Professional Documents
Culture Documents
A B C D E F G H I J
1
FUEL
TANK
2 GENSET
MOBILE
WACU
ISNET
MCB
(6AM-6PM)
ODF
MDF
DAY
SMART
TANK
APC
MTS
RADIO ROOM
GENSET
RECTI.
MDP
DPC
MANUAL 50KW
HUAWEI
PUMP
WACU
BODEGA
(6PM-6AM)
LP
PANEL
ISNET
GENSET ROOM
EXHAUST
EP
FAN
INDANG
ECP PANEL PR-1 ATS
BATTERY ROOM
PANTRY
STOCK ROOM
TAPPING
ALCATEL
DEVICE
PR-1A DCPDB
RECTI.
ANTI
5
ECB
EQUIPMENT
(OPERATING)
FCU
3TR
CISCO
HUAWEI
PR
DPC ACBEL
RECTI. RECTI.
CB
HOME
FIBER
(STANDBY)
FCU 3
3TR
ODF ODF
MDF ROOM
COMMERCIAL AREA
(STANDBY)
FCU 2
3TR
DCPDB
location of
INDANG
RATED
PANEL
EQUIPMENT
ECB
(OPERATING)
FCU
3TR
6
GUARD
HOUSE
FACP
FCU 3 FCU 2 FCU 1
3TR 3TR 3TR
(OPERATING) (OPERATING) (OPERATING)
ECB ECB ECB
WACU
(NOT WORKING)
7 EXTG
KW-HR
METER
VICINITY MAP
8
EXTG. POLE
MOUNTED
1x50KVA
X-FORMER TO
INDANG - TRECE MARTIRES ROAD INDANG - TRECE MARTIRES ROAD
BE PULL-OUT
EXISTING 1x50KVA
POLE MOUNTED TRANSFORMER AND
RECOVERED.
PLDT INDANG
1 EXISTING SITE DEVELOPMENT PLAN LEGEND:
ME-01
EXISTING
PROPOSED
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 2x5TR
PROJECT DESCRIPTION: FCU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
EXISTING SITE DEVELOPMENT PLAN
ME-01
CORPORATION
SITE NAME: PLDT INDANG PRC No: PTR No: REVIEWED BY:
SITE ADDRESS: NO. 167 INDANG-TRECE MARITES ROAD, INDANG, CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120°53'8.01" LATITUDE: 14°11'44.44'' PLACE ISSUE: DATE APPROVED:
A B C D E F G H I I-1 I-2 I-3
J
3825 3575
1
3300 3050
1' FUEL
TANK
2750
500
MOBILE BOX
1000 1000 1000 1000 1000 1000
PROP.
700
1000
ELEV.=1.00m
PROP. MDP PROP. ATS-1 PROP. MTS-1 PROP. MTS-G PROP. MTS-L PROP. EMDP
3300
2
2500
GB
4600 1120 1200 1120
3000L
3400
ELPP
PROP. 150KW
PROP. 150KW
1"
GENSET
GENSET
2500 2500
FP
MANUAL
PUMP
1500
1300 2200
PROP.DAYTANK
1360
1450
500L
3
800
2'
300 100
WACU
ISNET
MCB
(6AM-6PM)
E.F METAL LOUVER E.F
ODF
MDF METAL LOUVER
DAY
SMART
TANK
APC
MTS
RADIO ROOM
GENSET
RECTI.
PROPOSED PROPOSED
MDP
DPC
MANUAL 50KW 1000AH 1000AH
BATTERY BATTERY
HUAWEI
PUMP
WACU
BODEGA
(6PM-6AM)
LP
PANEL
ISNET
GENSET ROOM
4
PROP. ACU
EXHAUST
MAIN PANEL
EP
FAN
PROP. EMDP-1 NEMA 4X
INDANG
ECP PANEL PR-1 ATS
ECP PANEL
INDANG
BATTERY ROOM 40AT, 230V, 3P
NEMA4X ECB 1&2
PROP. 5TR
ACCU 1&2
PANTRY
PR-1
STOCK ROOM
TAPPING
ALCATEL
DEVICE
PR-1A DCPDB
RECTI.
NEMA1 ECB 1&2
20AT, 230V, 3P
ANTI
PROP. PROP.
FCU 2 FCU 1
5TR 5TR
ECB
EQUIPMENT
(OPERATING)
FCU
3TR
CISCO
HUAWEI
PR
DPC ACBEL
RECTI. RECTI.
PROPOSED
216F ODF
CB
HOME
FIBER
(STANDBY)
FCU 3
3TR
ODF ODF
MDF ROOM
COMMERCIAL AREA
(STANDBY)
FCU 2
3TR
PROPOSED
DCPDB
DCPDB
location of
INDANG
RATED
PANEL
EQUIPMENT
PROPOSED
NCS-2006
(CISCO)
LOT 1
existing facp
NCS-5504-SYS
PROPOSED
(CISCO)
LOT 3
ECB
(OPERATING)
FCU
3TR
6
GUARD
HOUSE
FACP
FCU 3 FCU 2 FCU 1
3TR 3TR 3TR
(OPERATING) (OPERATING) (OPERATING)
ECB ECB ECB
WACU
(NOT WORKING)
PROP.3 X 50 KVA
POLE MOUNTED
TRANSFORMER
EXISTING CONCRETE SERVICE RAMP
ENTRANCE PEDESTAL
7 EXTG
KW-HR
METER
8
INDANG - TRECE MARTIRES ROAD INDANG - TRECE MARTIRES ROAD
PLDT INDANG
1 PROPOSED SITE DEVELOPMENT PLAN LEGEND:
ME-02
EXISTING
PROPOSED
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 2x5TR
PROJECT DESCRIPTION: FCU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED SITE DEVELOPMENT PLAN
ME-02
CORPORATION
SITE NAME: PLDT INDANG PRC No: PTR No: REVIEWED BY:
SITE ADDRESS: NO. 167 INDANG-TRECE MARITES ROAD, INDANG, CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120°53'8.01" LATITUDE: 14°11'44.44'' PLACE ISSUE: DATE APPROVED:
I I-1 I-2 I-3 J
5667 3825 3575 9004.99
1
3158.3
3300 3050
1'
2750
500
MOBILE BOX
1000 1000 1000 1000 1000 1000
PROP.
700
8864.75
1000
3644.12
ELEV.=1.00m
PROP. MDP PROP. ATS-1 PROP. MTS-1 PROP. MTS-G PROP. MTS-L PROP. EMDP
3300
2500
GB
4600 1120 1200 1120
3000L
3400
ELPP
PROP. 150KW
PROP. 150KW
GENSET
GENSET
1" 2500 2500
FP
MANUAL
PUMP
2726.89
1500
1300 2200
PROP.DAYTANK
1360
1450
500L
2 2'
300
E.F
100
2837.19
3
LEGEND:
EXISTING
PLDT INDANG
PROPOSED
1 PROPOSED FUEL PIPE LINE LAYOUT FUEL PIPE LINE
ME-03
EXHAUST FAN
SITE ADDRESS: NO. 167 INDANG-TRECE MARITES ROAD, INDANG, CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120°53'8.01" LATITUDE: 14°11'44.44'' PLACE ISSUE: DATE APPROVED:
NOTES:
1. The diesel fuel transfer pump shall be positive rotary gear pump, fitted with mechanical seal and pressure relief valve.
2. The diesel fuel transfer pump should be rated at 36L/min at 15 meters TDH, coupled to 1hp electric motor, 1750 rpm, 230volts, 1phase, 60 hertz.
3. Diesel fuel transfer pump shall be US or Japan made, "Roper", "Viking", "Tuthill", Sherwood" or approved equal.
4. Proposed fuel supply lines existing fuel storage tank to skid mounted Genset Base tank shall be 1-1/2" B.I. Sched. 40.
5. The existing Genset Base tank shall be provided with float switch for controlling the motor driven auxiliary fuel transfer pump for low and high fuel level.Acceptable brands
are Fozmula, Kohgiken Mac-3 or approved equal
6. The existing Genset shall be provided with battery trickle charger, including power wires and conduit. Submit schematic diagram, brochure and shop drawing for approval
of PLDT.
7. Complete mounting of 150KW skid mounted generator set is included in the scope of work of the contractor.
8. Replacement of Genset batteries, air filters, fuel filters, oil filters and lubricating oil is included in the scope of work of the contractor.
9. Provision of New 2x150KW GENSET (OPEN TYPE)
10. All necessary accessories needed to operate the 2x150KW (OPEN TYPE) shall be provided by the contractor.
RAIN CAP
MUFFLER/PIPE HANGER
EXHAUST PIPE
EXHAUST MUFFLER
OF GENSET
ACESS DOOR
FOR RADIATOR
HOT AIR DUCT
PLDT INDANG
1 PROPOSED 150KW OPEN TYPE GENSET
ME-04
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 2x5TR
PROJECT DESCRIPTION: FCU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED 150KW OPEN TYPE GENSET
ME-04
CORPORATION
SITE NAME: PLDT INDANG PRC No: PTR No: REVIEWED BY:
SITE ADDRESS: NO. 167 INDANG-TRECE MARITES ROAD, INDANG, CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120°53'8.01" LATITUDE: 14°11'44.44'' PLACE ISSUE: DATE APPROVED:
NOTES:
1. THE DIESEL DUEL DIAGRAM TRANSFER PUMP MUST BE:
a. POSITIVE ROTARY GEAR PUMP, FITTED WITH MECHANICAL SEAL AND PRESSURE RELIEF VALVE.
b. RATED AT 15GPM AT 15m TDH, COUPLED TO 1HP ELECTRIC MOTOR, 1750 RPM, 230V,1PH,60HZ.
c. U.S OR JAPAN MADE, "ROPER", "VIKING", "SHERWOOD" OR EQUAL APPROVED.
2. FUEL LINES TO DAYTANK SHALL BE B.I SCHED . 40 AND SHALL BE PROVIDED WITH THE FOLLOWING: BRONZE Y-STRAINER,CHECK VALVES, BALL VALVES,
PIPE SUPPORTS AND CLAMPS. BRAND OF VALVES MUST BE "KITZ", "TOZEN" , OR EQUAL APPROVED.
3. THE EXISTING FUEL DAYTANK SHALL BE PROVIDED WITH FLOAT SWITCH FOR CONTROLLING THE MOTOR DRIVEN AUXILIARY FUEL PUMP FOR LOW AND
HIGH FUEL LEVEL ALARMS. ACCEPTABLE BRANDS ARE FOZMULA, KOHGIKENOR APPROVED EQUAL.
4. THE CONTRACTOR SHALL SUBMIT LAYOUT OF FUEL PIPE TRENCH FROM FUEL STORAGE TO GENSET FUEL TANK.
5. ACCEPTABLE BRAND OF PUMP CONTROL PANEL ARE SCHNEIDER OR APPROVED EQUAL.
6. ACCEPTABLE BRAND OF MANUL PUMP ARE TOKHEIM,TUTHILL,FILTRITE OR APPROVED EQUAL.
7. SUBMIT BROCHURE OF 500KW GENSET FOR APPROVAL PRIOR TO PURCHASE/DELIVERY.
8. THE GENSET MUST BE LOAD TESTED FOR 4HRS FULL LOAD PRIOR TO DELIVERY TO SITE.
PROPOSED PUMP
CONTROL PANEL
PROPOSED 25mmØ
B.I. SCHED 40 PIPE IN
150KW, 3P, 230V
FUEL PIPE TRENCH
/ EMBEDDED PROPOSED
FLOAT SWITCH
PROPOSED 187.5KVA GENSET 1
BALL Y CHECK BALL
PROPOSED BALL
VALVE
CHECK VALVE Y
STRAINER
BALL
VALVE
BALL
VALVE
CHECK
VALVE
VALVE STRAINER VALVE VALVE
PROPOSED 500
FUEL STORAGE M LITERS DAYTANK
TANK PROPOSED
MOTORIZED PUMP
BALL
VALVE
3000 L
BALL BALL
VALVE VALVE 150KW, 3P, 230V
PLDT INDANG
1 PROPOSED FUEL LINE SCHEMATIC DIAGRAM
ME-05
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 2x5TR
PROJECT DESCRIPTION: FCU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED FUEL LINE SCHEMATIC DIAGRAM
ME-05
CORPORATION
SITE NAME: PLDT INDANG PRC No: PTR No: REVIEWED BY:
SITE ADDRESS: NO. 167 INDANG-TRECE MARITES ROAD, INDANG, CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120°53'8.01" LATITUDE: 14°11'44.44'' PLACE ISSUE: DATE APPROVED:
EQUIPMENT SCHEDULE
3300 3050
(PROPOSED GENSET ROOM)
PROPOSED WALL MOUNT EXHAUST FAN
500
MOBILE BOX
700
1000
ELEV.=1.00m
PROP. MDP PROP. ATS-1 PROP. MTS-1 PROP. MTS-G PROP. MTS-L PROP. EMDP
3300
2500
GB
4600 1120 1200 1120
ELPP
PROP. 150KW
PROP. 150KW
AIR CHANGES CALCULATION (CMH)
GENSET
GENSET
NO. OF TOTAL CMH AIR
2500 2500 L(M) W(M) H(M) VOLUME(M) EXHAUST FAN (EXHAUST FAN) CHANGES/HR
FP
MANUAL
PUMP
1500
6.7 6 4 160.8 2 1280 15.92
1300 2200
PROP.DAYTANK
1360
CALC.
500L
PLDT STANDARD: 15 AIR
800 AIR CHANGES = VCMH/VOLUME(M)
CHANGES/HR
AIR CHANGES = 2x1280/160.8
300 100 REMARKS: (SUFFICIENT AIR CHANGES)
AIR CHANGES = 15.92
E.F METAL LOUVER METAL LOUVER E.F
NOTE:
PROPOSED 1280CMH PROP. EF OUTLET TO BE INSTALLED BESIDE THE PROP. EXHAUST FAN
WALL MOUNT OR INSTALLATION BASED ON PLDT STANDARD
EXHAUST FAN
PLDT INDANG
1 PROPOSED EXHAUST FAN LAYOUT
ME-06
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 2x5TR
PROJECT DESCRIPTION: FCU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED EXHAUST FAN LAYOUT
ME-06
CORPORATION
SITE NAME: PLDT INDANG PRC No: PTR No: REVIEWED BY:
SITE ADDRESS: NO. 167 INDANG-TRECE MARITES ROAD, INDANG, CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120°53'8.01" LATITUDE: 14°11'44.44'' PLACE ISSUE: DATE APPROVED:
NOTE:
1. ALL ANGLE BARS (50mm X 50mm X6mm) CONNECTION MUST BE FULLY
WELDED ON ALL JOINTS.
2. DAYTANK MUST BE REPAINTED WITH PRIMER PAINT AND FINISHED WITH
ENAMEL PAINT. 1000mm
3. SEE CE FOR DAYTANK BUNDWALL DETAILS.
400mm FLOAT SWITCH
GUARD SCREEN
BRACKET SUPPORT
PLDT INDANG
1 PROPOSED 500L DAY TANK SHOP DRAWING
ME-07
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 2x5TR
PROJECT DESCRIPTION: FCU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED 500L DAY TANK SHOP DRAWING
ME-07
CORPORATION
SITE NAME: PLDT INDANG PRC No: PTR No: REVIEWED BY:
SITE ADDRESS: NO. 167 INDANG-TRECE MARITES ROAD, INDANG, CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120°53'8.01" LATITUDE: 14°11'44.44'' PLACE ISSUE: DATE APPROVED:
3710
1500
TOP VIEW
3710
1500
CONCRETE LEG SUPPORT
SIDE VIEW
NOTE: FRONT VIEW
1. FUEL STORAGE TANK MUST BE REPAINTED WITH PRIMER PAINT AND FINISHED WITH ENAMEL PAINT.
2. FUEL DAYTANK AND FUEL STORAGE TANK SHALL BE PROVIDED WITH BUNDWALL EQUIVALENT TO
110% OF FUEL CAPACITY.
PLDT INDANG
1 PROPOSED FUEL STORAGE TANK AND COMPUTATIONS
ME-08
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 2x5TR
PROJECT DESCRIPTION: FCU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED FUEL STORAGE TANK AND COMPUTATIONS
ME-08
CORPORATION
SITE NAME: PLDT INDANG PRC No: PTR No: REVIEWED BY:
SITE ADDRESS: NO. 167 INDANG-TRECE MARITES ROAD, INDANG, CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120°53'8.01" LATITUDE: 14°11'44.44'' PLACE ISSUE: DATE APPROVED:
EXHAUST PIPE
CONRETE WALL
4-12mm dia. LONGITUDINAL SEAM
BOLT, NUT AND PIPE INSULATION CROSS-SECTIONAL SEAM
WASHER
PERLITE BLOCK
INSULATION
C-CHANNEL
FICEMBOARD FICEMBOARD
EXHAUST PIPE
LONGITUDINAL AND
CROSS-SECTIONAL SEAM
(TYPICAL)
EXHAUST PIPE HANGER DETAIL EXHAUST THIMBLE PIPE EXHAUST CLADDING DETAIL
EGL
3000PSI CONCRETE
EXPANSION REINFORCED WITH
CLAMP 10MM DIA. BARS
BOLT PROPOSED 32mm 0.40m
FUEL SUPPLY LINES
2"PVC DRAIN PIPE
TO BE CLAMPLED
TO TRENCH WALL
@ EVERY 0.40m
CLAMPING 0.10
BAND
NOTE:
1. DRAIN TO BE TAPPED TO THE NEAREST EXISTING DRAINAGE SYSTEM
2. VERIFY JOBSITE AND SUBMIT SHOP DRAWINGS FOR APPROVAL.
PLDT INDANG
1 MISCELLANEOUS DETAILS
ME-09
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 2x5TR
PROJECT DESCRIPTION: FCU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
MISCELLANEOUS DETAILS
ME-09
CORPORATION
SITE NAME: PLDT INDANG PRC No: PTR No: REVIEWED BY:
SITE ADDRESS: NO. 167 INDANG-TRECE MARITES ROAD, INDANG, CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120°53'8.01" LATITUDE: 14°11'44.44'' PLACE ISSUE: DATE APPROVED:
F G H I
2
ODF
MDF
SMART
APC
RADIO ROOM
RECTI.
DPC
HUAWEI
WACU
BODEGA
(6PM-6AM)
3 PROP. ACU
MAIN PANEL
NEMA 4X
PROP. 5TR
ACCU 1&2
5 HARD DRAWN COPPER TUBE
TAPPING
ALCATEL
PR-1A
DEVICE
DCPDB
RECTI.
NEMA1 ECB 1&2
20AT, 230V, 3P
ANTI
PROP. PROP.
FCU 2 FCU 1
3
8"Ø LIQUID LINE
5TR 5TR
3
4"Ø GAS LINE
ECB
EQUIPMENT
(OPERATING)
FCU
3TR
CISCO
HUAWEI
PR
DPC ACBEL
RECTI. RECTI.
PROPOSED
CB
216F ODF
HOME
FIBER
(STANDBY)
FCU 3
3TR
ODF ODF
MDF ROOM
(STANDBY)
FCU 2
3TR
PROPOSED
DCPDB
DCPDB
INDANG
RATED
PANEL
EQUIPMENT
PROPOSED
NCS-2006
(CISCO)
LOT 1
NCS-5504-SYS
PROPOSED
(CISCO)
LOT 3
ECB
(OPERATING)
FCU
3TR
FCU 3 FCU 2 FCU 1
3TR
(OPERATING)
3TR
(OPERATING)
3TR
(OPERATING) LEGEND:
6
ECB ECB ECB
WACU
EXISTING
PROPOSED
REFRIGERANT PIPE:
3
8"Ø LIQUIDLINE (5TR)
PLDT INDANG 3
4"Ø GAS LINE (5TR)
PROPOSED ACCU
ME-10
PROP. 20AT FCU ECB
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 2x5TR
PROJECT DESCRIPTION: FCU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED REFRIGERANT PIPE LINE LAYOUT
ME-10
CORPORATION
SITE NAME: PLDT INDANG PRC No: PTR No: REVIEWED BY:
SITE ADDRESS: NO. 167 INDANG-TRECE MARITES ROAD, INDANG, CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120°53'8.01" LATITUDE: 14°11'44.44'' PLACE ISSUE: DATE APPROVED:
F G H I
2
ODF
MDF
SMART
APC
RADIO ROOM
RECTI.
DPC
HUAWEI
WACU
BODEGA
(6PM-6AM)
3 PROP. ACU
MAIN PANEL
NEMA 4X
PROP. 5TR
ACCU 1&2
5
TAPPING
ALCATEL
PR-1A DCPDB
DEVICE
RECTI.
25mmØ PVC BLUE
20AT, 230V, 3P
NEMA1 ECB 1&2
ANTI
PROP. PROP.
FCU 2 FCU 1
5TR 5TR
ECB
EQUIPMENT
(OPERATING)
FCU
3TR
CISCO
HUAWEI
PR
DPC ACBEL
RECTI. RECTI.
PROPOSED
CB
216F ODF
HOME
FIBER
(STANDBY)
FCU 3
3TR
ODF ODF
MDF ROOM
(STANDBY)
FCU 2
3TR
PROPOSED
DCPDB
DCPDB
INDANG
RATED
PANEL
EQUIPMENT
PROPOSED
NCS-2006
(CISCO)
LOT 1
NCS-5504-SYS
PROPOSED
(CISCO)
LOT 3
ECB
(OPERATING)
FCU
3TR
LEGEND:
FCU 3 FCU 2 FCU 1
EXISTING
3TR 3TR 3TR
(OPERATING) (OPERATING) (OPERATING)
6 PROPOSED
ECB ECB ECB
WACU
DRAIN PIPE
25mmØ PVC BLUE PIPE
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 2x5TR
PROJECT DESCRIPTION: FCU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED DRAIN PIPE LINE LAYOUT
ME-11
CORPORATION
SITE NAME: PLDT INDANG PRC No: PTR No: REVIEWED BY:
SITE ADDRESS: NO. 167 INDANG-TRECE MARITES ROAD, INDANG, CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120°53'8.01" LATITUDE: 14°11'44.44'' PLACE ISSUE: DATE APPROVED:
PLDT INDANG
1 PROPOSED ACCU LAYOUT ISOMETRIC VIEW LEGEND:
ME-12
EXISTING
PROPOSED
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 2x5TR
PROJECT DESCRIPTION: FCU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED ACCU LAYOUT ISOMETRIC VIEW
ME-12
CORPORATION
SITE NAME: PLDT INDANG PRC No: PTR No: REVIEWED BY:
SITE ADDRESS: NO. 167 INDANG-TRECE MARITES ROAD, INDANG, CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120°53'8.01" LATITUDE: 14°11'44.44'' PLACE ISSUE: DATE APPROVED:
CONCRETE CEILING
AR
EB
GL L
AN S TA
25mmØ DRAIN LINE TAP TO DE
PE
NEAREST DRAIN CONNECTION
mm
600
±1.75m.
±2.05m.
P-TRAP
PLDT INDANG
1 FCU & ACCU MOUNTING DETAILS
ME-13
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 2x5TR
PROJECT DESCRIPTION: FCU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
FCU & ACCU MOUNTING DETAILS
ME-13
CORPORATION
SITE NAME: PLDT INDANG PRC No: PTR No: REVIEWED BY:
SITE ADDRESS: NO. 167 INDANG-TRECE MARITES ROAD, INDANG, CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120°53'8.01" LATITUDE: 14°11'44.44'' PLACE ISSUE: DATE APPROVED:
DRAIN PIPE DETAILS PIPE SUPPORT DETAILS PIPE HANGER DETAILS
NOT TO SCALE NOT TO SCALE NOT TO SCALE
PLDT INDANG
1 MISCELLANEOUS DETAILS
ME-14
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 2x5TR
PROJECT DESCRIPTION: FCU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
MISCELLANEOUS DETAILS
ME-14
CORPORATION
SITE NAME: PLDT INDANG PRC No: PTR No: REVIEWED BY:
SITE ADDRESS: NO. 167 INDANG-TRECE MARITES ROAD, INDANG, CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120°53'8.01" LATITUDE: 14°11'44.44'' PLACE ISSUE: DATE APPROVED: