▪ Delivery time: 14 weeks after the advance payment is confirmed
▪ Price terms: EXW Suzhou
▪ Payment term: 30% down payment in advance, 70% before delivery
▪ Valid until: 25-Oct-2021
Appendices:
▪ Appendix 01: Equipment List
▪ Appendix 03: Operating Expense (OPEX) Report
▪ Appendix 04: Process Flow Diagram (PFD)
Notes:
No 1, for raw water turbidity higher than 40 NTU, or raw water with oil and grease, QT recommends (and could provide) extra
1) pre-treatment solutions like clarifiers, Dissolved Air Flotation (DAF), etc. QT could provide customized extra post-treatment
solution (such as mineralization, 2nd pass RO, EDI, etc.) for higher product water requirement, contact us for more details.
No 1.1 , QT provide 10 times use (normally for 1 year usage) of elements for Pre-filter (10 microns nominal) and Main-filter (5
2)
microns absolute), and 2 times use of elements for CIP-filter (20 microns nominal). Worse feed may cause extra use.
No 1.2, Insulation kit is applied for areas with temperatures higher than 35°C or lower than 5°C. Insulation kit is also
3)
recommended for locations with long-time direct sunshine or with poor ventilation.
No 2, QT could provide solutions for raw water intake. This price is a roughly budget price, actual price depend on site
4)
investigation/user providing.
No 3, the capacity of feed tank is more than feed flow x 1 hour. When the quality of raw water varies enormously or raw water is
5)
taken in limited time, the capacity must be increased accordingly.
6) No 4, the capacity of product tank depends on actual conditions such as water supply peak, power supply, etc.
No 8, QT services generally include: installation guidance, commissioning, training and after sales service. QT service cost is based
7)
on unit: per person per day.
Appendix 01: Equipment List for 1 set of C2000E, 10000m3/day will use 5sets C2000E
7 Anti-scalant dosing Liquid (100%), to prevent scaling on membrane 4065.6 kg 7.2 29,272.32
8 NaOH Solid (98%), to clean the membrane 9.4 kg 0.3 2.83
9 Citrin acid Solid (99%), to clean the membrane 560.0 kg 0.7 392.00
III. Maintenance
Membrane
10 Assume: Replace all membrane in 3 years 0.25 set 116640 29,160.00
replacement 3)
Assume: Filter elements replacement in 1 year,
11 Consumables 10 times usage for Pre-filter and Main filter, 2 1 set 7485.481 7,485.48
times usage for CIP filter
12 Maintenance Repair, membrane cleaning, repainting, etc. 1 lot 29704.6 29,704.62
IV. Labour
13 Operator 4) Local maintenance personnel 1.0 person 10,000 10,000.00
Note:
1) Different countries have different electricity prices. Sometimes in the same country there are even differences between
regions. The above estimates are therefore for reference only.
2) The consumption of chemicals is for reference only. Actual consumption will depend on actual operating conditions.
3) The cost of replacing the membrane is based on the replacement of the entire membrane after an operating period of
3 years.
4) QT provide remote monitoring and control system to lower the requirement of operator. Thus, 1 operator could be
hired on a full-time basis for the daily management of the unit.
Appendix 04: Process Flow Diagram (PFD)
Note: This is typical process of fastRO C. If detailed P&ID is required, please contact us.