BATTERY BANK BATTERY BANK BATTERY BANK BATTERY BANK
(DPC) (DPC) (DPC) (DPC)

1000

PACU-12
SWITCHBOARD

ARGUS

PROP. 5TR
RECTI
CABLE
570 600 800 600 580 600 800 600 570

2000

ACCU 3
4790

1680

ARGUS FUSE 2
700

BATTERY
BATTERY
VAULT

BANK 2
BANK 1
3260

ACBEL

ARGUS
RECTI
350
3660 E.F.

1200
PROPOSED WALL

800
1750

6090

PACU-11
40AT, 230V, 3P
NEMA 4X ECB

PROPOSED 500KW
1.1
RENOVATED C.R.

1110
PROP. ACU
OPEN TYPE GENSET BATTERY RECTIFIER

PROP. ELVSG - TIE


MAIN PANEL
PROPOSED WALL NEMA 4X

ROOM ROOM

UP
350

3000
MDF

1500
HALLWAY

350
PACU-E

LP-1

PROP. ATS-2 PROP. ATS-1 PROP.


PR-1 (MAIN)

PP-1

GUARD
HOUSE
MDP
PROPOSED 500KW ATS
MTS

1110

950

600AT
MTS
OPEN TYPE GENSET
5160

350

PR-2K18
950

ECB
2.1 4090 OFFICE GEN-SET A

1500

1000
2700

MDP
E.F.
GENSET

D-85 FUEL
TANK
3
ROOM

1100

STEP
UP
6300

STEP
UP
5550

DAY TANK

4 TV5 GENSET STORAGE STORAGE


ROOM

4858.86

5
ROOM

KALIPULAKO ROAD
TV5 EQP'T
ROOM

15701.58

STORAGE
PUMP
OFFICE OFFICE

KALIPULAKO ROAD
BUSINESS
CR OFFICE

10559.55

7
KALIPULAKO ST. EXTENSION

KALIPULAKO ROAD
PROPOSED3x167KVA
PLDT LIPA
1 PROPOSED SITE DEVELOPMENT PLAN LEGEND:
ME-02
EXISTING

PROPOSED

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 3x5TR FCU,
PROJECT DESCRIPTION: 1xWACU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED SITE DEVELOPMENT PLAN
ME-02
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY:
CORPORATION

SITE ADDRESS: KALIPULAKO ST. EXTENSION, LIPA, BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-15
LONGITUDE: 120°9'35.74" LATITUDE: 13°56'15.69'' PLACE ISSUE: DATE APPROVED:
NOTES:
1. The diesel fuel transfer pump shall be positive rotary gear pump, fitted with mechanical seal and pressure relief valve.
2. The diesel fuel transfer pump should be rated at 36L/min at 15 meters TDH, coupled to 1hp electric motor, 1750 rpm, 230volts, 1phase, 60 hertz.
3. Diesel fuel transfer pump shall be US or Japan made, "Roper", "Viking", "Tuthill", Sherwood" or approved equal.
4. Proposed fuel supply lines existing fuel storage tank to skid mounted Genset Base tank shall be 1-1/2" B.I. Sched. 40.
5. The existing Genset Base tank shall be provided with float switch for controlling the motor driven auxiliary fuel transfer pump for low and high fuel level.Acceptable brands
are Fozmula, Kohgiken Mac-3 or approved equal
6. The existing Genset shall be provided with battery trickle charger, including power wires and conduit. Submit schematic diagram, brochure and shop drawing for approval
of PLDT.
7. Complete mounting of 500KW skid mounted generator set is included in the scope of work of the contractor.
8. Replacement of Genset batteries, air filters, fuel filters, oil filters and lubricating oil is included in the scope of work of the contractor.
9. Provision of New 2x500KW GENSET (OPEN TYPE)
10. All necessary accessories needed to operate the 2x500KW (OPEN TYPE) shall be provided by the contractor.
RAIN CAP

EXHAUST HEIGHT SHOULD BE


0.8-1m ABOVE THE PARAPET WALL

MUFFLER PIPE SUPPORT

MUFFLER/PIPE HANGER

EXHAUST PIPE INSULATION WITH SPRING HANGER


Ga. #26 ALUMINUM CLADDING SUPPORT (TYPICAL)

EXHAUST PIPE
EXHAUST MUFFLER
OF GENSET

DENR TEST PORT


250mm DIA. B.I PIPE SCHED 40 WITH ROCKWOOL
INSULATION & ALUMINUM CLADDING (WITHIN GENSET EXHAUST THIMBLE
ROOM CANVASS
FLEXIBLE EXHAUST PIPE CONNECTOR (SEE DETAIL)
CONNECTOR WITH Ga.#14 EXISTING REMOVABLE METAL LOUVER
EXPANDED METAL GUARD FOR GENSET HOT AIR EXHAUST
(BY OTHERS)
CONDENSATE DRAIN
G.I. PIPE 15mm DIA.

ACESS DOOR
FOR RADIATOR
HOT AIR DUCT

HOT AIR DUCT


1.4W x 1.8H
PROPOSE 625KVA (500KW) GENSET Ga.16 G.I. SHEET

NEOPRENE RUBBER PAD (TYPICAL)

PLDT LIPA
1 PROPOSED 500KW OPEN TYPE GENSET
ME-03

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 3x5TR FCU,
PROJECT DESCRIPTION: 1xWACU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED 500KW OPEN TYPE GENSET
ME-03
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY:
CORPORATION

SITE ADDRESS: KALIPULAKO ST. EXTENSION, LIPA, BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-15
LONGITUDE: 120°9'35.74" LATITUDE: 13°56'15.69'' PLACE ISSUE: DATE APPROVED:
A-1 A-2 A-3 B
4602.81 4602.81 2124.38

1 PROPOSED 8000L
30AT.
2P ECB
GB

ELPP

1200
PROPOSED 800L MANUAL
DAY TANK PUMP
FP

FUEL

E.F.
1900 2300

2160
STORAGE TANK PROP.

1300

1000
SWITCHBOARD

2000
4776.31

1680
3260

350
3660

1200

800
PROPOSED 500KW

1.1

1110
OPEN TYPE GENSET

PROP. ELVSG - TIE


350

3000
1500
1315.79

350

PROP. ATS-2 PROP. ATS-1 PROP.


PROPOSED 500KW

1110

950
OPEN TYPE GENSET

350

950
2.1 3476.71

1500

1000
2700

MDP
E.F.
3 612.18

1100

6300
5539.28

4 PLDT LIPA
LEGEND:
EXISTING

PROPOSED
1 PROPOSED FUEL PIPE LINE LAYOUT FUEL PIPE LINE
ME-04
EXHAUST FAN

PROP. PIPE TRENCH


CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 3x5TR FCU,
PROJECT DESCRIPTION: 1xWACU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED FUEL PIPE LINE LAYOUT ME-04
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY:
CORPORATION

SITE ADDRESS: KALIPULAKO ST. EXTENSION, LIPA, BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-15
LONGITUDE: 120°9'35.74" LATITUDE: 13°56'15.69'' PLACE ISSUE: DATE APPROVED:
NOTES:
1. THE DIESEL DUEL DIAGRAM TRANSFER PUMP MUST BE:
a. POSITIVE ROTARY GEAR PUMP, FITTED WITH MECHANICAL SEAL AND PRESSURE RELIEF VALVE.
b. RATED AT 15GPM AT 15m TDH, COUPLED TO 1HP ELECTRIC MOTOR, 1750 RPM, 230V,1PH,60HZ.
c. U.S OR JAPAN MADE, "ROPER", "VIKING", "SHERWOOD" OR EQUAL APPROVED.
2. FUEL LINES TO DAYTANK SHALL BE B.I SCHED . 40 AND SHALL BE PROVIDED WITH THE FOLLOWING: BRONZE Y-STRAINER,CHECK VALVES, BALL VALVES,
PIPE SUPPORTS AND CLAMPS. BRAND OF VALVES MUST BE "KITZ", "TOZEN" , OR EQUAL APPROVED.
3. THE EXISTING FUEL DAYTANK SHALL BE PROVIDED WITH FLOAT SWITCH FOR CONTROLLING THE MOTOR DRIVEN AUXILIARY FUEL PUMP FOR LOW AND
HIGH FUEL LEVEL ALARMS. ACCEPTABLE BRANDS ARE FOZMULA, KOHGIKENOR APPROVED EQUAL.
4. THE CONTRACTOR SHALL SUBMIT LAYOUT OF FUEL PIPE TRENCH FROM FUEL STORAGE TO GENSET FUEL TANK.
5. ACCEPTABLE BRAND OF PUMP CONTROL PANEL ARE SCHNEIDER OR APPROVED EQUAL.
6. ACCEPTABLE BRAND OF MANUL PUMP ARE TOKHEIM,TUTHILL,FILTRITE OR APPROVED EQUAL.
7. SUBMIT BROCHURE OF 500KW GENSET FOR APPROVAL PRIOR TO PURCHASE/DELIVERY.
8. THE GENSET MUST BE LOAD TESTED FOR 4HRS FULL LOAD PRIOR TO DELIVERY TO SITE.

PROPOSED PUMP
CONTROL PANEL
PROPOSED 25mmØ
B.I. SCHED 40 PIPE IN
500KW, 3P, 230V
FUEL PIPE TRENCH
/ EMBEDDED PROPOSED
FLOAT SWITCH
PROPOSED 625KVA GENSET 1
BALL Y CHECK BALL
PROPOSED BALL
VALVE
CHECK VALVE Y
STRAINER
BALL
VALVE
BALL
VALVE
CHECK
VALVE
VALVE STRAINER VALVE VALVE
PROPOSED 800
FUEL STORAGE M LITERS DAYTANK

TANK PROPOSED
MOTORIZED PUMP
BALL
VALVE

8000 L
BALL BALL
VALVE VALVE 500KW, 3P, 230V

PROPOSED PROPOSED 625KVA GENSET 2


MANUAL PUMP Y CHECK BALL
STRAINER VALVE VALVE

PLDT LIPA
1 PROPOSED FUEL LINE SCHEMATIC DIAGRAM
ME-05

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 3x5TR FCU,
PROJECT DESCRIPTION: 1xWACU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED FUEL LINE SCHEMATIC DIAGRAM
ME-05
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY:
CORPORATION

SITE ADDRESS: KALIPULAKO ST. EXTENSION, LIPA, BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-15
LONGITUDE: 120°9'35.74" LATITUDE: 13°56'15.69'' PLACE ISSUE: DATE APPROVED:
EQUIPMENT SCHEDULE EQUIPMENT SCHEDULE
30AT.
GB
(PROPOSED GENSET ROOM) ( BATTERY ROOM, 1ST FLOOR )
2P ECB ELPP
PROPOSED 800L MANUAL
FP 1200
DAY TANK PUMP
PROPOSED WALL MOUNT EXHAUST FAN PROPOSED AUTO SHUTTER EXHAUST FAN
E.F.

2160
PROP.
1300
1000 SWITCHBOARD
2000 E.F.
1680 600
PROP. 1000AH
BATTERY BANK
PROP. 1000AH
BATTERY BANK 600 600
PROP. 1000AH
BATTERY BANK
PROP. 1000AH
BATTERY BANK 600
(DPC) (DPC) (DPC) (DPC)

350

PROP. 5TR
ACCU 1&2
1200 800
PROP. 1000AH PROP. 1000AH PROP. 1000AH PROP. 1000AH
BATTERY BANK BATTERY BANK BATTERY BANK BATTERY BANK
600 600 600 600
PROPOSED
PROPOSED 500KW 1110
(DPC) (DPC) (DPC) (DPC)

630CMH AUTO
OPEN TYPE GENSET
PROP. ELVSG - TIE
40AT, 230V, 3P

600
PROP. 500AH
EXP TO 1000AH
BATTERY BANK
PROP. 500AH
EXP TO 1000AH
BATTERY BANK
600 600
PROP. 500AH
EXP TO 1000AH
BATTERY BANK
PROP. 500AH
EXP TO 1000AH
BATTERY BANK
600
NEMA 4X ECB
SHUTTER
(DPC) (DPC) (DPC) (DPC)
EXHAUST FAN

PROP. 5TR
570 600 800 600 580 600 800 600 570

ACCU 3
PROPOSED 350
700
3100CMH WALL
MOUNT EXHAUST 3000 AIR CHANGES CALCULATION (CMH) PROPOSED WALL E.F. AIR CHANGES CALCULATION (CMH)
1750
FAN
1500 NO. OF TOTAL CMH AIR NO. OF TOTAL CMH AIR
L(M) W(M) H(M) VOLUME(M) EXHAUST FAN (EXHAUST FAN) CHANGES/HR V1(M) V2(M) VT(M)
EXHAUST FAN (EXHAUST FAN) CHANGES/HR

PROPOSED WALL
350 8.78 8.4 4 295 2 3100 21.02 50.05 6.87 56.92 2 630 22.14
PROP. ATS-2 PROP. ATS-1 PROP.

PROPOSED 500KW 1110 950


OPEN TYPE GENSET CALC. CALC.
PLDT STANDARD: 15 AIR PLDT STANDARD: 15 AIR
AIR CHANGES = VCMH / VOLUME (M) AIR CHANGES = VCMH / VOLUME (M)
CHANGES/HR CHANGES/HR
350 AIR CHANGES = 2x3100/295 AIR CHANGES = 2x630/56.92
950 REMARKS: (SUFFICIENT AIR CHANGES) REMARKS: (SUFFICIENT AIR CHANGES)
AIR CHANGES = 21.02 AIR CHANGES = 22.14

1500
NOTE: NOTE:
1000
PROP. EF OUTLET TO BE INSTALLED BESIDE THE PROP. EXHAUST FAN PROP. EF OUTLET TO BE INSTALLED BESIDE THE PROP. EXHAUST FAN
MDP
E.F.

2700
OR INSTALLATION BASED ON PLDT STANDARD OR INSTALLATION BASED ON PLDT STANDARD

1100
PLDT LIPA
6300 2 PROPOSED BATTERY ROOM (1ST FLR.)
ME-06
PLDT LIPA
1 PROPOSED GENSET ROOM
ME-06

PLDT LIPA
PROPOSED EXHAUST FAN LAYOUT
ME-06

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 3x5TR FCU,
PROJECT DESCRIPTION: 1xWACU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED EXHAUST FAN LAYOUT
ME-06
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY:
CORPORATION

SITE ADDRESS: KALIPULAKO ST. EXTENSION, LIPA, BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-15
LONGITUDE: 120°9'35.74" LATITUDE: 13°56'15.69'' PLACE ISSUE: DATE APPROVED:
NOTE:
1. ALL ANGLE BARS (50mm X 50mm X6mm) CONNECTION MUST BE FULLY
WELDED ON ALL JOINTS.
2. DAYTANK MUST BE REPAINTED WITH PRIMER PAINT AND FINISHED WITH
ENAMEL PAINT. 1300mm
3. SEE CE FOR DAYTANK BUNDWALL DETAILS.
600mm FLOAT SWITCH

VENT LINE 400X300 HAND HOLE


25mm DIA. B.I. SCHED. 40 WITH GASKET INSERT 25mm DIA. B.I. SCHED. 40
FUEL RETURN LINE FROM ON STEEL COVER FUEL DELIVERY LINE
GENSET

15mm SIGHT GLASS


WITH GUARD SCREEN
(ALL AROUND)
1200mm
GA # 14 B.I. SHEET

GUARD SCREEN
BRACKET SUPPORT

50mm X 50mm X 6mm


ANGLE BARS FULLY
WELD ON ALL JOINTS
EXISTING 38mm DIA GATE
GROUND WIRE VALVE FOR DRAIN
TO BE TAPPED
1000mm
32mm DIA. B.I. SCHED. 40
FUEL SUPPLY LINE
PROPOSED CONTAINMENT
(SEE CE FOR DETAILS)

FINISHED FLOOR LINE


150x150x5mm BASE
PLATE WITH 4PCS. 6mm DIA.
SELF DRILLING ACHOR BOLT
PROPOSED CONTAIMENT
(SEE CE FOR DETAILS)
PLDT LIPA
1 PROPOSED 800L DAY TANK SHOP DRAWING
ME-07

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 3x5TR FCU,
PROJECT DESCRIPTION: 1xWACU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED DAY TANK SHOP DRAWING ME-07
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY:
CORPORATION

SITE ADDRESS: KALIPULAKO ST. EXTENSION, LIPA, BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-15
LONGITUDE: 120°9'35.74" LATITUDE: 13°56'15.69'' PLACE ISSUE: DATE APPROVED:
3710

1500

TOP VIEW

3710

1500
CONCRETE LEG SUPPORT

CONCRETE LEG SUPPORT

CONCRETE LEG SUPPORT

SIDE VIEW
NOTE: FRONT VIEW
1. FUEL STORAGE TANK MUST BE REPAINTED WITH PRIMER PAINT AND FINISHED WITH ENAMEL PAINT.
2. FUEL DAYTANK AND FUEL STORAGE TANK SHALL BE PROVIDED WITH BUNDWALL EQUIVALENT TO
110% OF FUEL CAPACITY.

PLDT LIPA
1 PROPOSED FUEL STORAGE TANK DETAILS AND COMPUTATION
ME-08

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 3x5TR FCU,
PROJECT DESCRIPTION: 1xWACU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROP. FUEL STORAGE TANK DETAILS
ME-08
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY:
CORPORATION AND COMPUTATIONS
SITE ADDRESS: KALIPULAKO ST. EXTENSION, LIPA, BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-15
LONGITUDE: 120°9'35.74" LATITUDE: 13°56'15.69'' PLACE ISSUE: DATE APPROVED:
EXHAUST PIPE

CONRETE WALL
4-12mm dia. LONGITUDINAL SEAM
BOLT, NUT AND PIPE INSULATION CROSS-SECTIONAL SEAM
WASHER
PERLITE BLOCK
INSULATION

4" x 2mm THICK 4" x 2mm THICK PIPE SLEEVE


STEEL FURLINS STEEL FURLINS

C-CHANNEL
FICEMBOARD FICEMBOARD
EXHAUST PIPE

12mm DIA. THREADED Ga. No.26 ALUMINUM


STEEL ROD HANGER SHEET METAL CLADDING 12mmO 45 deg. G.I.
SPRING HANGER SUPPORT ELBOW CONDENSATE

400mm x 400mm x 4mm


Ga. No.26 ALUMINUM
INSULATION mild steel masking plate
METAL CLADDING
EXHAUST PIPE
CLADDING both sides
INSULATION BLIND RIVET

LONGITUDINAL AND
CROSS-SECTIONAL SEAM
(TYPICAL)

EXHAUST PIPE HANGER DETAIL EXHAUST THIMBLE PIPE EXHAUST CLADDING DETAIL

COUNTER 1" SQUARE BAR RAILINGS SPACED @ 25mm


FULL WELDED
WEIGHT HINGE
1" SQUARE BAR
CAP
2- 1" x 1" x 1/4 " ANGLE BAR FULL WELD 0.50m
WITH 10mm STEEL DOWELS @ 0.30m 0.10m

EGL
3000PSI CONCRETE
EXPANSION REINFORCED WITH
CLAMP 10MM DIA. BARS
BOLT PROPOSED 32mm 0.40m
FUEL SUPPLY LINES
2"PVC DRAIN PIPE
TO BE CLAMPLED
TO TRENCH WALL
@ EVERY 0.40m
CLAMPING 0.10
BAND
NOTE:
1. DRAIN TO BE TAPPED TO THE NEAREST EXISTING DRAINAGE SYSTEM
2. VERIFY JOBSITE AND SUBMIT SHOP DRAWINGS FOR APPROVAL.

PIPE SUPPORT DETAILS EXHAUST THIMBLE DETAIL PIPE TRENCH DETAILS

PLDT LIPA
1 MISCELLANEOUS DETAILS
ME-09

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 3x5TR FCU,
PROJECT DESCRIPTION: 1xWACU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
MISCELLANEOUS DETAILS
ME-09
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY:
CORPORATION

SITE ADDRESS: KALIPULAKO ST. EXTENSION, LIPA, BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-15
LONGITUDE: 120°9'35.74" LATITUDE: 13°56'15.69'' PLACE ISSUE: DATE APPROVED:
B C D B C D
PROPOSED TO
DEMOLISH FOR
RENOVATION
4872.57 14447.43 4872.57 14447.43

1 1
4010 4720 5615 9370
RISER DOWN TO
1351.64 800 228.4 700 700 230 270 2270 460 720 500 500
EXISTING FLOOR SLOT
WIRING FCU 4 FCU
WIRING FCU 4 FCU

DCPB 1&2

DCPB 1&2
600 600 600 600 600 600 600 600 1000
FCU

FCU
689.94 350 500
ODF ODF 600 600 600 600 ODF ODF
STORAGE PROP. PROP. PROP. PROP. PROP. PROP. PROP. PROP.
612

CR
RECTIFIER RECTIFIER RECTIFIER RECTIFIER RECTIFIER RECTIFIER RECTIFIER RECTIFIER

DCPB 3&4

DCPB 3&4
CR
1750 SYSTEM 1 SYSTEM 1 SYSTEM 1 SYSTEM 1 SYSTEM 2 SYSTEM 2 SYSTEM 2 SYSTEM 2

PCM ROOM AG 2 AG 2 AG 2 AG 2 600


ROOM PCM ROOM AG 2 AG 2 AG 2 AG 2
20AT, 230V, 3P
NEMA 1 ECB

PROP. 5TR

(STAND-BY)
MDF MDF

PROP. 5TR
1100

FCU 2

FCU 3
506 506
FCU 3

FCU 3
FCU 1

FCU 1
HUAWEI 600 HUAWEI 20AT, 230V, 3P

OPT 600 600 560 600 600 OPT 288 NEMA 1 ECB

600 PROPOSED WALL


313.27
HUAWEI

HUAWEI
OPT

OPT
600
AG 1 AG 1 AS AG 1 AG 1 600 AG 1 AG 1 AS AG 1 AG 1
600 ODF ODF
300
ODF

ODF
5890 421.78
2380 1050 200 LOCKER 5890
EQP'T ROOM ROOM EQP'T ROOM
506
350 350

DOWN

DOWN
PROP 5TR

NEMA 1 ECB
20AT, 230V, 3P
FCU1
(working) 288
1250 600 600 1200 600

1050 1050 1250


HUAWEI HUAWEI
EQUIP EQUIP
DCPB HUAWEI HUAWEI DCPB HUAWEI HUAWEI 300 1200
EQUIP EQUIP EQUIP EQUIP
400 400 CR CR

DCPDB 2

(CISCO)

PROP.
LOT 2
PROP.
SWITCHING 3100 600
SWITCHING
600 3100

2 2
UP

UP
FCU 14

FCU 14
FCU 13

FCU 13
4300
580 580
ROOM ROOM

DCPDB 1

(CISCO)

PROP.
LOT 2
PROP.
600 600
600 600 600 600 1700 680

PROP. CEN
HUAWEI HUAWEI HUAWEI HUAWEI HUAWEI HUAWEI

(CISCO)
300 ODF 400 ODF
EQUIP EQUIP EQUIP EQUIP EQUIP EQUIP 600

PROP.
600

ODF
800 900

3900 3900
ODF

ODF
600 300 600

700
OLT ROOM OLT ROOM
EQUIP

EQUIP
600 600

4090 4090
EQUIP

EQUIP
600 600

OFFICE OFFICE
DCPDB

DCPDB
600 600

PROP. LOT 1
1050 1050

(CISCO)
350 350

3 3
SMART SMART
TNT ACU

TNT ACU
ROOM 600
ROOM 600 600

600 300 600 300

397.5 ACU ACU 400 397.5 ACU ACU 400

307.5 305 307.5 305

PROP 2.5HP
WACU
(stand-by)

460 580 950 580 860 460 580 950 580 860

PLDT LIPA PLDT LIPA


1 EXISTING 2ND FLOOR SITE DEVELOPMENT PLAN 2 PROPOSED 2ND FLOOR SITE DEVELOPMENT PLAN
ME-10 ME-10

LEGEND:
EXISTING

PROPOSED

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 3x5TR FCU,
PROJECT DESCRIPTION: 1xWACU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PARTIAL SITE DEVELOPMENT PLAN (2ND FLOOR)
ME-10
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY:
CORPORATION

SITE ADDRESS: KALIPULAKO ST. EXTENSION, LIPA, BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-15
LONGITUDE: 120°9'35.74" LATITUDE: 13°56'15.69'' PLACE ISSUE: DATE APPROVED:
B 4872.57
C 14447.43
D B 4872.57
C 14447.43
D
HARD DRAWN COPPER TUBE HARD DRAWN COPPER TUBE
3 3
8"Ø LIQUID LINE RISER UP GOING TO 8"Ø LIQUID LINE RISER DOWN GOING

1 1
9370
RISER UP TO 2ND FLOOR 3 SECOND FLOOR RISER DOWN TO 3 TO FIRST FLOOR
EQUIPMENT ROOM 4"Ø GAS LINE 4"Ø GAS LINE
EXISTING FLOOR SLOT
ALCATEL E.F.
PR-2K18
SEL PROP. 1000AH PROP. 1000AH PROP. 1000AH PROP. 1000AH
WIRING FCU 4 FCU

DCPB 1&2
600 600 600 600 600 600 600 600 1000

FCU
BATTERY BANK BATTERY BANK BATTERY BANK BATTERY BANK

DT-REC
600 600 600 600
(DPC) (DPC) (DPC) (DPC)

PROP. 5TR
ACCU 1&2
ODF ODF

ALCATEL
RECTI
PROP. PROP. PROP. PROP. PROP. PROP. PROP. PROP.
ARGUS FUSE 1

612

CR
RECTIFIER RECTIFIER RECTIFIER RECTIFIER RECTIFIER RECTIFIER RECTIFIER RECTIFIER

ALCATEL
PROP. 1000AH PROP. 1000AH PROP. 1000AH PROP. 1000AH

DCPB 3&4
BATTERY

SYSTEM 1 SYSTEM 1 SYSTEM 1 SYSTEM 1 SYSTEM 2 SYSTEM 2 SYSTEM 2 SYSTEM 2

REC
BATTERY

600 BATTERY BANK BATTERY BANK 600 600 BATTERY BANK BATTERY BANK 600

PCM ROOM
BANK 1
BANK 2

(DPC) (DPC) (DPC) (DPC) 20AT, 230V, 3P


ACBEL

AG 2 AG 2 AG 2 AG 2 NEMA 1 ECB

ACBEL
RECTI

PROP. 5TR

(STAND-BY)
MDF

PROP. 5TR
PR-1A

FCU 2

FCU 3
40AT, 230V, 3P
PROP. 500AH PROP. 500AH PROP. 500AH PROP. 500AH
NEMA 4X ECB 506 506
600 EXP TO 1000AH EXP TO 1000AH 600 600 EXP TO 1000AH EXP TO 1000AH 600

FCU 3

FCU 1
BATTERY BANK BATTERY BANK BATTERY BANK BATTERY BANK
(DPC) (DPC) (DPC) (DPC) HUAWEI 20AT, 230V, 3P

PACU-12
OPT 288 NEMA 1 ECB

ARGUS

PROP. 5TR
RECTI
570 600 800 600 580 600 800 600 570 PROPOSED WALL
CABLE

ACCU 3

HUAWEI
ARGUS FUSE 2

OPT
700
AS AG 1
BATTERY

AG 1
BATTERY

AG 1
VAULT AG 1
BANK 1

BANK 2

ODF
ACBEL

ARGUS
RECTI

PROPOSED WALL E.F.


1750

PACU-11
40AT, 230V, 3P

ODF
5890 5890
NEMA 4X ECB

RENOVATED C.R.
PROP. ACU
EQP'T ROOM
BATTERY RECTIFIER MAIN PANEL 350
506

DOWN
PROPOSED WALL NEMA 4X PROP 5TR

NEMA 1 ECB
20AT, 230V, 3P
FCU1
288

ROOM ROOM
(working)

UP
1050 1250
HUAWEI
EQUIP
DCPB HUAWEI HUAWEI 300 1200
EQUIP EQUIP
MDF CR

DCPDB 2

(CISCO)

PROP.
LOT 2
PROP.
600
SWITCHING
600 3100

2 2
HALLWAY

UP
FCU 14

FCU 13
ROOM

DCPDB 1

(CISCO)

PROP.
LOT 2
PROP.
600 600
680

PROP. CEN
HUAWEI HUAWEI HUAWEI

(CISCO)
PACU-E

PR-1 (MAIN)
LP-1 PP-1 ODF
MDP
EQUIP EQUIP EQUIP 600

PROP.
ATS

ODF
MTS 900
600AT
MTS

3900

ODF
300 600

OLT ROOM

EQUIP
PR-2K18
ECB

600

4090 OFFICE 4090

EQUIP
GEN-SET A
600

OFFICE

DCPDB
600

GENSET
D-85 FUEL

PROP. LOT 1
1050

(CISCO)
TANK

350

3 3
SMART

TNT ACU
ROOM
ROOM 600 600

600 300
STEP
UP

397.5 ACU ACU 400

307.5 305
STEP

PROP 2.5HP
WACU
(stand-by)
UP

460 580 950 580 860

PLDT LIPA PLDT LIPA


1 PROPOSED 1ST FLOOR REFRIGERANT PIPE LAYOUT 2 PROPOSED 2ND FLOOR REFRIGERANT PIPE LAYOUT
ME-11 ME-11

LEGEND:
EXISTING

PROPOSED

REFRIGERANT PIPE:
3
8"Ø LIQUIDLINE (5TR)
3
4"Ø GAS LINE (5TR)

PROPOSED FCU

PROP. 20AT FCU ECB

PROP. 40AT ACCU ECB

PROP. ACU PANEL

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 3x5TR FCU,
PROJECT DESCRIPTION: 1xWACU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED REFRIGERANT PIPE LAYOUT
ME-11
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY:
CORPORATION

SITE ADDRESS: KALIPULAKO ST. EXTENSION, LIPA, BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-15
LONGITUDE: 120°9'35.74" LATITUDE: 13°56'15.69'' PLACE ISSUE: DATE APPROVED:
B 4872.57
C 14447.43
D
RISER DOWN GOING

1
9370
RISER DOWN TO TO FIRST FLOOR
EXISTING FLOOR SLOT
WIRING FCU 4 FCU

DCPB 1&2
600 600 600 600 600 600 600 600 1000

FCU
ODF ODF 25mmØ PVC BLUE
PROP.
RECTIFIER
PROP.
RECTIFIER
PROP.
RECTIFIER
PROP.
RECTIFIER
PROP.
RECTIFIER
PROP.
RECTIFIER
PROP.
RECTIFIER
PROP.
RECTIFIER
612 PIPE DRAIN PIPE;
CR

DCPB 3&4
SYSTEM 1 SYSTEM 1 SYSTEM 1 SYSTEM 1 SYSTEM 2 SYSTEM 2 SYSTEM 2 SYSTEM 2

PCM ROOM AG 2 AG 2 AG 2 AG 2
20AT, 230V, 3P
NEMA 1 ECB TAP TO NEAREST
CATCH BASIN

PROP. 5TR

(STAND-BY)
MDF

PROP. 5TR
FCU 2

FCU 3
506 506

FCU 3

FCU 1
HUAWEI 20AT, 230V, 3P

OPT 288 NEMA 1 ECB

PROPOSED WALL

HUAWEI
OPT
AG 1 AG 1 AS AG 1 AG 1
ODF

ODF
5890 EQP'T ROOM
25mmØ PVC BLUE 350
506

DOWN
PIPE DRAIN PIPE; PROP 5TR

NEMA 1 ECB
20AT, 230V, 3P
FCU1
(working) 288
TAP TO EXISTING
DRAIN LINE 1050 1250
HUAWEI
EQUIP
DCPB HUAWEI HUAWEI 300 1200
EQUIP EQUIP
CR

DCPDB 2

(CISCO)

PROP.
LOT 2
PROP.
600
SWITCHING
600 3100

UP
FCU 14

FCU 13
ROOM

DCPDB 1

(CISCO)

PROP.
LOT 2
PROP.
600 600
680

PROP. CEN
HUAWEI HUAWEI HUAWEI

(CISCO)
ODF
EQUIP EQUIP EQUIP 600

PROP.
ODF
900

3900

ODF
300 600

OLT ROOM

EQUIP
600

4090

EQUIP
600

OFFICE

DCPDB
600

PROP. LOT 1
1050

(CISCO)
350

3
SMART

TNT ACU
ROOM 600 600

600 300

397.5 ACU ACU 400

307.5 305

PROP 2.5HP
WACU
(stand-by)

460 580 950 580 860

LEGEND:
EXISTING

PROPOSED

DRAIN PIPE
PLDT LIPA 25mmØ PVC BLUE PIPE

1 PROPOSED DRAIN LINE LAYOUT PROPOSED FCU

PROP. 20AT FCU ECB


ME-12
PROP. 40AT ACCU ECB

PROP. ACU PANEL

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 3x5TR FCU,
PROJECT DESCRIPTION: 1xWACU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED DRAIN LINE LAYOUT
ME-12
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY:
CORPORATION

SITE ADDRESS: KALIPULAKO ST. EXTENSION, LIPA, BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-15
LONGITUDE: 120°9'35.74" LATITUDE: 13°56'15.69'' PLACE ISSUE: DATE APPROVED:
PLDT LIPA
1 PROPOSED ACCU AND PANELS LAYOUT ISOMETRIC VIEW LEGEND:
ME-13
EXISTING

PROPOSED

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 3x5TR FCU,
PROJECT DESCRIPTION: 1xWACU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED ACCU AND PANELS LAYOUT ISOMETRIC VIEW
ME-13
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY:
CORPORATION

SITE ADDRESS: KALIPULAKO ST. EXTENSION, LIPA, BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-15
LONGITUDE: 120°9'35.74" LATITUDE: 13°56'15.69'' PLACE ISSUE: DATE APPROVED:
CONCRETE CEILING

AR
EB
GL AL
AN ST
25mmØ DRAIN LINE TAP TO E DE
P
NEAREST DRAIN CONNECTION

mm
400

±1.75m.

±2.05m.
P-TRAP

5TR FCU 1, 2, & 3 MOUNTING DETAILS 2.5HP WACU MOUNTING DETAILS


FFL ±0.4m

STACU 1, 2, 3 & 4 MOUNTING DETAILS


ACCU 5TR
936mm x 336mm x 722mm

ACCU 5TR
936mm x 336mm x 722mm
1.0m.

ACCU 1 & 2 MOUNTING DETAILS ACCU 3 MOUNTING DETAILS

PLDT LIPA
1 FCU & ACCU MOUNTING DETAILS
ME-14

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 3x5TR FCU,
PROJECT DESCRIPTION: 1xWACU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
MOUNTING DETAILS
ME-14
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY:
CORPORATION

SITE ADDRESS: KALIPULAKO ST. EXTENSION, LIPA, BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-15
LONGITUDE: 120°9'35.74" LATITUDE: 13°56'15.69'' PLACE ISSUE: DATE APPROVED:
1 DRAIN PIPE DETAILS
ME - 15 NOT TO SCALE
2 PIPE SUPPORT DETAILS
ME - 15 NOT TO SCALE
3 PIPE HANGER DETAILS
ME - 15 NOT TO SCALE

4 PIPE INSTALLATION DETAILS


ME - 15 NOT TO SCALE
5 TYPICAL PIPE THRU WALL DETAIL
ME - 15 NOT TO SCALE

PLDT LIPA
MISCELLANEOUS DETAILS
ME-15

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 3x5TR FCU,
PROJECT DESCRIPTION: 1xWACU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
MISCELLANEOUS DETAILS
ME-15
SITE NAME: PLDT LIPA PRC No: PTR No: REVIEWED BY:
CORPORATION

SITE ADDRESS: KALIPULAKO ST. EXTENSION, LIPA, BATANGAS DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-15
LONGITUDE: 120°9'35.74" LATITUDE: 13°56'15.69'' PLACE ISSUE: DATE APPROVED: