Professional Documents
Culture Documents
PACU PACU
LP 14
DCPDB 1 DCPDB 2
ELP 14
EE ROOM
CR CR
EPP
ODF
ODF MDF (COPPER)
3435
BUSBAR
(WORKING)
5TR WACU
Exhaust Fan
PCM ROOM
SS 1 BANK
SS 1 BANK
DAY
2V 300 Ah SS 4 BANK TANK
12V 130 Ah 2V 300 Ah HUAWEI FIBERHOME
DASHUCU DCPDB OLT
PASFEOL ODF
001
BATTERY ROOM
ACCU
ALCATEL
(WORKING)
5TR WACU
SACREDSON RACK RACK
DCPDB 4 PANKS
12V100ah
No Battery
No Battery HUAWEI HUAWEI 125
K
GEN VA
FCU NG)
SET 2191
DECTU
RECTI
NOT
ECB
ACCU
WORKING
PR-B
3200
PR 2A
MTS
MDT
MTS
5TR
PANTRY
ACCU
FCU
(WORKING) ATS
PR-
2
001
DSHUAG
HT
WORKING
PRB
NOT
OLT
WORKING
PROPOSED TO DEMOLISH
NOT
OLT
PARTITION WALL
ACCU
MDF
8116
MAIN OFFICE
002
DASHUCU
HUAWEI
MDF
HUCS
HUAWEI
001
DCPDB
RECTI
ACBEL
PROPOSED FOR RENOVATION
MDF
MDF ROOM
400
SWITCHING
5TR
FCU
ROOM
(WORKING)
CCTV
COMPUTER
ROOM
G.H
4509
FACP
ENTRANCE
2 x 100 KVA
PLDT DASMARIÑAS
EXISTING SITE DEVELOPMENT PLAN
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: TRANSFORMER AND GENSET UPGRADE PROFESSIONAL CIVIL ENGINEER CHECKED BY: CE-01
GENERAL NOTES, VICINITY MAP &
EXISTING SITE DEVELOPMENT PLAN
CORPORATION
SITE NAME: PLDT DASMARIÑAS PRC No: PTR No: REVIEWED BY:
SITE ADDRESS: DASMARIÑAS CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: CE-11
LONGITUDE: 14°20'2.33" LATITUDE: 121°56'22.92" PLACE ISSUE: DATE APPROVED: 1 :280 .
4450 3370 2848 3130 4450 2423 6312
1710
1100
OPEN TYPE GENSET
PROPOSED 300KW
590 1710 1400
4150
1100 500
300
PROPOSED 300KW
OP
FU OSED 600
EL
TA 500L
3910 NK MAN
U PU AL
3300 MP
FP
30A
2P T.
EC
B
9716
ELP GB
P
3910
495
1000
3550
3150
PR
2500
PROP. MDP PROP. ATS-1 PROP. ATS-2
OP
PROP. OS
1795
SWITCHBOARD ED
ST F
895 OR UEL 5000L
AG
ET
2700
AN
PROP.
K 1500
1900
MOBILE BOX
PACU PACU
LP 14
EE ROOM
DCPDB 1 DCPDB 2
ELP 14
PROPOSED PULL BOX
(500X500X500)
PROPOSED PROPOSED PROPOSED CR CR
MTS-2 MTS-1 EMDP EPP
ODF
ODF MDF (COPPER)
400 3435
BUSBAR
(WORKING)
5TR WACU
800 800 800
Exhaust Fan
PCM ROOM
SS 1 BANK
SS 1 BANK
DAY
2V 300 Ah SS 4 BANK TANK
12V 130 Ah 2V 300 Ah HUAWEI FIBERHOME
DASHUCU DCPDB OLT
PASFEOL ODF
001
BATTERY ROOM
ACCU
960
NEMA 1 ECB
PROP.
20AT, 230V, 3P
368 STACU 1
(WORKING)
5TR WACU
PROPOSED
7.5TR SACREDSON RACK
TNT ACU PANEL RACK
NEMA 4X PROPOSED 4 PANKS
12V100ah
No Battery No Battery HUAWEI HUAWEI 125
TNT PR PANEL
K
GEN VA
FCU NG)
50AT, 230V, 3P
NEMA 4X ECB
960 SET 2191
NEMA 1 ECB
PROP.
20AT, 230V, 3P
PROP. 7.5TR
ECB
368 STACU 2
ACCU
7.5TR
PR-B
ACCU 2
3200
1200
RELOCATED
MTS
MDT
PROPOSED
MTS
DCPDB
MDF
PANTRY
ACCU
600
PROP. ELVSG - TIE
50AT, 230V, 3P
NEMA 4X ECB
ATS
PROP. 7.5TR
PROP.
CISCO LOT 2 600
ACCU 2
ASR 9910
PROP.
CISCO LOT 2 600
HT
001
DSHUAG
3000
ASR 9910 PROPOSED PULL BOX
50AT, 230V, 3P
(500X500X500)
NEMA 4X ECB PROP.
CISCO LOT 1 600
003
DSHUAG FIBERHOME FIBERHOME
HT
PROP. 7.5TR
PROP.
RECTIFIER SYSTEM
OLT
PROPOSED 2000A
OLT
600 1200
ODF
900
ACCU
150
600
MDF
FUTURE
EQUIPMENT
400
8116
400
600
MAIN OFFICE
DASHUCU HUCS
HUAWEI
002
FUTURE
EQUIPMENT 400
FUTURE
EQUIPMENT
HUAWEI
001
DCPDB
FUTURE
EQUIPMENT PROP. MAIN
FUTURE CIRCUIT BREAKER
EQUIPMENT
1000AT NEMA4X
RECTI
ACBEL
FUTURE
EQUIPMENT
FUTURE
EQUIPMENT
FUTURE
EQUIPMENT
FUTURE
EQUIPMENT
20AT, 230V, 3P
NEMA 1 ECB
PROP.
STACU 3 368
7.5TR
960
G.H
FUTURE PROPOSED PROPOSED PROPOSED
BATTERY 1000AH 1000AH 1000AH
BANK BATTERY BATTERY BATTERY
4509
FACP
SCHEDULE OF FINISHES
ENTRANCE
ROOF SLAB HYDROFLEX BITUMEN MEMBRANE BLACK SUBMIT SAMPLE FOR APPROVAL BOYSEN, DUTCH BOY OR APPROVED EQUAL
2 x 100 KVA
PLDT DASMARIÑAS
PROPOSE SITE DEVELOPMENT PLAN
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: TRANSFORMER AND GENSET UPGRADE PROFESSIONAL CIVIL ENGINEER CHECKED BY: CE-02
PROPOSE SITE DEVELOPMENT PLAN
CONTRACTOR'S SCOPE OF WORK
CORPORATION
SITE NAME: PLDT DASMARIÑAS PRC No: PTR No: REVIEWED BY:
SITE ADDRESS: DASMARIÑAS CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: CE-11
LONGITUDE: 14°20'2.33" LATITUDE: 121°56'22.92" PLACE ISSUE: DATE APPROVED: 1 :280 .
ISOMETRIC VIEW
NOT TO SCALE
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: TRANSFORMER AND GENSET UPGRADE PROFESSIONAL CIVIL ENGINEER CHECKED BY: CE-03
ISOMETRIC VIEW
DESIGN NOTES
CORPORATION
SITE NAME: PLDT DASMARIÑAS PRC No: PTR No: REVIEWED BY:
SITE ADDRESS: DASMARIÑAS CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: CE-11
LONGITUDE: 14°20'2.33" LATITUDE: 121°56'22.92" PLACE ISSUE: DATE APPROVED: N.T.S. .
A' B' D' A' B' D'
1' 633
6 1' 633
6
119 119
30 30
1710
2%
1100
SL
4675
4675
OPEN TYPE GENSET
OP
PROPOSED 300KW
1400
E
590 1710
559 DD 559
1100 500 4 4
300
OPEN TYPE GENSET
3300 PR
OP
PROPOSED 300KW
FU OSED 600
EL
TA 500L
NK MA
7700
7700
3910 NU
PU AL
MP 30
3300 FP 2P AT.
EC
B
2%
ELP GB
P
SL
1" 1"
OP
3910
E
1000 1000 1000 2000
DD
595
1000
0.125M. THICK CONCRETE ROOF DECK WITH
SAHARA WATERPROOFING IN CONCRETE MIXTURES E
OP
SL
3025
3025
2%
2850
2850
PROP. MDP PROP. ATS-1 PROP. ATS-2 PROP.
1700
SWITCHBOARD 2%
OPE OP
E
SL
SL SL
800
OP WALL LINE BELOW
2% 2% E
2700
1"' PROP.
MOBILE BOX 1"' DD DD DD
10900 10900
ROOF LINE
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: TRANSFORMER AND GENSET UPGRADE PROFESSIONAL CIVIL ENGINEER CHECKED BY: CE-04
PROPOSE FLOOR PLAN
ROOF DECK PLAN
CORPORATION
SITE NAME: PLDT DASMARIÑAS PRC No: PTR No: REVIEWED BY:
SITE ADDRESS: DASMARIÑAS CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: CE-11
LONGITUDE: 14°20'2.33" LATITUDE: 121°56'22.92" PLACE ISSUE: DATE APPROVED: 1:100 .
A' B' D' D' B' A'
10900 11930
900
900
600 1700 430 1700 600
800
1200 850 2700
600
600
2500
2500
2800
2800
700
300
200
200
FRONT ELEVATION REAR ELEVATION
SCALE: 1:100MTS SCALE: 1:100MTS
900
4000
4200
200
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: TRANSFORMER AND GENSET UPGRADE PROFESSIONAL CIVIL ENGINEER CHECKED BY: CE-05
ELEVATION VIEW
CORPORATION
SITE NAME: PLDT DASMARIÑAS PRC No: PTR No: REVIEWED BY:
SITE ADDRESS: DASMARIÑAS CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: CE-11
LONGITUDE: 14°20'2.33" LATITUDE: 121°56'22.92" PLACE ISSUE: DATE APPROVED: 1:100 .
A' B' D' A' B' D'
C-1/F-2
1' 633
6 1' 633
6
119 119
WF 30 30
-1
RB
-1
C-1/F-1
GENSET FOUNDATION
RB-3
WF-1
4675
4675
559 559
4 4
GENSET FOUNDATION
WF
RB-2
-1 RB
-1
7700
7700
C-1/F-1
C-1/F-1
C-1/F-2
1" 1" RB-2
RB-4
RB-2
WF-1
RB-3
RB-3
WF-1
3025
3025
2850
2850
150mm THK SLAB ON FILL
12mm D.S.B. @ 300 O.C.B.W
RB-4
RB-4
RB-4
WF-1 WF-1
C-1/F-2 C-1/F-1 C-1/F-1
10900 10900
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: TRANSFORMER AND GENSET UPGRADE PROFESSIONAL CIVIL ENGINEER CHECKED BY: CE-06
FOUNDATION PLAN
ROOF FRAMING PLAN
CORPORATION
SITE NAME: PLDT DASMARIÑAS PRC No: PTR No: REVIEWED BY:
SITE ADDRESS: DASMARIÑAS CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: CE-11
LONGITUDE: 14°20'2.33" LATITUDE: 121°56'22.92" PLACE ISSUE: DATE APPROVED: 1:100 .
100mm CHB
75
900
4.5 kg/sqm. BITUMEN WATER
PROOFING MEMBRANE FLOOR TOPPING
T.O.S +4.125m
125
SLAB REINFORCEMENT(SEE PLAN)
400
RB-1 (SEE SCHEDULE)
100 700
800
COLUMN LINE
150mm CMW
1 SECTION DETAIL
CE 07 1:125
TOP STEEL AT MID SPAN TOP STEEL CURTAILED BARS TOP STEEL AT MID SPAN
L1/3 L1/3 L2/3
L2/3 L3/3
TOP STEEL AT SUPPORT TOP STEEL AT SUPPORT
CONTINUOUS REINFORCEMENT
CONTINUOUS REINFORCEMENT
137449(TYP.)
SPAN L1 SPAN L2
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: TRANSFORMER AND GENSET UPGRADE PROFESSIONAL CIVIL ENGINEER CHECKED BY: CE-07
SECTION DETAILS
SCHEDULE AND DETAILS OF BEAM
CORPORATION
SITE NAME: PLDT DASMARIÑAS PRC No: PTR No: REVIEWED BY:
SITE ADDRESS: DASMARIÑAS CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: CE-11
LONGITUDE: 14°20'2.33" LATITUDE: 121°56'22.92" PLACE ISSUE: DATE APPROVED: 1:125 .
SCHEDULE OF COLUMN
10mm∅ LATERAL TIES 10mm∅ LATERAL TIES
C1
4.8 m ROOF DECK
300
150
150
12mm D.S.B. @ 300 O.C.B.W
FFL 0.6m FFL 10mm D.S.B. @ 300 O.C.B.W
300
0.6m
500
500
300
NGL. 16mm∅ VERTICAL BARS 0.0m NGL. 16mm∅ VERTICAL BARS 0.0m
400
400
300
300
300
WALL FOOTING (SEE DETAIL) WALL FOOTING (SEE DETAIL)
Starter bars 8#16
200
200
-0.9m -0.9m
300
150mm THK. CHB W/Ø10mmVERT.
300
BARS @ 0.80m
& 10mmØ HORZ.BAR 8-16mmØ BARS B.W.O.C.
8-16mmØ BARS B.W.O.C. 1200
@ EVERY 3 LAYERS OF CHB TOP & BOTTOM
NGL. 0.0m
1200
300 900
450 300 450
VARIES
450
450
250mm
8 - 16mm∅ BAR - B2
8 - 16mm∅ BAR - B2
1200
300
1200
300
3-12mmØ BARS
10mmØ TEMP. BARS
@ 300mm O.C. 8 - 16mm∅ BAR - B1
500 8 - 16mm∅ BAR - B1
450
450
PROVIDE 50mm THK. WELL-
COMPACTED GRAVEL FILL
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: TRANSFORMER AND GENSET UPGRADE PROFESSIONAL CIVIL ENGINEER CHECKED BY: CE-08
WALL FOOTING DETAILS
SCHEDULE AND DETAILS OF COLUMN
CORPORATION
SITE NAME: PLDT DASMARIÑAS PRC No: PTR No: REVIEWED BY:
SITE ADDRESS: DASMARIÑAS CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: CE-11
LONGITUDE: 14°20'2.33" LATITUDE: 121°56'22.92" PLACE ISSUE: DATE APPROVED: 1:125 .
TEMPERATURE BARS
BEAM BEAM
CONTINOUS BARS
CONTINOUS BARS
EXTRA BOTTOM BARS EXTRA BOTTOM BARS
BEAM
BEAM
BEAM
BEAM BEAM
PLAN PLAN
TOP BARS EXTRA BOTTOM BARS TOP BARS EXTRA BOTTOM BARS TEMPERATURE BARS
(t)
(t)
CONTINOUS BARS CONTINOUS BARS
BEAM L/5 L/5
BEAM BEAM L/5 L/5
BEAM
L/4 L/4 L/4 L/4
L L
CROSS-SECTION CROSS-SECTION
TWO-WAY ONE-WAY
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: TRANSFORMER AND GENSET UPGRADE PROFESSIONAL CIVIL ENGINEER CHECKED BY: CE-09
SCHEDULE AND DETAILS OF SLAB
CORPORATION
SITE NAME: PLDT DASMARIÑAS PRC No: PTR No: REVIEWED BY:
SITE ADDRESS: DASMARIÑAS CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: CE-11
LONGITUDE: 14°20'2.33" LATITUDE: 121°56'22.92" PLACE ISSUE: DATE APPROVED: N.T.S. .
3910
2.45m
Fuel Tank
1710
0.90M
0.60m
F.G.L.
0.40M
0.50M
600 SCALE 2910 600
16MM DIA. DIAGONAL BAR @
0.20M O.C. AT CORNERS 0.50MM THK BOULDERS 16MM DIA. INTERIOR & EXTERIOR BARS @0.20M.O.C.E.W.
LONGITUDINAL ELEVATION
50x50x3mm THK.
16mmØ TOP & BOTTOM BARS ANGLE BAR
SPACED @ 150mm O.C. E.W. SCREWED AROUND
500 450 2010 450 500 THE EDGES 1.30m
FLOOR SLAB
200
PLAIN CEMENT
100
3.55m
PLASTERED PAINTED FINISH
50mm THK.
Fuel Tank
1000
0.40M
PROP. 0.90 M. HIGH BUND WALLS
0.50M
100mm THK.
GRAVEL BEDDING ON
600 450 2010 450 600 WELL-COMPACTED SOIL PLAN 0.50MM THK BOULDERS
16MM DIA. INTERIOR & EXTERIOR BARS @0.20M.O.C.E.W.
1.90 M.
4110
GENSET FOUNDATION
2 LONGITUDINAL SECTION ELEVATION 3 PROPOSE FUEL TANK CONTAINMENT
SCALE NTS
SCALE NTS
CE-10
CE-10
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: TRANSFORMER AND GENSET UPGRADE PROFESSIONAL CIVIL ENGINEER CHECKED BY: CE-10
GENSET FOUNDATION DETAILS
FUEL TANK CONTAINMENT DETAILS
CORPORATION
SITE NAME: PLDT DASMARIÑAS PRC No: PTR No: REVIEWED BY:
SITE ADDRESS: DASMARIÑAS CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: CE-11
LONGITUDE: 14°20'2.33" LATITUDE: 121°56'22.92" PLACE ISSUE: DATE APPROVED: N.T.S. .
75mm
25mm
2700 2700
100mm
1700 CHB WALL
45°
25mm
BARREL BOLT
CHB WALL
GA # 14 2" x 4"
GA # 16 PLAN TUBULAR FRAME
HOT AIRFLOW ALL AROUND
SHEET
LOUVER
2500
2800
2800
BLADES
INSIDE GENSET
ROOM
GA # 14 2" x 4"
TUBULAR FRAME
REQ: 2-SETS
LOUVERED WINDOW CROSS
D-1 GENSET ROOM
SCHEDULE OF LOUVER SECTIONAL DETAIL
DESIGNATION:DOOR 1
SCALE: NTS SCALE: NTS
DESCRIPTION: FRAME; 1.2MM ALUMINUM SHEET BLADE; DOUBLE SKIN BLADE TYPE W/
OUTER FACE 0.7MM ALUMINUM SHEET AND INNER PERFORATED
FACE 0.9MM GALVANIZE STEEL SHEET ACOUSTIC FILL AND MILL
FINISH
REQ: 1 SET
SCHEDULE OF DOOR
SCALE: NTS
B B
0.10
125
A A
16MM HANDHOLE
HANDLE
0.60 M
0.10
0.40
L=0.60M
W=0.60M
CATCH BASIN DETAIL (CB) SECTIONAL DETAIL PLAN ISOMETRIC VIEW OF MAN LADDER ELEVATION OF MAN LADDER
NOT TO SCALE NOT TO SCALE SCALE: NTS SCALE: NTS
CONTRACTOR: OPERATOR: PROJECT NAME: TNT PROJECT PHASE 2 DRAWN BY: JEHAN ENGINEERING TEAM SHEET CONTENT: SHEET NO.
PROJECT DESCRIPTION: TRANSFORMER AND GENSET UPGRADE PROFESSIONAL CIVIL ENGINEER CHECKED BY: CE-11
SCHEDULE OF LOUVER DOOR AND WINDOW
CATCH BASIN DETAILS, DRAIN PIPE DETAILS
CORPORATION
SITE NAME: PLDT DASMARIÑAS PRC No: PTR No: REVIEWED BY:
MAN LADDER DETAILS
SITE ADDRESS: DASMARIÑAS CAVITE DATE ISSUE: TIN: DATE SUBMITTED: APPROVED BY:
SCALE: REVISION NUMBER.: CE-11
LONGITUDE: 14°20'2.33" LATITUDE: 121°56'22.92" PLACE ISSUE: DATE APPROVED: N.T.S. .