You are on page 1of 14

GENERAL NOTES:

A B C D E F G H I J
1
FUEL
TANK

2 GENSET
MOBILE

PROPOSED TO REMOVE AND


UP-ROOT THE EXISTING TREE

WACU
ISNET
MCB

(6AM-6PM)
ODF
MDF
DAY

SMART
TANK

APC
MTS
RADIO ROOM

GENSET

RECTI.
MDP

DPC
MANUAL 50KW

HUAWEI
PUMP

WACU
BODEGA

(6PM-6AM)
LP
PANEL
ISNET
GENSET ROOM

EXHAUST

EP
FAN
INDANG
ECP PANEL PR-1 ATS
BATTERY ROOM
PANTRY
STOCK ROOM

TAPPING

ALCATEL
DEVICE
PR-1A DCPDB

RECTI.
ANTI
5

ECB
EQUIPMENT

(OPERATING)
FCU
3TR
CISCO
HUAWEI

PR
DPC ACBEL
RECTI. RECTI.

CB
HOME
FIBER

(STANDBY)
FCU 3
3TR
ODF ODF
MDF ROOM
COMMERCIAL AREA

(STANDBY)
FCU 2
3TR
DCPDB
location of

INDANG
RATED
PANEL
EQUIPMENT

existing facp SWITCHING ROOM

ECB
(OPERATING)
FCU
3TR
6
GUARD
HOUSE

FACP
FCU 3 FCU 2 FCU 1
3TR 3TR 3TR
(OPERATING) (OPERATING) (OPERATING)
ECB ECB ECB

WACU
(NOT WORKING)

EXISTING CONCRETE SERVICE RAMP


ENTRANCE PEDESTAL

7 EXTG
KW-HR
METER

VICINITY MAP
8
EXTG. POLE
MOUNTED
1x50KVA
X-FORMER TO
INDANG - TRECE MARTIRES ROAD INDANG - TRECE MARTIRES ROAD
BE PULL-OUT
EXISTING 1x50KVA
POLE MOUNTED TRANSFORMER AND
RECOVERED.

PLDT INDANG
1 EXISTING SITE DEVELOPMENT PLAN LEGEND:
ME-01
EXISTING

PROPOSED

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 2x5TR
PROJECT DESCRIPTION: FCU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
EXISTING SITE DEVELOPMENT PLAN
ME-01
CORPORATION
SITE NAME: PLDT INDANG PRC No: PTR No: REVIEWED BY:

SITE ADDRESS: NO. 167 INDANG-TRECE MARITES ROAD, INDANG, CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120°53'8.01" LATITUDE: 14°11'44.44'' PLACE ISSUE: DATE APPROVED:
A B C D E F G H I I-1 I-2 I-3
J
3825 3575

1
3300 3050

1' FUEL
TANK

2750
500

MOBILE BOX
1000 1000 1000 1000 1000 1000

PROP.
700

1000
ELEV.=1.00m
PROP. MDP PROP. ATS-1 PROP. MTS-1 PROP. MTS-G PROP. MTS-L PROP. EMDP
3300

2
2500

GB
4600 1120 1200 1120

3000L
3400
ELPP
PROP. 150KW

PROP. 150KW
1"

GENSET

GENSET
2500 2500

FP
MANUAL
PUMP
1500
1300 2200

PROP.DAYTANK
1360

1450
500L
3
800

2'
300 100

WACU
ISNET
MCB

(6AM-6PM)
E.F METAL LOUVER E.F

ODF
MDF METAL LOUVER
DAY

SMART
TANK

APC
MTS
RADIO ROOM

GENSET

RECTI.
PROPOSED PROPOSED

MDP

DPC
MANUAL 50KW 1000AH 1000AH
BATTERY BATTERY

HUAWEI
PUMP

WACU
BODEGA

(6PM-6AM)
LP
PANEL
ISNET
GENSET ROOM

4
PROP. ACU

EXHAUST
MAIN PANEL

EP
FAN
PROP. EMDP-1 NEMA 4X
INDANG
ECP PANEL PR-1 ATS

ECP PANEL
INDANG
BATTERY ROOM 40AT, 230V, 3P
NEMA4X ECB 1&2

PROP. 5TR
ACCU 1&2
PANTRY

PR-1
STOCK ROOM

TAPPING

ALCATEL
DEVICE
PR-1A DCPDB

RECTI.
NEMA1 ECB 1&2
20AT, 230V, 3P

ANTI
PROP. PROP.
FCU 2 FCU 1
5TR 5TR

ECB
EQUIPMENT

(OPERATING)
FCU
3TR
CISCO
HUAWEI

PR
DPC ACBEL
RECTI. RECTI.
PROPOSED
216F ODF

CB
HOME
FIBER

(STANDBY)
FCU 3
3TR
ODF ODF
MDF ROOM
COMMERCIAL AREA

(STANDBY)
FCU 2
3TR
PROPOSED
DCPDB

DCPDB
location of

INDANG
RATED
PANEL
EQUIPMENT

PROPOSED

NCS-2006
(CISCO)
LOT 1
existing facp

NCS-5504-SYS
PROPOSED

(CISCO)
LOT 3

ECB
(OPERATING)
FCU
3TR
6
GUARD
HOUSE

FACP
FCU 3 FCU 2 FCU 1
3TR 3TR 3TR
(OPERATING) (OPERATING) (OPERATING)
ECB ECB ECB

WACU
(NOT WORKING)

PROP.3 X 50 KVA
POLE MOUNTED
TRANSFORMER
EXISTING CONCRETE SERVICE RAMP
ENTRANCE PEDESTAL

7 EXTG
KW-HR
METER

8
INDANG - TRECE MARTIRES ROAD INDANG - TRECE MARTIRES ROAD

PLDT INDANG
1 PROPOSED SITE DEVELOPMENT PLAN LEGEND:
ME-02
EXISTING

PROPOSED

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 2x5TR
PROJECT DESCRIPTION: FCU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED SITE DEVELOPMENT PLAN
ME-02
CORPORATION
SITE NAME: PLDT INDANG PRC No: PTR No: REVIEWED BY:

SITE ADDRESS: NO. 167 INDANG-TRECE MARITES ROAD, INDANG, CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120°53'8.01" LATITUDE: 14°11'44.44'' PLACE ISSUE: DATE APPROVED:
I I-1 I-2 I-3 J
5667 3825 3575 9004.99

1
3158.3

3300 3050

1'

2750
500

MOBILE BOX
1000 1000 1000 1000 1000 1000

PROP.
700
8864.75

1000
3644.12

ELEV.=1.00m
PROP. MDP PROP. ATS-1 PROP. MTS-1 PROP. MTS-G PROP. MTS-L PROP. EMDP
3300

2500

GB
4600 1120 1200 1120

3000L
3400
ELPP
PROP. 150KW

PROP. 150KW
GENSET

GENSET
1" 2500 2500

FP
MANUAL
PUMP
2726.89

1500
1300 2200

PROP.DAYTANK
1360

1450
500L
2 2'
300

E.F METAL LOUVER METAL LOUVER


800

E.F
100
2837.19

3
LEGEND:
EXISTING
PLDT INDANG
PROPOSED
1 PROPOSED FUEL PIPE LINE LAYOUT FUEL PIPE LINE
ME-03
EXHAUST FAN

PROP. PIPE TRENCH


CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 2x5TR
PROJECT DESCRIPTION: FCU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED FUEL PIPE LINE LAYOUT
ME-03
CORPORATION
SITE NAME: PLDT INDANG PRC No: PTR No: REVIEWED BY:

SITE ADDRESS: NO. 167 INDANG-TRECE MARITES ROAD, INDANG, CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120°53'8.01" LATITUDE: 14°11'44.44'' PLACE ISSUE: DATE APPROVED:
NOTES:
1. The diesel fuel transfer pump shall be positive rotary gear pump, fitted with mechanical seal and pressure relief valve.
2. The diesel fuel transfer pump should be rated at 36L/min at 15 meters TDH, coupled to 1hp electric motor, 1750 rpm, 230volts, 1phase, 60 hertz.
3. Diesel fuel transfer pump shall be US or Japan made, "Roper", "Viking", "Tuthill", Sherwood" or approved equal.
4. Proposed fuel supply lines existing fuel storage tank to skid mounted Genset Base tank shall be 1-1/2" B.I. Sched. 40.
5. The existing Genset Base tank shall be provided with float switch for controlling the motor driven auxiliary fuel transfer pump for low and high fuel level.Acceptable brands
are Fozmula, Kohgiken Mac-3 or approved equal
6. The existing Genset shall be provided with battery trickle charger, including power wires and conduit. Submit schematic diagram, brochure and shop drawing for approval
of PLDT.
7. Complete mounting of 150KW skid mounted generator set is included in the scope of work of the contractor.
8. Replacement of Genset batteries, air filters, fuel filters, oil filters and lubricating oil is included in the scope of work of the contractor.
9. Provision of New 2x150KW GENSET (OPEN TYPE)
10. All necessary accessories needed to operate the 2x150KW (OPEN TYPE) shall be provided by the contractor.
RAIN CAP

EXHAUST HEIGHT SHOULD BE


0.8-1m ABOVE THE PARAPET WALL

MUFFLER PIPE SUPPORT

MUFFLER/PIPE HANGER

EXHAUST PIPE INSULATION WITH SPRING HANGER


Ga. #26 ALUMINUM CLADDING SUPPORT (TYPICAL)

EXHAUST PIPE
EXHAUST MUFFLER
OF GENSET

DENR TEST PORT


250mm DIA. B.I PIPE SCHED 40 WITH ROCKWOOL
INSULATION & ALUMINUM CLADDING (WITHIN GENSET EXHAUST THIMBLE
ROOM CANVASS
FLEXIBLE EXHAUST PIPE CONNECTOR (SEE DETAIL)
CONNECTOR WITH Ga.#14 EXISTING REMOVABLE METAL LOUVER
EXPANDED METAL GUARD FOR GENSET HOT AIR EXHAUST
(BY OTHERS)
CONDENSATE DRAIN
G.I. PIPE 15mm DIA.

ACESS DOOR
FOR RADIATOR
HOT AIR DUCT

HOT AIR DUCT


1.4W x 1.8H
PROPOSE 187.5KVA (150KW) GENSET Ga.16 G.I. SHEET

NEOPRENE RUBBER PAD (TYPICAL)

PLDT INDANG
1 PROPOSED 150KW OPEN TYPE GENSET
ME-04

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 2x5TR
PROJECT DESCRIPTION: FCU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED 150KW OPEN TYPE GENSET
ME-04
CORPORATION
SITE NAME: PLDT INDANG PRC No: PTR No: REVIEWED BY:

SITE ADDRESS: NO. 167 INDANG-TRECE MARITES ROAD, INDANG, CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120°53'8.01" LATITUDE: 14°11'44.44'' PLACE ISSUE: DATE APPROVED:
NOTES:
1. THE DIESEL DUEL DIAGRAM TRANSFER PUMP MUST BE:
a. POSITIVE ROTARY GEAR PUMP, FITTED WITH MECHANICAL SEAL AND PRESSURE RELIEF VALVE.
b. RATED AT 15GPM AT 15m TDH, COUPLED TO 1HP ELECTRIC MOTOR, 1750 RPM, 230V,1PH,60HZ.
c. U.S OR JAPAN MADE, "ROPER", "VIKING", "SHERWOOD" OR EQUAL APPROVED.
2. FUEL LINES TO DAYTANK SHALL BE B.I SCHED . 40 AND SHALL BE PROVIDED WITH THE FOLLOWING: BRONZE Y-STRAINER,CHECK VALVES, BALL VALVES,
PIPE SUPPORTS AND CLAMPS. BRAND OF VALVES MUST BE "KITZ", "TOZEN" , OR EQUAL APPROVED.
3. THE EXISTING FUEL DAYTANK SHALL BE PROVIDED WITH FLOAT SWITCH FOR CONTROLLING THE MOTOR DRIVEN AUXILIARY FUEL PUMP FOR LOW AND
HIGH FUEL LEVEL ALARMS. ACCEPTABLE BRANDS ARE FOZMULA, KOHGIKENOR APPROVED EQUAL.
4. THE CONTRACTOR SHALL SUBMIT LAYOUT OF FUEL PIPE TRENCH FROM FUEL STORAGE TO GENSET FUEL TANK.
5. ACCEPTABLE BRAND OF PUMP CONTROL PANEL ARE SCHNEIDER OR APPROVED EQUAL.
6. ACCEPTABLE BRAND OF MANUL PUMP ARE TOKHEIM,TUTHILL,FILTRITE OR APPROVED EQUAL.
7. SUBMIT BROCHURE OF 500KW GENSET FOR APPROVAL PRIOR TO PURCHASE/DELIVERY.
8. THE GENSET MUST BE LOAD TESTED FOR 4HRS FULL LOAD PRIOR TO DELIVERY TO SITE.

PROPOSED PUMP
CONTROL PANEL
PROPOSED 25mmØ
B.I. SCHED 40 PIPE IN
150KW, 3P, 230V
FUEL PIPE TRENCH
/ EMBEDDED PROPOSED
FLOAT SWITCH
PROPOSED 187.5KVA GENSET 1
BALL Y CHECK BALL
PROPOSED BALL
VALVE
CHECK VALVE Y
STRAINER
BALL
VALVE
BALL
VALVE
CHECK
VALVE
VALVE STRAINER VALVE VALVE
PROPOSED 500
FUEL STORAGE M LITERS DAYTANK

TANK PROPOSED
MOTORIZED PUMP
BALL
VALVE

3000 L
BALL BALL
VALVE VALVE 150KW, 3P, 230V

PROPOSED PROPOSED 187.5KVA GENSET 2


MANUAL PUMP Y CHECK BALL
STRAINER VALVE VALVE

PLDT INDANG
1 PROPOSED FUEL LINE SCHEMATIC DIAGRAM
ME-05

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 2x5TR
PROJECT DESCRIPTION: FCU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED FUEL LINE SCHEMATIC DIAGRAM
ME-05
CORPORATION
SITE NAME: PLDT INDANG PRC No: PTR No: REVIEWED BY:

SITE ADDRESS: NO. 167 INDANG-TRECE MARITES ROAD, INDANG, CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120°53'8.01" LATITUDE: 14°11'44.44'' PLACE ISSUE: DATE APPROVED:
EQUIPMENT SCHEDULE
3300 3050
(PROPOSED GENSET ROOM)
PROPOSED WALL MOUNT EXHAUST FAN
500
MOBILE BOX

1000 1000 1000 1000 1000 1000


PROP.

700
1000
ELEV.=1.00m

PROP. MDP PROP. ATS-1 PROP. MTS-1 PROP. MTS-G PROP. MTS-L PROP. EMDP
3300

2500

GB
4600 1120 1200 1120

ELPP
PROP. 150KW

PROP. 150KW
AIR CHANGES CALCULATION (CMH)
GENSET

GENSET
NO. OF TOTAL CMH AIR
2500 2500 L(M) W(M) H(M) VOLUME(M) EXHAUST FAN (EXHAUST FAN) CHANGES/HR

FP
MANUAL
PUMP
1500
6.7 6 4 160.8 2 1280 15.92
1300 2200

PROP.DAYTANK
1360
CALC.

500L
PLDT STANDARD: 15 AIR
800 AIR CHANGES = VCMH/VOLUME(M)
CHANGES/HR
AIR CHANGES = 2x1280/160.8
300 100 REMARKS: (SUFFICIENT AIR CHANGES)
AIR CHANGES = 15.92
E.F METAL LOUVER METAL LOUVER E.F

NOTE:
PROPOSED 1280CMH PROP. EF OUTLET TO BE INSTALLED BESIDE THE PROP. EXHAUST FAN
WALL MOUNT OR INSTALLATION BASED ON PLDT STANDARD
EXHAUST FAN

PLDT INDANG
1 PROPOSED EXHAUST FAN LAYOUT
ME-06

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 2x5TR
PROJECT DESCRIPTION: FCU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED EXHAUST FAN LAYOUT
ME-06
CORPORATION
SITE NAME: PLDT INDANG PRC No: PTR No: REVIEWED BY:

SITE ADDRESS: NO. 167 INDANG-TRECE MARITES ROAD, INDANG, CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120°53'8.01" LATITUDE: 14°11'44.44'' PLACE ISSUE: DATE APPROVED:
NOTE:
1. ALL ANGLE BARS (50mm X 50mm X6mm) CONNECTION MUST BE FULLY
WELDED ON ALL JOINTS.
2. DAYTANK MUST BE REPAINTED WITH PRIMER PAINT AND FINISHED WITH
ENAMEL PAINT. 1000mm
3. SEE CE FOR DAYTANK BUNDWALL DETAILS.
400mm FLOAT SWITCH

VENT LINE 400X300 HAND HOLE


25mm DIA. B.I. SCHED. 40 WITH GASKET INSERT 25mm DIA. B.I. SCHED. 40
FUEL RETURN LINE FROM ON STEEL COVER FUEL DELIVERY LINE
GENSET

15mm SIGHT GLASS


WITH GUARD SCREEN
(ALL AROUND)
1200mm
GA # 14 B.I. SHEET

GUARD SCREEN
BRACKET SUPPORT

50mm X 50mm X 6mm


ANGLE BARS FULLY
WELD ON ALL JOINTS
EXISTING 38mm DIA GATE
GROUND WIRE VALVE FOR DRAIN
TO BE TAPPED
1000mm
32mm DIA. B.I. SCHED. 40
FUEL SUPPLY LINE
PROPOSED CONTAINMENT
(SEE CE FOR DETAILS)

FINISHED FLOOR LINE


150x150x5mm BASE
PLATE WITH 4PCS. 6mm DIA.
SELF DRILLING ACHOR BOLT
PROPOSED CONTAIMENT
(SEE CE FOR DETAILS)

PLDT INDANG
1 PROPOSED 500L DAY TANK SHOP DRAWING
ME-07

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 2x5TR
PROJECT DESCRIPTION: FCU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED 500L DAY TANK SHOP DRAWING
ME-07
CORPORATION
SITE NAME: PLDT INDANG PRC No: PTR No: REVIEWED BY:

SITE ADDRESS: NO. 167 INDANG-TRECE MARITES ROAD, INDANG, CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120°53'8.01" LATITUDE: 14°11'44.44'' PLACE ISSUE: DATE APPROVED:
3710

1500

TOP VIEW

3710

1500
CONCRETE LEG SUPPORT

CONCRETE LEG SUPPORT

CONCRETE LEG SUPPORT

SIDE VIEW
NOTE: FRONT VIEW
1. FUEL STORAGE TANK MUST BE REPAINTED WITH PRIMER PAINT AND FINISHED WITH ENAMEL PAINT.
2. FUEL DAYTANK AND FUEL STORAGE TANK SHALL BE PROVIDED WITH BUNDWALL EQUIVALENT TO
110% OF FUEL CAPACITY.

PLDT INDANG
1 PROPOSED FUEL STORAGE TANK AND COMPUTATIONS
ME-08

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 2x5TR
PROJECT DESCRIPTION: FCU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED FUEL STORAGE TANK AND COMPUTATIONS
ME-08
CORPORATION
SITE NAME: PLDT INDANG PRC No: PTR No: REVIEWED BY:

SITE ADDRESS: NO. 167 INDANG-TRECE MARITES ROAD, INDANG, CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120°53'8.01" LATITUDE: 14°11'44.44'' PLACE ISSUE: DATE APPROVED:
EXHAUST PIPE

CONRETE WALL
4-12mm dia. LONGITUDINAL SEAM
BOLT, NUT AND PIPE INSULATION CROSS-SECTIONAL SEAM
WASHER
PERLITE BLOCK
INSULATION

4" x 2mm THICK 4" x 2mm THICK PIPE SLEEVE


STEEL FURLINS STEEL FURLINS

C-CHANNEL
FICEMBOARD FICEMBOARD
EXHAUST PIPE

12mm DIA. THREADED Ga. No.26 ALUMINUM


STEEL ROD HANGER SHEET METAL CLADDING 12mmO 45 deg. G.I.
SPRING HANGER SUPPORT ELBOW CONDENSATE

400mm x 400mm x 4mm


Ga. No.26 ALUMINUM
INSULATION mild steel masking plate
METAL CLADDING
EXHAUST PIPE
CLADDING both sides
INSULATION BLIND RIVET

LONGITUDINAL AND
CROSS-SECTIONAL SEAM
(TYPICAL)

EXHAUST PIPE HANGER DETAIL EXHAUST THIMBLE PIPE EXHAUST CLADDING DETAIL

COUNTER 1" SQUARE BAR RAILINGS SPACED @ 25mm


FULL WELDED
WEIGHT HINGE
1" SQUARE BAR
CAP
2- 1" x 1" x 1/4 " ANGLE BAR FULL WELD 0.50m
WITH 10mm STEEL DOWELS @ 0.30m 0.10m

EGL
3000PSI CONCRETE
EXPANSION REINFORCED WITH
CLAMP 10MM DIA. BARS
BOLT PROPOSED 32mm 0.40m
FUEL SUPPLY LINES
2"PVC DRAIN PIPE
TO BE CLAMPLED
TO TRENCH WALL
@ EVERY 0.40m
CLAMPING 0.10
BAND
NOTE:
1. DRAIN TO BE TAPPED TO THE NEAREST EXISTING DRAINAGE SYSTEM
2. VERIFY JOBSITE AND SUBMIT SHOP DRAWINGS FOR APPROVAL.

PIPE SUPPORT DETAILS EXHAUST THIMBLE DETAIL PIPE TRENCH DETAILS

PLDT INDANG
1 MISCELLANEOUS DETAILS
ME-09

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 2x5TR
PROJECT DESCRIPTION: FCU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
MISCELLANEOUS DETAILS
ME-09
CORPORATION
SITE NAME: PLDT INDANG PRC No: PTR No: REVIEWED BY:

SITE ADDRESS: NO. 167 INDANG-TRECE MARITES ROAD, INDANG, CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120°53'8.01" LATITUDE: 14°11'44.44'' PLACE ISSUE: DATE APPROVED:
F G H I
2

ODF
MDF

SMART
APC
RADIO ROOM

RECTI.
DPC

HUAWEI

WACU
BODEGA

(6PM-6AM)
3 PROP. ACU
MAIN PANEL
NEMA 4X

4 BATTERY ROOM 40AT, 230V, 3P


NEMA4X ECB 1&2

PROP. 5TR
ACCU 1&2
5 HARD DRAWN COPPER TUBE

TAPPING

ALCATEL
PR-1A

DEVICE
DCPDB

RECTI.
NEMA1 ECB 1&2
20AT, 230V, 3P

ANTI
PROP. PROP.
FCU 2 FCU 1
3
8"Ø LIQUID LINE
5TR 5TR

3
4"Ø GAS LINE

ECB
EQUIPMENT

(OPERATING)
FCU
3TR
CISCO
HUAWEI

PR
DPC ACBEL
RECTI. RECTI.
PROPOSED

CB
216F ODF
HOME
FIBER

(STANDBY)
FCU 3
3TR
ODF ODF
MDF ROOM

(STANDBY)
FCU 2
3TR
PROPOSED
DCPDB

DCPDB

INDANG
RATED
PANEL
EQUIPMENT

PROPOSED

NCS-2006
(CISCO)
LOT 1

NCS-5504-SYS
PROPOSED

(CISCO)
LOT 3

ECB
(OPERATING)
FCU
3TR
FCU 3 FCU 2 FCU 1
3TR
(OPERATING)
3TR
(OPERATING)
3TR
(OPERATING) LEGEND:
6
ECB ECB ECB

WACU
EXISTING

PROPOSED

REFRIGERANT PIPE:
3
8"Ø LIQUIDLINE (5TR)
PLDT INDANG 3
4"Ø GAS LINE (5TR)

1 PROPOSED REFRIGERANT PIPE LINE LAYOUT PROPOSED FCU

PROPOSED ACCU
ME-10
PROP. 20AT FCU ECB

PROP. 40AT ACCU ECB

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 2x5TR
PROJECT DESCRIPTION: FCU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED REFRIGERANT PIPE LINE LAYOUT
ME-10
CORPORATION
SITE NAME: PLDT INDANG PRC No: PTR No: REVIEWED BY:

SITE ADDRESS: NO. 167 INDANG-TRECE MARITES ROAD, INDANG, CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120°53'8.01" LATITUDE: 14°11'44.44'' PLACE ISSUE: DATE APPROVED:
F G H I
2

ODF
MDF

SMART
APC
RADIO ROOM

RECTI.
DPC

HUAWEI

WACU
BODEGA

(6PM-6AM)
3 PROP. ACU
MAIN PANEL
NEMA 4X

4 BATTERY ROOM 40AT, 230V, 3P


NEMA4X ECB 1&2

PROP. 5TR
ACCU 1&2
5

TAPPING

ALCATEL
PR-1A DCPDB

DEVICE

RECTI.
25mmØ PVC BLUE

20AT, 230V, 3P
NEMA1 ECB 1&2

ANTI
PROP. PROP.
FCU 2 FCU 1
5TR 5TR

PIPE DRAIN PIPE;


TAP TO NEAREST
CATCH BASIN

ECB
EQUIPMENT

(OPERATING)
FCU
3TR
CISCO
HUAWEI

PR
DPC ACBEL
RECTI. RECTI.
PROPOSED

CB
216F ODF
HOME
FIBER

(STANDBY)
FCU 3
3TR
ODF ODF
MDF ROOM

(STANDBY)
FCU 2
3TR
PROPOSED
DCPDB

DCPDB

INDANG
RATED
PANEL
EQUIPMENT

PROPOSED

NCS-2006
(CISCO)
LOT 1

NCS-5504-SYS
PROPOSED

(CISCO)
LOT 3

ECB
(OPERATING)
FCU
3TR
LEGEND:
FCU 3 FCU 2 FCU 1
EXISTING
3TR 3TR 3TR
(OPERATING) (OPERATING) (OPERATING)

6 PROPOSED
ECB ECB ECB

WACU

DRAIN PIPE
25mmØ PVC BLUE PIPE

PLDT INDANG PROPOSED FCU

1 PROPOSED DRAIN PIPE LINE LAYOUT PROPOSED ACCU

PROP. 20AT FCU ECB


ME-11
PROP. 40AT ACCU ECB

PROP. ACU PANEL

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 2x5TR
PROJECT DESCRIPTION: FCU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED DRAIN PIPE LINE LAYOUT
ME-11
CORPORATION
SITE NAME: PLDT INDANG PRC No: PTR No: REVIEWED BY:

SITE ADDRESS: NO. 167 INDANG-TRECE MARITES ROAD, INDANG, CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120°53'8.01" LATITUDE: 14°11'44.44'' PLACE ISSUE: DATE APPROVED:
PLDT INDANG
1 PROPOSED ACCU LAYOUT ISOMETRIC VIEW LEGEND:
ME-12
EXISTING

PROPOSED

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 2x5TR
PROJECT DESCRIPTION: FCU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
PROPOSED ACCU LAYOUT ISOMETRIC VIEW
ME-12
CORPORATION
SITE NAME: PLDT INDANG PRC No: PTR No: REVIEWED BY:

SITE ADDRESS: NO. 167 INDANG-TRECE MARITES ROAD, INDANG, CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120°53'8.01" LATITUDE: 14°11'44.44'' PLACE ISSUE: DATE APPROVED:
CONCRETE CEILING

AR
EB
GL L
AN S TA
25mmØ DRAIN LINE TAP TO DE
PE
NEAREST DRAIN CONNECTION

mm
600

±1.75m.

±2.05m.
P-TRAP

5TR FCU 1 & 2 MOUNTING DETAILS


FFL ±0.6m

STACU 1 & 2 MOUNTING DETAILS


ACCU 5TR
936mm x 336mm x 722mm
1.0m.

ACCU 1 & 2 MOUNTING DETAILS

PLDT INDANG
1 FCU & ACCU MOUNTING DETAILS
ME-13

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 2x5TR
PROJECT DESCRIPTION: FCU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
FCU & ACCU MOUNTING DETAILS
ME-13
CORPORATION
SITE NAME: PLDT INDANG PRC No: PTR No: REVIEWED BY:

SITE ADDRESS: NO. 167 INDANG-TRECE MARITES ROAD, INDANG, CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120°53'8.01" LATITUDE: 14°11'44.44'' PLACE ISSUE: DATE APPROVED:
DRAIN PIPE DETAILS PIPE SUPPORT DETAILS PIPE HANGER DETAILS
NOT TO SCALE NOT TO SCALE NOT TO SCALE

PIPE INSTALLATION DETAILS TYPICAL PIPE THRU WALL DETAIL


NOT TO SCALE NOT TO SCALE

PLDT INDANG
1 MISCELLANEOUS DETAILS
ME-14

CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: SHEET CONTENT: SHEET NO.
SUPPLY AND INSTALLATION 0F 2x5TR
PROJECT DESCRIPTION: FCU AND AC UPGRADE PROFESSIONAL MECHANICAL ENGINEER CHECKED BY:
MISCELLANEOUS DETAILS
ME-14
CORPORATION
SITE NAME: PLDT INDANG PRC No: PTR No: REVIEWED BY:

SITE ADDRESS: NO. 167 INDANG-TRECE MARITES ROAD, INDANG, CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: ME-14
LONGITUDE: 120°53'8.01" LATITUDE: 14°11'44.44'' PLACE ISSUE: DATE APPROVED: