You are on page 1of 14

A B C D E F G H

4450 3370 2848 3130 4450 2423 6312

GENERAL NOTES:

1
PROPOSED TO DEMOLISH EXISTING
STORAGE ROOM
PROPOSED TO PULLOUT
FUEL STORAGE TANK
FU
EL 9716
ST
TA ORA
NK GE

PACU

EE ROOM
PACU

LP 14

ELP 14
DCPDB 1 DCPDB 2
2
CR CR
EPP
ODF
ODF MDF (COPPER)
3435

BUSBAR

(WORKING)
5TR WACU
Exhaust Fan
PCM ROOM
SS 1 BANK
SS 1 BANK
DAY
2V 300 Ah SS 4 BANK TANK
12V 130 Ah 2V 300 Ah HUAWEI FIBERHOME
DASHUCU DCPDB OLT

3
PASFEOL ODF
001

BATTERY ROOM

ACCU
ALCATEL

(WORKING)
5TR WACU
SACREDSON RACK RACK
DCPDB 4 PANKS
12V100ah
No Battery
No Battery HUAWEI HUAWEI 125
K
GEN VA
U )
FC ING

OPTX ODF 5TR RK


(WO

SET 2191

DECTU
RECTI
NOT

ECB
ACCU
WORKING

PR-B
4
3200

PR 2A

MTS
MDT
MTS
PANTRY

ACCU
5TR
FCU
(WORKING) ATS

PR-2
DSHUAG
HT
001
WORKING
PRB

NOT

DSHUAG
HT
003
MDF

OLT
FIBERHOME FIBERHOME
WORKING
NOT

OLT

ACCU
MDF
8116
MAIN OFFICE

DASHUCU
HUAWEI
002
MDF

001
HUCS
HUAWEI

DCPDB
RECTI
ACBEL
PROPOSED FOR RENOVATION

MDF
MDF ROOM
400

SWITCHING
5TR
FCU
ROOM
(WORKING)

CCTV

COMPUTER
5
ROOM
G.H

4509

FACP
ENTRANCE
6

VICINITY MAP 6125

PLDT DASMARIÑAS
EXISTING SITE DEVELOPMENT PLAN
7
2 x 100 KVA

OPERATOR: CONTRACTOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: PROPOSED AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
EXISTING SITE DEVELOPMENT PLAN
ME-01
CORPORATION
SITE NAME: PLDT DASMARIÑAS PRC No: PTR No: REVIEWED BY:
27 EMILIO AGUINALDO HI-WAY, ZONE 4,
SITE ADDRESS: DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
DASMARIÑAS, CAVITE SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120° 56' 20.74" LATITUDE: 14° 19' 49.13" PLACE ISSUE: DATE APPROVED: .
A B C D E F
4450 3370 2850 3130 4450

1
1710

1100

OPEN TYPE GENSET


PROPOSED 300KW
590 1710 1400
4150

1100 500
300

OPEN TYPE GENSET


3300
PR

PROPOSED 300KW
OP
FU OSED 600
EL
TA 500L
3910 NK MA
N
PU UAL
3300
MP
FP
30
2P AT.
EC
B
9716
ELP GB
P
3910

1000 1000 1000 2000

495

1000
3550

3150

PR
2500
PROP. MDP PROP. ATS-1 PROP. ATS-2
OP
PROP. OS
1795
E
FU D 50
SWITCHBOARD
ST
895 O RA EL 00L
GE
2700 TA
NK 1500
PROP. 1900
MOBILE BOX

EE ROOM
PACU PACU

LP 14

ELP 14
DCPDB 1 DCPDB 2
2
PROPOSED PROPOSED PROPOSED CR CR
MTS-2 MTS-1 EMDP EPP
ODF
ODF MDF (COPPER)
400 3435

BUSBAR

(WORKING)
5TR WACU
800 800 800
Exhaust Fan
PCM ROOM
SS 1 BANK
SS 4 BANK SS 1 BANK
2V 300 Ah
12V 130 Ah 2V 300 Ah HUAWEI FIBERHOME
DASHUCU DCPDB OLT

3
PASFEOL ODF
001

BATTERY ROOM

LEGEND:
PLDT DASMARIÑAS EXISTING

PROPOSED FUEL PIPE LINE LAYOUT PROPOSED

FUEL PIPE LINE

PIPE TRENCH
OPERATOR: CONTRACTOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: PROPOSED AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED FUEL PIPE LINE LAYOUT
ME-02
CORPORATION
SITE NAME: PLDT DASMARIÑAS PRC No: PTR No: REVIEWED BY:
27 EMILIO AGUINALDO HI-WAY, ZONE 4,
SITE ADDRESS: DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
DASMARIÑAS, CAVITE SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120° 56' 20.74" LATITUDE: 14° 19' 49.13" PLACE ISSUE: DATE APPROVED: .
NOTES:
1. The diesel fuel transfer pump shall be positive rotary gear pump, fitted with mechanical seal and pressure relief valve.
2. The diesel fuel transfer pump should be rated at 36L/min at 15 meters TDH, coupled to 1hp electric motor, 1750 rpm, 230volts, 1phase, 60 hertz.
3. Diesel fuel transfer pump shall be US or Japan made, "Roper", "Viking", "Tuthill", Sherwood" or approved equal.
4. Proposed fuel supply lines existing fuel storage tank to skid mounted Genset Base tank shall be 1-1/2" B.I. Sched. 40.
5. The existing Genset Base tank shall be provided with float switch for controlling the motor driven auxiliary fuel transfer pump for low and high fuel level.Acceptable brands
are Fozmula, Kohgiken Mac-3 or approved equal
6. The existing Genset shall be provided with battery trickle charger, including power wires and conduit. Submit schematic diagram, brochure and shop drawing for approval
of PLDT.
7. Complete mounting of 300KW skid mounted generator set is included in the scope of work of the contractor.
8. Replacement of Genset batteries, air filters, fuel filters, oil filters and lubricating oil is included in the scope of work of the contractor.
9. Provision of New 2x300KW GENSET (OPEN TYPE)
10. All necessary accessories needed to operate the 2x300KW (OPEN TYPE) shall be provided by the contractor.
RAIN CAP

EXHAUST HEIGHT SHOULD BE


0.8-1m ABOVE THE PARAPET WALL

MUFFLER PIPE SUPPORT

MUFFLER/PIPE HANGER

EXHAUST PIPE INSULATION WITH SPRING HANGER


Ga. #26 ALUMINUM CLADDING SUPPORT (TYPICAL)

EXHAUST PIPE
EXHAUST MUFFLER OF GENSET

DENR TEST PORT


250mm DIA. B.I PIPE SCHED 40 WITH ROCKWOOL
INSULATION & ALUMINUM CLADDING (WITHIN GENSET EXHAUST THIMBLE
ROOM CANVASS
FLEXIBLE EXHAUST PIPE CONNECTOR (SEE DETAIL)
CONNECTOR WITH Ga.#14 EXISTING REMOVABLE METAL LOUVER
EXPANDED METAL GUARD FOR GENSET HOT AIR EXHAUST
(BY OTHERS)
CONDENSATE DRAIN
G.I. PIPE 15mm DIA.

ACESS DOOR
FOR RADIATOR
HOT AIR DUCT

HOT AIR DUCT


1.4W x 1.8H
PROPOSE 375KVA (300KW) GENSET Ga.16 G.I. SHEET

NEOPRENE RUBBER PAD (TYPICAL)

PLDT DASMARIÑAS
PROPOSED 300KW OPEN TYPE GENSET

OPERATOR: CONTRACTOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: PROPOSED AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED 300KW OPEN TYPE GENSET
ME-03
CORPORATION
SITE NAME: PLDT DASMARIÑAS PRC No: PTR No: REVIEWED BY:
27 EMILIO AGUINALDO HI-WAY, ZONE 4,
SITE ADDRESS: DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
DASMARIÑAS, CAVITE SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120° 56' 20.74" LATITUDE: 14° 19' 49.13" PLACE ISSUE: DATE APPROVED: .
NOTES:
1. THE DIESEL DUEL DIAGRAM TRANSFER PUMP MUST BE:
a. POSITIVE ROTARY GEAR PUMP, FITTED WITH MECHANICAL SEAL AND PRESSURE RELIEF VALVE.
b. RATED AT 15GPM AT 15m TDH, COUPLED TO 1HP ELECTRIC MOTOR, 1750 RPM, 230V,1PH,60HZ.
c. U.S OR JAPAN MADE, "ROPER", "VIKING", "SHERWOOD" OR EQUAL APPROVED.
2. FUEL LINES TO DAYTANK SHALL BE B.I SCHED . 40 AND SHALL BE PROVIDED WITH THE FOLLOWING: BRONZE Y-STRAINER,CHECK VALVES, BALL VALVES,
PIPE SUPPORTS AND CLAMPS. BRAND OF VALVES MUST BE "KITZ", "TOZEN" , OR EQUAL APPROVED.
3. THE EXISTING FUEL DAYTANK SHALL BE PROVIDED WITH FLOAT SWITCH FOR CONTROLLING THE MOTOR DRIVEN AUXILIARY FUEL PUMP FOR LOW AND
HIGH FUEL LEVEL ALARMS. ACCEPTABLE BRANDS ARE FOZMULA, KOHGIKENOR APPROVED EQUAL.
4. THE CONTRACTOR SHALL SUBMIT LAYOUT OF FUEL PIPE TRENCH FROM FUEL STORAGE TO GENSET FUEL TANK.
5. ACCEPTABLE BRAND OF PUMP CONTROL PANEL ARE SCHNEIDER OR APPROVED EQUAL.
6. ACCEPTABLE BRAND OF MANUL PUMP ARE TOKHEIM,TUTHILL,FILTRITE OR APPROVED EQUAL.
7. SUBMIT BROCHURE OF 300KW GENSET FOR APPROVAL PRIOR TO PURCHASE/DELIVERY.
8. THE GENSET MUST BE LOAD TESTED FOR 4HRS FULL LOAD PRIOR TO DELIVERY TO SITE.

PROPOSED PUMP
CONTROL PANEL
PROPOSED 25mmØ
B.I. SCHED 40 PIPE IN
300KW, 3P, 230V
FUEL PIPE TRENCH
/ EMBEDDED PROPOSED
FLOAT SWITCH
PROPOSED 375KVA GENSET 1
BALL Y CHECK BALL
PROPOSED BALL
VALVE
CHECK VALVE Y
STRAINER
BALL
VALVE
BALL
VALVE
CHECK
VALVE
VALVE STRAINER VALVE VALVE
PROPOSED 500
FUEL STORAGE M LITERS DAYTANK

TANK PROPOSED
MOTORIZED PUMP
BALL
VALVE

5000 L
BALL BALL
VALVE VALVE 300KW, 3P, 230V

PROPOSED PROPOSED 375KVA GENSET 2


MANUAL PUMP Y CHECK BALL
STRAINER VALVE VALVE

PLDT DASMARIÑAS
PROPOSED FUEL LINE SCHEMATIC DIAGRAM

OPERATOR: CONTRACTOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: PROPOSED AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED FUEL LINE SCHEMATIC DIAGRAM
ME-04
CORPORATION
SITE NAME: PLDT DASMARIÑAS PRC No: PTR No: REVIEWED BY:
27 EMILIO AGUINALDO HI-WAY, ZONE 4,
SITE ADDRESS: DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
DASMARIÑAS, CAVITE SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120° 56' 20.74" LATITUDE: 14° 19' 49.13" PLACE ISSUE: DATE APPROVED: .
PROPOSED 2120 CMH EQUIPMENT SCHEDULE
WALL MOUNT
EXHAUST FAN (PROPOSED GENSET ROOM)
PROPOSED WALL MOUNT EXHAUST FAN
1710

1100

OPEN TYPE GENSET


PROPOSED 300KW
590 1710 1400
4150

1100 500
300

OPEN TYPE GENSET


3300
PR

PROPOSED 300KW
OP
FU OSED 600
EL
TA 500L
3910 NK MA
NU
PUA
3300 MP L 30
FP 2P AT.
EC
B

ELP GB
P
3910
AIR CHANGES CALCULATION (CMH)
1000 1000 1000 2000
NO. OF TOTAL CMH AIR
W(M) H(M) VOLUME(M) EXHAUST FAN (EXHAUST FAN)
495
L(M) CHANGES/HR
1000

2500
10.2 4.5 4 193.8 2 2120 21.87
PROP. MDP PROP. ATS-1 PROP. ATS-2 PROP.
1795
SWITCHBOARD
895 CALC.
PLDT STANDARD: 15 AIR
AIR CHANGES = VCMH / VOLUME (M)
CHANGES/HR
2700 AIR CHANGES = 2x2120/193.8
REMARKS: (SUFFICIENT AIR CHANGES)
PROP.
AIR CHANGES = 21.87
MOBILE BOX

PROP. GENSET ROOM


EQUIPMENT SCHEDULE
(PROPOSED BATTERY ROOM)
PROPOSED AUTO SHUTTER EXHAUST FAN

PROPOSED PROPOSED PROPOSED PROPOSED


1000AH 1000AH 1000AH 1000AH
BATTERY BATTERY BATTERY BATTERY

AIR CHANGES CALCULATION (CMH)


NO. OF TOTAL CMH AIR
L(M) W(M) H(M) VOLUME(M) EXHAUST FAN (EXHAUST FAN) CHANGES/HR

3.59 2.69 3.5 33.3 2 294 17.66

FUTURE PROPOSED PROPOSED PROPOSED


PROPOSED 294 CMH BATTERY 1000AH 1000AH 1000AH CALC.
BANK BATTERY BATTERY BATTERY PLDT STANDARD: 15 AIR
AUTO SHUTTER AIR CHANGES = VCMH / VOLUME (M)
CHANGES/HR
AIR CHANGES = 2x294/33.3
EXHAUST FAN REMARKS: (SUFFICIENT AIR CHANGES)
AIR CHANGES = 17.66

NOTE:
THE FORMULA USED FOR CALCULATION ABOVE IS GIVEN BELOW

VOLUME (M) = L x W x H
PROPOSED BATTERY AIR CHANGES/HR = VCMH / VOLUME (M)

ROOM NOTE:
PROP. EF OUTLET TO BE INSTALLED BESIDE THE PROP. EXHAUST FAN
OR INSTALLATION BASED ON PLDT STANDARD
PLDT DASMARIÑAS
PROPOSED EXHAUST FAN LAYOUT AND COMPUTATIONS

OPERATOR: CONTRACTOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: PROPOSED AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED EXHAUST FAN LAYOUT AND COMPUTATIONS
ME-05
CORPORATION
SITE NAME: PLDT DASMARIÑAS PRC No: PTR No: REVIEWED BY:
27 EMILIO AGUINALDO HI-WAY, ZONE 4,
SITE ADDRESS: DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
DASMARIÑAS, CAVITE SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120° 56' 20.74" LATITUDE: 14° 19' 49.13" PLACE ISSUE: DATE APPROVED: .
NOTE:
1. ALL ANGLE BARS (50mm X 50mm X6mm) CONNECTION MUST BE FULLY
WELDED ON ALL JOINTS.
2. DAYTANK MUST BE REPAINTED WITH PRIMER PAINT AND FINISHED WITH
ENAMEL PAINT. 1000mm
3. SEE CE FOR DAYTANK BUNDWALL DETAILS.
500mm FLOAT SWITCH

VENT LINE 400X300 HAND HOLE


25mm DIA. B.I. SCHED. 40 WITH GASKET INSERT 25mm DIA. B.I. SCHED. 40
FUEL RETURN LINE FROM ON STEEL COVER FUEL DELIVERY LINE
GENSET

15mm SIGHT GLASS


WITH GUARD SCREEN
(ALL AROUND)
1200mm
GA # 14 B.I. SHEET

GUARD SCREEN
BRACKET SUPPORT

50mm X 50mm X 6mm


ANGLE BARS FULLY
WELD ON ALL JOINTS
EXISTING 38mm DIA GATE
GROUND WIRE VALVE FOR DRAIN
TO BE TAPPED
1000mm
32mm DIA. B.I. SCHED. 40
FUEL SUPPLY LINE
PROPOSED CONTAINMENT
(SEE CE FOR DETAILS)

FINISHED FLOOR LINE


150x150x5mm BASE
PLATE WITH 4PCS. 6mm DIA.
SELF DRILLING ACHOR BOLT
PROPOSED CONTAIMENT
(SEE CE FOR DETAILS)

PLDT DASMARIÑAS
PROPOSED 500L DAY TANK SHOP DRAWING

OPERATOR: CONTRACTOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: PROPOSED AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED 500L DAY TANK SHOP DRAWING
ME-06
CORPORATION
SITE NAME: PLDT DASMARIÑAS PRC No: PTR No: REVIEWED BY:
27 EMILIO AGUINALDO HI-WAY, ZONE 4,
SITE ADDRESS: DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
DASMARIÑAS, CAVITE SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120° 56' 20.74" LATITUDE: 14° 19' 49.13" PLACE ISSUE: DATE APPROVED: .
500mm INSIDE DIAMETER
3mm THICK FABRICATED
MANHOLE WITH COVER AND
3mm THICK RUBBER GASKET

5000L FUEL TANK

3.0mm THICK M.S. PLATE FOR


TANK SHELL AND HEADS

2 12
+$/) &283/,1*
FUEL OIL SUPPLY INLET 10mm THICK EYE LEFTING
AND DOUBLER PLATE

9mmØ PLAIN ROUND BAR


MANHOLE COVER HANDLE

2"Ø PIPE AIR VENT


WITH INSECT SCREEN

1" Ø HALF COUPLING WITH


CAP SCREWED CONNECTION
FOR SUPPLY LINE (NIPPLE)

4.5mm THICK PLATE FUEL


TANK SHELL AND HEADS
1/2" Ø LEVEL GAUGE GLASS WITH
CALIBRATION (LITERS) COMPLETE VALVE
AND GUARD

25mmØ PLAIN ROUND BAR


LADDER RUNGE SPACED AT
EVERY 300MM O.C.

2 "Ø LEVEL GAUGE GLASS


4.5mm THICK DOUBLER PLATE
WITH CALIBRATION (LITERS).
COMPLETE VALVE AND GUARD

∅ B.I PIPE TANK LEGS


1"Ø HALF COUPLING WITH
CAP SCREWED CONNECTION
FOR SUPPLY LINE (NIPPLE)

250 x 1000 x 6mm THICK


BASE PLATE W/ 4-16mmØ
EXPANSION BOLTS

PLDT DASMARIÑAS
PROPOSED FUEL STORAGE TANK DETAILS AND COMPUTATIONS

OPERATOR: CONTRACTOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: PROPOSED AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED FUEL STORAGE TANK
ME-07
CORPORATION
SITE NAME: PLDT DASMARIÑAS PRC No: PTR No: REVIEWED BY:
DETAILS AND COMPUTATIONS
27 EMILIO AGUINALDO HI-WAY, ZONE 4,
SITE ADDRESS: DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
DASMARIÑAS, CAVITE SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120° 56' 20.74" LATITUDE: 14° 19' 49.13" PLACE ISSUE: DATE APPROVED: .
EXHAUST PIPE

CONRETE WALL
4-12mm dia. LONGITUDINAL SEAM
BOLT, NUT AND PIPE INSULATION CROSS-SECTIONAL SEAM
WASHER
PERLITE BLOCK
INSULATION

4" x 2mm THICK 4" x 2mm THICK PIPE SLEEVE


STEEL FURLINS STEEL FURLINS

C-CHANNEL
FICEMBOARD FICEMBOARD
EXHAUST PIPE

12mm DIA. THREADED Ga. No.26 ALUMINUM


STEEL ROD HANGER SHEET METAL CLADDING 12mmO 45 deg. G.I.
SPRING HANGER SUPPORT ELBOW CONDENSATE

400mm x 400mm x 4mm


Ga. No.26 ALUMINUM
INSULATION mild steel masking plate
METAL CLADDING
EXHAUST PIPE
CLADDING both sides
INSULATION BLIND RIVET

LONGITUDINAL AND
CROSS-SECTIONAL SEAM
(TYPICAL)

EXHAUST PIPE HANGER DETAIL EXHAUST THIMBLE PIPE EXHAUST CLADDING DETAIL

COUNTER 1" SQUARE BAR RAILINGS SPACED @ 25mm


FULL WELDED
WEIGHT HINGE
1" SQUARE BAR
CAP
2- 1" x 1" x 1/4 " ANGLE BAR FULL WELD 0.50m
WITH 10mm STEEL DOWELS @ 0.30m 0.10m

EGL
3000PSI CONCRETE
EXPANSION REINFORCED WITH
CLAMP 10MM DIA. BARS
BOLT PROPOSED 32mm 0.40m
FUEL SUPPLY LINES
2"PVC DRAIN PIPE
TO BE CLAMPLED
TO TRENCH WALL
@ EVERY 0.40m
CLAMPING 0.10
BAND
NOTE:
1. DRAIN TO BE TAPPED TO THE NEAREST EXISTING DRAINAGE SYSTEM
2. VERIFY JOBSITE AND SUBMIT SHOP DRAWINGS FOR APPROVAL.

PIPE SUPPORT DETAILS EXHAUST THIMBLE DETAIL PIPE TRENCH DETAILS

PLDT DASMARIÑAS
MISCELLANEOUS DETAILS

OPERATOR: CONTRACTOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: PROPOSED AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
MISCELLANEOUS DETAILS
ME-08
CORPORATION
SITE NAME: PLDT DASMARIÑAS PRC No: PTR No: REVIEWED BY:
27 EMILIO AGUINALDO HI-WAY, ZONE 4,
SITE ADDRESS: DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
DASMARIÑAS, CAVITE SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120° 56' 20.74" LATITUDE: 14° 19' 49.13" PLACE ISSUE: DATE APPROVED: .
GENERAL NOTES:
A B C D E F G H
1. ALL MECHANICAL WORKS HEREUNDER SHALL CONFIRM WITH THE LATEST
EDITION OF THE PHILIPPINE MECHANICAL CODE, PLDT ME GENERAL CONDITION 4450 3370 2848 3130 4450 2423 6312
AND ME SPECIFICATION, RULES AND REGULATION OF NATIONAL, LOCAL
CONCERNED AUTHORITIES, LOCAL MUNICIPALITY/CITY.
2. THE CONTRACTOR SHALL CONDUCT ACTUAL SITE INSPECTION, SURVEY, 1
VERIFICATION AND CHECKING BEFORE THE SUBMISSION OF BID IN ORDER TO
FAMILIARIZE WITH THE ACTUAL CONDITION VERSUS ME PLANS, ANY CONFLICT
PROPOSED TO DEMOLISH EXISTING
BETWEEN PLANS AND ACTUAL CONDITION, ACTUAL CONDITION WILL PREVAIL STORAGE ROOM
AND WINNING CONTRACTOR WILL SUBMIT TO THE PLDT THE SHOP DRAWING PROPOSED TO PULLOUT
FOR EVALUATION AND APPROVAL. ANY REVISION/CONFLICT HAVE NO COST FUEL STORAGE TANK
ADDITION OR NO CONSTRUCTION BULLETIN TO ISSUE. FU
EL 9716
ST
3. SUPPLY AND INSTALLATION OF (3) 90,000 BTU/HR (7.5TR) FLOOR MOUNTED TA ORA
NK GE
SPLIT TYPE AIR-CONDITIONING UNIT. INCLUDING SUPPORTS, REFRIGERANT
PIPES, DRAIN PIPES AND ALL ITEMS REQUIRED FOR THE COMPLETION OF THE
PROJECT.
4. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS,EQUIPMENT,ACCESSORIES,
SECURE NECESSARY PERMITS FOR INSTALLATION & PERFORM ALL THE WORK
NECESSARY FOR COMMISSIONING AND TESTING.
5. RESTORATION OF AFFECTED DAMAGE AREAS AND OTHER MISCELLANEOUS
ITEMS NECESSARY FOR THE COMPLETION OF THE PROJECT.
PACU

EE ROOM
PACU

LP 14

ELP 14
DCPDB 1 DCPDB 2
2
CR CR
EPP

6. LEGWORK OF PERMITTING AND APPLICATION, TO BE HANDLED BY THE


ODF
ODF MDF (COPPER)
3435

BUSBAR

(WORKING)
5TR WACU
CONTRACTOR. SS 1 BANK
2V 300 Ah
Exhaust Fan

SS 4 BANK SS 1 BANK
PCM ROOM
DAY
TANK
12V 130 Ah 2V 300 Ah HUAWEI FIBERHOME

7. PAYMENT & LEG WORKS FOR THE APPLICATIONS OF ALL PERMITS SHALL BE DASHUCU DCPDB OLT

3
PASFEOL ODF
001

BATTERY ROOM

ACCU
HANDLED BY THE CONTRACTOR. ALCATEL

(WORKING)
5TR WACU
SACREDSON RACK RACK
DCPDB 4 PANKS
12V100ah
No Battery No Battery HUAWEI HUAWEI 125
K
GEN VA
)
FCUING

OPTX ODF 5TR RK


(WO

SET 2191

DECTU
RECTI
NOT

ECB
ACCU
WORKING

PR-B
4
3200

PR 2A

MTS
MDT
MTS
5TR
PANTRY

ACCU
FCU
(WORKING) ATS

PR-2
001
DSHUAG
HT
WORKING
PRB

NOT

003
DSHUAG FIBERHOME FIBERHOME
HT
MDF

OLT
WORKING
NOT

OLT

ACCU
MDF
8116
MAIN OFFICE

002
DASHUCU
HUAWEI
MDF

HUCS
HUAWEI
001

DCPDB
RECTI
ACBEL
PROPOSED FOR RENOVATION

MDF
MDF ROOM
400

SWITCHING
5TR
FCU
ROOM
(WORKING)

CCTV

COMPUTER
5
ROOM
G.H

4509

FACP
ENTRANCE
6

VICINITY MAP 6125

PLDT DASMARIÑAS
EXISTING SITE DEVELOPMENT PLAN
7
2 x 100 KVA

OPERATOR: CONTRACTOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: PROPOSED AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
EXISTING SITE DEVELOPMENT PLAN
ME-09
CORPORATION
SITE NAME: PLDT DASMARIÑAS PRC No: PTR No: REVIEWED BY:
27 EMILIO AGUINALDO HI-WAY, ZONE 4,
SITE ADDRESS: DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
DASMARIÑAS, CAVITE SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120° 56' 20.74" LATITUDE: 14° 19' 49.13" PLACE ISSUE: DATE APPROVED: .
A B C D E F G H
4450 3370 2848 3130 4450 2423 6312

1
1710

1100

OPEN TYPE GENSET


PROPOSED 300KW
590 1710 1400
4150

1100 500
300

OPEN TYPE GENSET


3300
PR

PROPOSED 300KW
OP
FU OSED 600
EL
TA 500L
3910 NK MA
N
PU UAL
3300 MP
FP 2P
30AT
EC
B
. 9716
EL GB
PP
3910

1000 1000 1000 2000

495

1000
3550

3150

PR
2500
PROP. MDP PROP. ATS-1 PROP. ATS-2
OP
PROP. OS
1795
SWITCHBOARD ED
ST F
895 OR UEL 5000L
AG
ET
2700
AN
PROP.
K 1500
1900
MOBILE BOX

EE ROOM
PACU PACU

LP 14

ELP 14
DCPDB 1 DCPDB 2
2
PROPOSED PROPOSED PROPOSED CR CR
MTS-2 MTS-1 EMDP EPP
ODF
ODF MDF (COPPER)
400 3435

BUSBAR

(WORKING)
5TR WACU
800 800 800
Exhaust Fan
PCM ROOM
SS 1 BANK
SS 1 BANK
DAY
2V 300 Ah SS 4 BANK TANK
12V 130 Ah 2V 300 Ah HUAWEI FIBERHOME
DASHUCU DCPDB OLT

3
PASFEOL ODF
001

BATTERY ROOM

ACCU
960

NEMA 1 ECB
PROP.

20AT, 230V, 3P
368 STACU 1

(WORKING)
5TR WACU
PROPOSED
7.5TR SACREDSON
TNT ACU PANEL RACK
4 PANKS RACK
NEMA 4X PROPOSED
12V100ah
No Battery No Battery HUAWEI HUAWEI 125
TNT PR PANEL
K
GEN VA
FCU NG)

NEMA 1 OPTX ODF 5TR RKI


(WO

50AT, 230V, 3P
NEMA 4X ECB
960 SET 2191

NEMA 1 ECB
20AT, 230V, 3P
PROP.

PROP. 7.5TR
STACU 2

ECB
368

ACCU
7.5TR

PR-B
ACCU 2
4
3200
1200

RELOCATED

MTS
MDT

PROPOSED
MTS

DCPDB
MDF
PANTRY

ACCU
600

PROP. ELVSG - TIE


50AT, 230V, 3P
NEMA 4X ECB
ATS

PROP. 7.5TR
PROP.
CISCO LOT 2

ACCU 2
600
ASR 9910

PROP.
CISCO LOT 2 600

001
DSHUAG
HT
3000
ASR 9910
50AT, 230V, 3P
NEMA 4X ECB PROP.
CISCO LOT 1 600

DSHUAG FIBERHOME FIBERHOME


HT
003
PROP. 7.5TR
600 NCS 2006

ACCU 3
PROP.

RECTIFIER SYSTEM

OLT
600 600

PROPOSED 2000A
CISCO LOT 1
NCS 2006

PROPOSED

OLT
600 1200

ODF
900

ACCU
150
600

MDF
FUTURE
EQUIPMENT
400

8116
600 400

MAIN OFFICE

002
DASHUCU HUCS
HUAWEI
FUTURE
EQUIPMENT 400

FUTURE
EQUIPMENT

HUAWEI
001

DCPDB
FUTURE
EQUIPMENT PROP. MAIN
FUTURE CIRCUIT BREAKER
EQUIPMENT
1000AT NEMA4X

RECTI
ACBEL
FUTURE
EQUIPMENT

FUTURE
EQUIPMENT

FUTURE
EQUIPMENT

FUTURE
EQUIPMENT

20AT, 230V, 3P
NEMA 1 ECB
PROP.
STACU 3 368

5
7.5TR
960

PROPOSED PROPOSED PROPOSED PROPOSED


1000AH 1000AH 1000AH 1000AH
BATTERY BATTERY BATTERY BATTERY

G.H
FUTURE PROPOSED PROPOSED PROPOSED
BATTERY 1000AH 1000AH 1000AH
BANK BATTERY BATTERY BATTERY

4509
FACP

ENTRANCE
6
6125
PROPOSED ADDITIONAL
100KVA TRANSFORMER

2 x 100 KVA
7
PLDT DASMARIÑAS
PROPOSED SITE DEVELOPMENT PLAN LEGEND:
EXISTING

PROPOSED
OPERATOR: CONTRACTOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: PROPOSED AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED SITE DEVELOPMENT PLAN
ME-10
CORPORATION
SITE NAME: PLDT DASMARIÑAS PRC No: PTR No: REVIEWED BY:
27 EMILIO AGUINALDO HI-WAY, ZONE 4,
SITE ADDRESS: DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
DASMARIÑAS, CAVITE SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120° 56' 20.74" LATITUDE: 14° 19' 49.13" PLACE ISSUE: DATE APPROVED: .
B C D B C D
3370 2848 3370 2848

EE ROOM
PACU PACU

LP 14

ELP 14
2 EE ROOM
PACU PACU

LP 14

ELP 14
2
PROPOSED PROPOSED PROPOSED CR PROPOSED PROPOSED PROPOSED CR
MTS-2 MTS-1 EMDP EPP MTS-2 MTS-1 EMDP EPP

400 3435 25mmØ PVC BLUE PIPE


400 3435
800 800 800
Exhaust Fan
DRAIN PIPE; TAP TO 800 800 800
Exhaust Fan

SS 1 BANK
THE NEAREST SS 1 BANK
SS 1 BANK SS 1 BANK
2V 300 Ah SS 4 BANK
12V 130 Ah 2V 300 Ah EXISTING DRAIN LINE/ 2V 300 Ah SS 4 BANK
12V 130 Ah 2V 300 Ah

3 3
CATCH BASIN
HARD DRAWN
BATTERY ROOM BATTERY ROOM
COPPER TUBE 960 960

NEMA 1 ECB

NEMA 1 ECB
PROP. PROP.

20AT, 230V, 3P

20AT, 230V, 3P
5
8"Ø LIQUID LINE
368 STACU 1 368 STACU 1
PROPOSED PROPOSED
7.5TR SACREDSON 7.5TR SACREDSON
TNT ACU PANEL RACK RACK TNT ACU PANEL RACK RACK
4 PANKS No Battery 4 PANKS No Battery
7 NEMA 4X PROPOSED No Battery NEMA 4X PROPOSED No Battery
8"Ø GAS LINE TNT PR PANEL 12V100ah TNT PR PANEL 12V100ah
NEMA 1 NEMA 1

50AT, 230V, 3P
NEMA 4X ECB
960
2191 50AT, 230V, 3P
NEMA 4X ECB
960
2191

NEMA 1 ECB

NEMA 1 ECB
PROP. PROP.

20AT, 230V, 3P

20AT, 230V, 3P
PROP. 7.5TR

PROP. 7.5TR
368 STACU 2 368 STACU 2
7.5TR 7.5TR
ACCU 1

ACCU 2
4 4
1200 1200
RELOCATED

RELOCATED
PROPOSED

PROPOSED
DCPDB

DCPDB
MDF

MDF
600 600
50AT, 230V, 3P 50AT, 230V, 3P
NEMA 4X ECB NEMA 4X ECB
PROP. 7.5TR

PROP. 7.5TR
PROP. PROP.
CISCO LOT 2 600 CISCO LOT 2 600
ACCU 2

ACCU 2
ASR 9910 ASR 9910

PROP. PROP.
CISCO LOT 2 600 CISCO LOT 2 600

DSHUAG
HT

DSHUAG
HT
001

001
ASR 9910 ASR 9910
50AT, 230V, 3P 50AT, 230V, 3P
NEMA 4X ECB PROP. NEMA 4X ECB PROP.
CISCO LOT 1 600 CISCO LOT 1 600

DSHUAG FIBERHOME FIBERHOME


HT

DSHUAG FIBERHOME FIBERHOME


HT
003

003
PROP. 7.5TR

PROP. 7.5TR
600 NCS 2006 600 NCS 2006
ACCU 3

ACCU 3
PROP. PROP.
RECTIFIER SYSTEM

RECTIFIER SYSTEM
OLT

OLT
600 CISCO LOT 1 600 600 CISCO LOT 1 600
PROPOSED 2000A

PROPOSED 2000A
NCS 2006 NCS 2006
PROPOSED

PROPOSED
OLT

OLT
600 600
ODF

ODF
900 900

150 150
600 600
MDF

MDF
FUTURE
EQUIPMENT
400
8116 FUTURE
EQUIPMENT
400
8116
600 400 600 400
DASHUCU HUCS
HUAWEI

DASHUCU HUCS
HUAWEI
002

002
FUTURE FUTURE
EQUIPMENT 400 EQUIPMENT 400
FUTURE FUTURE
HARD DRAWN EQUIPMENT EQUIPMENT
HUAWEI

HUAWEI
001

001
DCPDB

DCPDB
FUTURE FUTURE
COPPER TUBE EQUIPMENT EQUIPMENT

FUTURE FUTURE
5
8"Ø LIQUID LINE
EQUIPMENT EQUIPMENT
RECTI

RECTI
ACBEL

ACBEL
FUTURE FUTURE
7
8"Ø GAS LINE
EQUIPMENT EQUIPMENT

FUTURE FUTURE
EQUIPMENT EQUIPMENT

FUTURE FUTURE
EQUIPMENT EQUIPMENT

FUTURE FUTURE
EQUIPMENT EQUIPMENT
20AT, 230V, 3P

20AT, 230V, 3P
NEMA 1 ECB

NEMA 1 ECB
PROP. PROP.
STACU 3 368 STACU 3 368

5 5
7.5TR 7.5TR

LEGEND:
960 960

PROPOSED PROPOSED PROPOSED PROPOSED PROPOSED PROPOSED PROPOSED PROPOSED

EXISTING
1000AH 1000AH 1000AH 1000AH 1000AH 1000AH 1000AH 1000AH
BATTERY BATTERY BATTERY BATTERY BATTERY BATTERY BATTERY BATTERY

25mmØ PVC BLUE PIPE


DRAIN PIPE; TAP TO
THE NEAREST PROPOSED
G.H G.H EXISTING DRAIN LINE/
FUTURE
BATTERY
PROPOSED PROPOSED PROPOSED
1000AH 1000AH 1000AH
FUTURE
BATTERY
PROPOSED PROPOSED PROPOSED
1000AH 1000AH 1000AH CATCH BASIN
BANK BATTERY BATTERY BATTERY BANK BATTERY BATTERY BATTERY
REFRIGERANT PIPE(7.5TR)
FACP

4509

FACP
4509
5
8"Ø LIQUID LINE
7
8"Ø GAS LINE

DRAIN PIPE

6 6 25mmØ PVC BLUE PIPE

PROPOSED FCU

PLDT DASMARIÑAS PLDT DASMARIÑAS PROPOSED ACCU


PROPOSED REFRIGERANT PIPE LAYOUT PROPOSED DRAIN PIPE LAYOUT PROP. 20AT FCU ECB

PROP. 50AT ACCU ECB


OPERATOR: CONTRACTOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: PROPOSED AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED REFRIGERANT AND DRAIN PIPE LAYOUT
ME-11
CORPORATION
SITE NAME: PLDT DASMARIÑAS PRC No: PTR No: REVIEWED BY:
27 EMILIO AGUINALDO HI-WAY, ZONE 4,
SITE ADDRESS: DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
DASMARIÑAS, CAVITE SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120° 56' 20.74" LATITUDE: 14° 19' 49.13" PLACE ISSUE: DATE APPROVED: .
PLDT DASMARIÑAS
PROPOSED ACCU LAYOUT ISOMETRIC VIEW

OPERATOR: CONTRACTOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: PROPOSED AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED ACCU LAYOUT ISOMETRIC VIEW
ME-12
CORPORATION
SITE NAME: PLDT DASMARIÑAS PRC No: PTR No: REVIEWED BY:
27 EMILIO AGUINALDO HI-WAY, ZONE 4,
SITE ADDRESS: DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
DASMARIÑAS, CAVITE SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120° 56' 20.74" LATITUDE: 14° 19' 49.13" PLACE ISSUE: DATE APPROVED: .
CONCRETE CEILING

ACCU 7.5TR
25mmØ DRAIN LINE TAP TO
1130mm x 465mm x 1450mm NEAREST DRAIN CONNECTION

P-TRAP

±1.75m.
FCU 1, 2 & 3 MOUNTING DETAILS
±2.05m.

FFL ±0.4

STACU MOUNTING DETAILS


7.5TR ACCU 1, 2 & 3 MOUNTING DETAILS

0.4m
FCU 1, 2 & 3 SUPPORT DETAILS

PLDT DASMARIÑAS
FCU & ACCU MOUNTING DETAILS

OPERATOR: CONTRACTOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: PROPOSED AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
FCU & ACCU MOUNTING DETAILS
ME-13
CORPORATION
SITE NAME: PLDT DASMARIÑAS PRC No: PTR No: REVIEWED BY:
27 EMILIO AGUINALDO HI-WAY, ZONE 4,
SITE ADDRESS: DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
DASMARIÑAS, CAVITE SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120° 56' 20.74" LATITUDE: 14° 19' 49.13" PLACE ISSUE: DATE APPROVED: .
DRAIN PIPE DETAILS PIPE SUPPORT DETAILS PIPE HANGER DETAILS
NOT TO SCALE NOT TO SCALE NOT TO SCALE

PIPE INSTALLATION DETAILS TYPICAL PIPE THRU WALL DETAIL


NOT TO SCALE NOT TO SCALE

PLDT DASMARIÑAS
MISCELLANEOUS DETAILS

OPERATOR: CONTRACTOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: PROPOSED AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
MISCELLANEOUS DETAILS
ME-14
CORPORATION
SITE NAME: PLDT DASMARIÑAS PRC No: PTR No: REVIEWED BY:
27 EMILIO AGUINALDO HI-WAY, ZONE 4,
SITE ADDRESS: DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
DASMARIÑAS, CAVITE SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120° 56' 20.74" LATITUDE: 14° 19' 49.13" PLACE ISSUE: DATE APPROVED: .

You might also like