Summary of Presenter
Name : YAN ADRIANSYAH
Education : Doctoral Degree
(Engineering Geology – Padjadjaran
UNIVERSITY)
WORK EXPERIENCES:
1997 – 2001 Worked with various geotechnical consultant (well site
geotech drilling), coal exploration, and civil-geotech project.
2001 – 2002 PT Kaltim Prima Coal (Geotech. Engineer)
2002 – 2006 PT Adaro Indonesia (Section Head Geotech. Section)
2006 – 2011 PT Arutmin Indonesia (Supt. Geotech. & Hydrogeological)
2011 – 2016 PT Newmont Nusa Tenggara (Supt. Geotech &
Hydrogeological
2016 – 2017 PT Amman Mineral Nusa Tenggara (Supt. Geotechnical &
Hydrogeological)
2018 – Now PT Berau Coal (Manager Geotechnical & Hydrology)
Professional ORGANIZATION:
IAGI, PERHAPI, ISRM, PII & MGTI
2010 – 2012 Chairman of IAGI Pengda Kalimantan
2018 – 2021 Committee of MGTI – Head of Professional Development
2021 – 2023 General Secretary of MGTI
OUTLINE
Of the Presentation:
Geotechnical Philosophy in
Open Pit Mine Operation
Objective of Mine Geotechnical
Geotech Data Acquisition
Geotech Analysis
Monitoring Program
Conclusion
GEOTECH Philosophy
Key Notes.....of Pit Design Philosophy
Acceptance FoS (Price & Brown, 1982 dalam Stacey & Read, 2009)
OBJECTIVE Of Geotech
Objective atau Goal dalam setiap perancangan design
geoteknik (pit slope design), adalah:
TETAPI..............
Modifikasi dari
Stacey & Read, 2009
0.03
1.306
30
20
10
0
-10 1
W 33
-20
-30
-40
50 -50
-60
Kennedy, 1990 600 650 700 750
DATA Acquisition
How the data lead the
Bore Hole Nos. GT-1 Geotech analysis
Pit Design (High Wall & Low Wall)
Potential
LW-Overall
Slope
FAILURE
Critical
Loose sand or Aspect 1.050
unconsolidated material
DATA Acquisition
Phase-X
Vertical Distribution Development
Notes:
o Memenuhi kebutuhan analisis
geoteknik hingga final pit floor
/ultimate pit floor (LoM).
First cut or Phase-1
o Uji laboratorium batuan intact
mewakili interval kedalaman
Assume Final Pit or
dan/atau variasi lithologi. Ultimate PitFloor
o Identifikasi bidang-bidang
diskontinuitas (Ore Mine :
fold/fault/joint, bedding
contact, shear zone; Coal Mine
: soft layer/XM, bedding
shear).
Vaccaro, 2014
DATA Acquisition
Lateral Distribution
Bor-06
Bor-03
Bor-07
Bor-05
Bor-02
Bor-01
Bor-04
INTER-RAMP SLOPE:
o Joint/minor/intermediate fault orientation & dipping
o Use peak strength from laboratory test result to define the
stability of slope geometry.
o Type of slope failure was assumed depend on lithology and
geological structure.
o The PoF was assumed around 5%.
OVERALL SLOPE:
o Joint/minor/intermediate /major fault orientation &
dipping
o Use peak strength from laboratory test result to define the
stability of slope geometry.
o Type of slope failure was assumed depend on litology and
geological structure.
o The PoF was assumed in between 3 % - 5 % or less than 3%.
GEOTECHNICAL Analysis
Lesson learn from Current Practice – Coal Optimization Project at
the toe of Undisturbed Area/IPD
status.
260.00
260.00kN/m2
kN/m2
W 81.00
81.00kN/m2
kN/m2 100
75 75
50 50
25 25
0
1 0
-25 -25 4
W
-50 -50
-75 -75
-100 -100
-125 -125
100 200 300 400 500 600 700 800 900 1000 1100 1200 1300
MONITORING Program
Objective of pit slope movement monitoring
program (Stacey & Read, 2006)
Pendekatan:
o TACTICAL Monitoring
(Bench & Inter-ramp Scale)
o STRATEGIC Monitoring
(Inter-ramp & Overall Scale).
MONITORING Program
Implement Pit Slope Monitoring Program at
Coal Mine (Inpit Dumping)
Graph of Inverse
Velocity
Conclusion
Geotechnical aspects in INDONESIA is very unique due to complex geological structure,
young rock formation (mostly from Eo-Mio to Mio-Plio), excessive rain fall (tropical of
tropical country), and close to the tectonic active plate/zone.
Geotechnical uncertainty due to limitation of data (interval and depth), internal (rock
mass, structure, GWL, etc.) & external (mine operation, blasting, etc.) factor that
possible to initiate the pit wall failure.
Mine geotechnical aspect is quite increase significantly over the last 2 decades period,
particularly in Mining Operation. The main causes as follows:
o Increasing accident that caused by pit wall instability.
o Pit going to deep and width, increasing of risk and slope deterioration .
o Comply to government regulation.
o Design change; pit optimization, fluctuation of coal/ore price, change the
ownership, etc.