GENERAL NOTES:

1. ALL MECHANICAL WORKS HEREUNDER SHALL CONFIRM WITH THE LATEST EDITION OF
THE PHILIPPINE MECHANICAL CODE, PLDT ME GENERAL CONDITION AND ME
SPECIFICATION, RULES AND REGULATION OF NATIONAL, LOCAL CONCERNED
AUTHORITIES, LOCAL MUNICIPALITY/CITY.
2. THE CONTRACTOR SHALL CONDUCT ACTUAL SITE INSPECTION, SURVEY, VERIFICATION
AND CHECKING BEFORE THE SUBMISSION OF BID IN ORDER TO FAMILIARIZE WITH THE
ACTUAL CONDITION VERSUS ME PLANS, ANY CONFLICT BETWEEN PLANS AND ACTUAL
CONDITION, ACTUAL CONDITION WILL PREVAIL AND WINNING CONTRACTOR WILL
SUBMIT TO THE PLDT THE SHOP DRAWING FOR EVALUATION AND APPROVAL. ANY
REVISION/CONFLICT HAVE NO COST ADDITION OR NO CONSTRUCTION BULLETIN TO
ISSUE.
3. SUPPLY AND INSTALLATION OF (2) 60,000 BTU/HR(5TR) AND (1) 90,000 BTU/HR(7.5TR)
FLOOR MOUNTED SPLIT TYPE AIR-CONDITIONING UNIT. INCLUDING SUPPORTS,
REFRIGERANT PIPES, DRAIN PIPES AND ALL ITEMS REQUIRED FOR THE COMPLETION
OF THE PROJECT.
4. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS,EQUIPMENT,ACCESSORIES,
SECURE NECESSARY PERMITS FOR INSTALLATION & PERFORM ALL THE WORK
NECESSARY FOR COMMISSIONING AND TESTING.
5. RESTORATION OF AFFECTED DAMAGE AREAS AND OTHER MISCELLANEOUS ITEMS
NECESSARY FOR THE COMPLETION OF THE PROJECT.
6. LEGWORK OF PERMITTING AND APPLICATION, TO BE HANDLED BY THE CONTRACTOR.
7. PAYMENT & LEG WORKS FOR THE APPLICATIONS OF ALL PERMITS SHALL BE HANDLED
BY THE CONTRACTOR.

VICINITY MAP
A B C D E F G H I J
11430 8780 4065 7090 1875 5625 6195 13450 2850

1 ECB
PANEL
MTS 3P
SMART
MCB
SMART
MTS
SMART

2700

ECB 250-AT
100kVA
1170 1833 FUEL
MTS 1700

PUMP
MDP 785

100kVA
MCB 585
4055
GENSET
9695 EMDP 785

ACU P-RECT 250AT

585 RP 2K19
ACU
600
100kVA 1400

FUEL 800 RECTI 600


TANK 950
MTS BATTERY
BANK
780
600
GP

TRANSFORMER
MOBILE BOX
(PLDT SMART)
SMART 1550 635
ACBEL
RECTI
600
RECTI
GP
600

BUSINESS
ACBEL

OFFICE
BATTERY 600
780 RECTI
BANK
ACBEL
600
RECTI

2
600

ALC REC B
GP REC B
BATTERY
BANK 1
880
BATTERY

PPR
BANK 2 RECTIFIER

3360

TANK
DAY
4150
GENSET

3
DECOMMISION OF
EXTG. RECTIFIER

5625
7560

TELEPHONE
PLAZA
8325

GUARD
HOUSE
FACP
4
7050

5
PLDT CAUAYAN
1 EXISTING SITE DEVELOPMENT PLAN
ME-01 LEGEND:
EXISTING

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY & INSTALLATION OF 2x5TR & 1x7.5TR
PROJECT DESCRIPTION:
ACU
PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
EXISTING SITE DEVELOPMENT PLAN
ME-01
CORPORATION
SITE NAME: PLDT CAUAYAN PRC No: PTR No: REVIEWED BY:

SITE ADDRESS:
135 PAN-PHILIPPINE HWY, CAUAYAN CITY DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
3305 ISABELA SCALE: REVISION NUMBER.: ME-08
LONGITUDE: 121°46'1.51" LATITUDE: 16°58'8.37'' PLACE ISSUE: DATE APPROVED:
C D E F G H I
4065 7090 1875 5625 6195 13450

1 ECB
PANEL
MTS 3P
SMART
MCB
SMART
MTS
SMART PROP. ACU
MAIN PANEL
MTS TYPE
NEMA 1 2700

ECB 250-AT
100kVA
1170 1833 FUEL
MTS 1700

PUMP 600 600 600 600 600 600

PROP. PROP. PROP. PROP. PROP. PROP.


600 1000AH 1000AH 1000AH 1000AH 1000AH 1000AH
BATTERY BATTERY BATTERY BATTERY BATTERY BATTERY
MDP 785

100kVA 600

MCB 585
4055
GENSET 600
PROP.
1000AH
PROP.
1000AH
BATTERY BATTERY
PROP.
1000AH
BATTERY
PROP.
1000AH
PROP.
1000AH
BATTERY BATTERY
PROP.
1000AH
BATTERY

9695
EMDP 785 400 600 600 600 600 600 600

ACU P-RECT 250AT

585 RP 2K19
ACU

600
100kVA 1400

FUEL 800 RECTI 600


TANK 950
MTS BATTERY
BANK
780
600
GP

TRANSFORMER
MOBILE BOX
(PLDT SMART)
SMART
1550 635
ACBEL
RECTI
600
RECTI
GP
600

600
BUSINESS

PROP. 3000A RECTIFIER


ACBEL

OFFICE
BATTERY 600
780 RECTI
BANK 600
ACBEL
600
RECTI
600
600

ALC REC B
GP REC B
BATTERY

2
BANK 1 600
880
BATTERY

PPR
BANK 2

3360

20AT, 230V, 2P

20AT, 230V, 2P
NEMA 1 ECB

NEMA 1 ECB
PROP. PROP.
STACU 5 288 STACU 5
5TR 5TR
506 506

RISER UP TO HARD DRAWN COPPER TUBE


2ND FLOOR 3
8"Ø LIQUID LINE
3
4"Ø GAS LINE
8959 HARD DRAWN COPPER TUBE
5
8"Ø LIQUID LINE
5625
7560
7
8"Ø GAS LINE

ECB PANEL-1,2 & 3


50/40AT, 230V, 3P, NEMA 4X

3
936 1130

PROP. 5TR PROP. 7.5TR


336
ACCU 2&3
ACCU 1 465

LEGEND:
EXISTING

PROPOSED

REFRIGERANT PIPE:
3
8"Ø LIQUIDLINE (5TR)
3
4"Ø GAS LINE (5TR)
PLDT CAUAYAN
PROPOSED FCU

1 GROUND FLOOR PROPOSED REFRIGERANT PIPE LAYOUT PROP. 20AT FCU ECB

ME-02 PROP. 40AT ACCU ECB

PROP. 50AT ACCU ECB

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY & INSTALLATION OF 2x5TR & 1x7.5TR
PROJECT DESCRIPTION:
ACU
PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
GROUND FLOOR PROPOSED REFRIGERANT PIPE LAYOUT
ME-02
CORPORATION
SITE NAME: PLDT CAUAYAN PRC No: PTR No: REVIEWED BY:

SITE ADDRESS:
135 PAN-PHILIPPINE HWY, CAUAYAN CITY DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
3305 ISABELA SCALE: REVISION NUMBER.: ME-08
LONGITUDE: 121°46'1.51" LATITUDE: 16°58'8.37'' PLACE ISSUE: DATE APPROVED:
D E F G H I J
7090 1875 5625 6195 13450 2850
HARD DRAWN COPPER TUBE
5
8"Ø LIQUID LINE
7

1 8"Ø GAS LINE


PROP. 7.5TR 7.5 TR

NEMA 1 ECB
20AT, 230V, 2P
STACU FCU1

300 300 300 300

QCI

FUTURE
FUTURE

DCPDB

DCPDB
DCPDB

DCPDB PROP. ODF

PROP.
PROP.
PCM 600 600
ROOM
ROOM 600
PROP.
CISCO
LOT1 900

EXISTING
PROP.

ACCU
600 CISCO
LOT1 PROP. CISCO
600
FUTURE CEN
600 EQUIPMENT

PROP. CISCO
600
FUTURE CEN
600
9695
EQUIPMENT

EXISTING
ACCU
FUTURE
600 EQUIPMENT
PROP. CISCO
600
LOT 3
FUTURE
600 EQUIPMENT
PROP. CISCO
600
LOT 2

EXISTING

EXISTING

EXISTING
FUTURE
600

ACCU

ACCU

ACCU
EQUIPMENT FUTURE 9345
600
EQUIPMENT
FUTURE 12340
600 FUTURE
EQUIPMENT 600
CONFERENCE STORAGE EQUIPMENT

2ND FLOOR ROOM ROOM


FUTURE
600 EQUIPMENT FUTURE
EQUIPMENT
600
FUTURE

OPEN DECK 600


EQUIPMENT

1200
FUTURE
EQUIPMENT
600

1200

2 7.5 TR
FCU2

DEP 12
PP-REC 2 COLUMN DCPDB

WIRES
760 1000 520 600

RISER DOWN TO MDF MDF ODF ODF

8959

(WORKING)
ACU
GF GENSET ROOM 600 600 600 FEMALE

(NOT WORKING)
C.R

ACU
FUTURE 530 600 UP
HUAWEI CISCO DCPDB
CISCO

(NOT WORKING)
DCPDB1 ODF ODF

ACU
LOCKER
600 600 600 600 600 600 900 ROOM
PANTRY WATO
600 HOME HUAWEI
FIBER
DCPDB HUAWEI HUAWEI HUAWEI
ODF STORAGE OFFICE
HUAWEI HUAWEI HUAWEI OFFICE
ROOM MALE
C.R
UP

3
GT
ACU ACU
ACU (NOT WORKING) (WORKING)

LEGEND:
EXISTING

PROPOSED

REFRIGERANT PIPE:
5
8"Ø LIQUIDLINE (7.5TR)
7
8"Ø GAS LINE (7.5TR)
PLDT CAUAYAN
PROPOSED FCU

1 SECOND FLOOR PROPOSED REFRIGERANT PIPE LAYOUT PROP. 20AT FCU ECB

ME-03 PROP. 40AT ACCU ECB

PROP. 50AT ACCU ECB

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY & INSTALLATION OF 2x5TR & 1x7.5TR
PROJECT DESCRIPTION:
ACU
PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
SECOND FLOOR PROPOSED REFRIGERANT PIPE LAYOUT
ME-03
CORPORATION
SITE NAME: PLDT CAUAYAN PRC No: PTR No: REVIEWED BY:

SITE ADDRESS:
135 PAN-PHILIPPINE HWY, CAUAYAN CITY DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
3305 ISABELA SCALE: REVISION NUMBER.: ME-08
LONGITUDE: 121°46'1.51" LATITUDE: 16°58'8.37'' PLACE ISSUE: DATE APPROVED:
C D E F G H I
4065 7090 1875 5625 6195 13450

1 ECB
PANEL
MTS 3P
SMART
MCB
SMART
MTS
SMART PROP. ACU
MAIN PANEL
MTS TYPE
NEMA 1 2700

ECB 250-AT
100kVA
1170 1833 FUEL
MTS 1700

PUMP 600 600 600 600 600 600

PROP. PROP. PROP. PROP. PROP. PROP.


600 1000AH 1000AH 1000AH 1000AH 1000AH 1000AH
BATTERY BATTERY BATTERY BATTERY BATTERY BATTERY
MDP 785

100kVA 600

MCB 585
4055
GENSET 600
PROP.
1000AH
BATTERY
PROP.
1000AH
BATTERY
PROP.
1000AH
BATTERY
PROP.
1000AH
BATTERY
PROP.
1000AH
BATTERY
PROP.
1000AH
BATTERY

9695
EMDP 785 400 600 600 600 600 600 600

ACU P-RECT 250AT

585 RP 2K19
ACU

600
100kVA 1400

FUEL 800 RECTI 600


TANK 950
MTS BATTERY
BANK
780
600
GP

TRANSFORMER
MOBILE BOX
(PLDT SMART)
SMART 1550 635
ACBEL
RECTI
600
RECTI
GP
600

600
BUSINESS

PROP. 3000A RECTIFIER


ACBEL

OFFICE
BATTERY 600
780 RECTI
BANK 600
ACBEL
600
RECTI
600
600

ALC REC B
GP REC B
BATTERY

2
BANK 1 600
880
BATTERY

PPR
BANK 2

3360

20AT, 230V, 2P

20AT, 230V, 2P
NEMA 1 ECB

NEMA 1 ECB
PROP. PROP.
STACU 5 288 STACU 5
5TR 5TR

25mmØ PVC BLUE PIPE DRAIN


506 506

PIPE; TAP TO THE NEAREST


EXISTING CATCH BASIN
TO BE EMBEDDED ALONG
CONCRETE HALLWAY
8959 (RESTORE AFFECTED AREA)
5625
7560

ECB PANEL-1,2 & 3


50/40AT, 230V, 3P, NEMA 4X

3
936 1130

PROP. 5TR PROP. 7.5TR


336
ACCU 2&3
ACCU 1 465

LEGEND:
EXISTING

PROPOSED
PLDT CAUAYAN
1 GROUND FLOOR PROPOSED DRAIN PIPE LAYOUT DRAIN PIPE
25mmØ PVC BLUE PIPE

ME-04 PROPOSED FCU

PROP. 20AT FCU ECB

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY & INSTALLATION OF 2x5TR & 1x7.5TR
PROJECT DESCRIPTION:
ACU
PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
GROUND FLOOR PROPOSED DRAIN PIPE LAYOUT
ME-04
CORPORATION
SITE NAME: PLDT CAUAYAN PRC No: PTR No: REVIEWED BY:

SITE ADDRESS:
135 PAN-PHILIPPINE HWY, CAUAYAN CITY DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
3305 ISABELA SCALE: REVISION NUMBER.: ME-08
LONGITUDE: 121°46'1.51" LATITUDE: 16°58'8.37'' PLACE ISSUE: DATE APPROVED:
D E F G H I J
7090 1875 5625 6195 13450 2850
25mmØ PVC BLUE PIPE DRAIN
PIPE; TAP TO THE NEAREST

1 PROP. 7.5TR 7.5 TR


EXISTING DRAIN LINE

20AT, 230V, 2P
NEMA 1 ECB
STACU FCU1

300 300 300 300

QCI

FUTURE
FUTURE

DCPDB

DCPDB
DCPDB

DCPDB PROP. ODF

PROP.
PROP.
PCM 600 600
ROOM
ROOM 600
PROP.
CISCO
LOT1 900

EXISTING
PROP.

ACCU
600 CISCO
LOT1 PROP. CISCO
600
FUTURE CEN
600 EQUIPMENT

PROP. CISCO
600
FUTURE CEN
600
9695
EQUIPMENT

EXISTING
ACCU
FUTURE
600 EQUIPMENT
PROP. CISCO
600
LOT 3
FUTURE
600 EQUIPMENT
PROP. CISCO
600
LOT 2
EXISTING

EXISTING

EXISTING
FUTURE
600
ACCU

ACCU

ACCU
EQUIPMENT FUTURE 9345
600
EQUIPMENT
FUTURE 12340
600 FUTURE
EQUIPMENT
CONFERENCE STORAGE EQUIPMENT
600

2ND FLOOR ROOM ROOM 600


FUTURE
EQUIPMENT FUTURE
EQUIPMENT
600
FUTURE

OPEN DECK 600


EQUIPMENT

1200
FUTURE
EQUIPMENT
600

1200

2 7.5 TR
FCU2

DEP 12
PP-REC 2 COLUMN DCPDB

WIRES
760 1000 520 600
MDF MDF ODF ODF

8959
(WORKING)
ACU

600 600 600 FEMALE


(NOT WORKING)

C.R
ACU

FUTURE 530 600 UP


HUAWEI CISCO DCPDB
CISCO
(NOT WORKING)

DCPDB1 ODF ODF


ACU

LOCKER
600 600 600 600 600 600 900 ROOM
WATO
FIBER HUAWEI
DCPDB HUAWEI HUAWEI HUAWEI
STORAGE PANTRY
600 HOME
HUAWEI HUAWEI HUAWEI ODF OFFICE
OFFICE
ROOM MALE
C.R
UP

3
GT
ACU ACU
ACU (NOT WORKING) (WORKING)

LEGEND:
EXISTING

PROPOSED
PLDT CAUAYAN
1 SECOND FLOOR PROPOSED DRAIN PIPE LAYOUT DRAIN PIPE
25mmØ PVC BLUE PIPE

ME-05 PROPOSED FCU

PROP. 20AT FCU ECB

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY & INSTALLATION OF 2x5TR & 1x7.5TR
PROJECT DESCRIPTION:
ACU
PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
SECOND FLOOR PROPOSED DRAIN PIPE LAYOUT
ME-05
CORPORATION
SITE NAME: PLDT CAUAYAN PRC No: PTR No: REVIEWED BY:

SITE ADDRESS:
135 PAN-PHILIPPINE HWY, CAUAYAN CITY DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
3305 ISABELA SCALE: REVISION NUMBER.: ME-08
LONGITUDE: 121°46'1.51" LATITUDE: 16°58'8.37'' PLACE ISSUE: DATE APPROVED:
PLDT CAUAYAN
1 ISOMETRIC VIEW OF PROPOSED PANELS & ACCU LAYOUT
ME-06

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY & INSTALLATION OF 2x5TR & 1x7.5TR
PROJECT DESCRIPTION:
ACU
PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED PANELS & ACCU LAYOUT
ME-06
CORPORATION
SITE NAME: PLDT CAUAYAN PRC No: PTR No: REVIEWED BY:

SITE ADDRESS:
135 PAN-PHILIPPINE HWY, CAUAYAN CITY DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
3305 ISABELA SCALE: REVISION NUMBER.: ME-08
LONGITUDE: 121°46'1.51" LATITUDE: 16°58'8.37'' PLACE ISSUE: DATE APPROVED:
CONCRETE CEILING

AR
EB
GL AL
AN ST AR
D E EB
PE GL AL
AN ST
25mmØ DRAIN LINE TAP TO D E
25mmØ DRAIN LINE TAP TO PE ±1.75m.
NEAREST DRAIN CONNECTION
NEAREST DRAIN CONNECTION mm
600
mm ±2.05m.
400

FFL ±0.4/.0.6m.
P-TRAP
P-TRAP

7.5TR STACU 1 MOUNTING DETAILS 5TR STACU 2&3 MOUNTING DETAILS STACU MOUNTING DETAILS

ACCU 5TR
ACCU 7.5TR
936mm x 336mm x 722mm
1130mm x 465mm x 1450mm

ACCU 5TR
936mm x 336mm x 722mm

7.5TR ACCU 1 MOUNTING DETAILS 5TR ACCU 2&3 MOUNTING DETAILS

PLDT CAUAYAN
1 MISCELLANEOUS DETAILS
ME-07

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY & INSTALLATION OF 2x5TR & 1x7.5TR
PROJECT DESCRIPTION:
ACU
PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
MISCELLANEOUS DETAILS
ME-07
CORPORATION
SITE NAME: PLDT CAUAYAN PRC No: PTR No: REVIEWED BY:

SITE ADDRESS:
135 PAN-PHILIPPINE HWY, CAUAYAN CITY DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
3305 ISABELA SCALE: REVISION NUMBER.: ME-08
LONGITUDE: 121°46'1.51" LATITUDE: 16°58'8.37'' PLACE ISSUE: DATE APPROVED:
1 DRAIN PIPE DETAILS
ME - 08 NOT TO SCALE
2 PIPE SUPPORT DETAILS
ME - 08 NOT TO SCALE
3 PIPE HANGER DETAILS
ME - 08 NOT TO SCALE

4 PIPE INSTALLATION DETAILS


ME - 08 NOT TO SCALE
5 TYPICAL PIPE THRU WALL DETAIL
ME - 08 NOT TO SCALE

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY & INSTALLATION OF 2x5TR & 1x7.5TR
PROJECT DESCRIPTION:
ACU
PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
MISCELLANEOUS DETAILS
ME-08
CORPORATION
SITE NAME: PLDT CAUAYAN PRC No: PTR No: REVIEWED BY:

SITE ADDRESS:
135 PAN-PHILIPPINE HWY, CAUAYAN CITY DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
3305 ISABELA SCALE: REVISION NUMBER.: ME-08
LONGITUDE: 121°46'1.51" LATITUDE: 16°58'8.37'' PLACE ISSUE: DATE APPROVED:

You might also like