PURPOSE To exercise control over the preparation, review, approval, issue & amendment of the
Quality Plan.
SCOPE : This procedure shall be applicable to the Quality Plans related to Projects.
START
2 Quality
Plan
1000 GF 01 009
3 REVIEW QUALITY PLAN (RO) Checklist for
Quality Plan
5 ISSUE OF QP TO SITE
IS ANY MODIFICATION N
REQUIRED
END
1000 GP 01 001 7 Y
Document Control PROPOSE AMENDMENT & APPROVAL (RO)
Procedure
END
APPLICABLE /
SL. NO. ACTIVITY PROCEDURE NOT ACCEPTANCE CRITERIA VERIFYING DOCUMENT
APPLICABLE
10 RECEIPT OF LOI / W.O 1000 GP 02 001 A RECEIVE THE ACCEPTED AGREEMENT LETTER OF INTENT/WORK ORDER/AGREEMENT
EVALUATION & SELECTION OF SUB- AS PER THE GUIDELINES MENTIONED IN WORK ORDER , MONTHLY SUB CONTRACTOR
50 GP 04 003 A
CONTRACTOR PROCEDURE. EVALUATION FORM
APPLICABLE /
SL. NO. ACTIVITY PROCEDURE NOT ACCEPTANCE CRITERIA VERIFYING DOCUMENT
APPLICABLE
APPLICABLE /
SL. NO. ACTIVITY PROCEDURE NOT ACCEPTANCE CRITERIA VERIFYING DOCUMENT
APPLICABLE
COMPLETENESS OF SPECIFICATION,
VERIFICATION OF SUB CONTRACTOR WORK ORDER ,AGREEMENT WITH
160 CP 03001 A AVAILABILITY OF MATERIAL , CONDITION OF
PURCHASED MATERIALS SUBCONTRACTOR,CHALLANS OF MATERIALS
MATERIAL
GP 04 047, GP 04 017,
220A SITE GRADING/EXCAVATION IN ROCK IN SOIL A LEVEL,STRATA,SIZE OF EXCAVATION CHECK LIST ( GF 04 045,017,018 )
GP 04 035
APPLICABLE /
SL. NO. ACTIVITY PROCEDURE NOT ACCEPTANCE CRITERIA VERIFYING DOCUMENT
APPLICABLE
220H REINFORCEMENT WORK GP 04 020 A BAR DIA. , DIMENSION , SPACING , COVER Etc. CHECK LIST ( GF 04 021 )
220N PLASTERING WORKS GP 04 026 A LINE, LEVEL, SURFACE FINISH, PLUMB etc. CHECK LIST ( GF 04 028 )
220O WATER PROOFING WORKS GP 04 022 A WATER TIGHTNESS , SLOPE Etc. CHECK LIST ( GF 04 023 )
PATTERN, LEVEL, ALIGNMENT, JOINTS, MIX CHECK LIST ( GF 04 040 & 041 )
220P FLOORING, TILING & DADO WORKS GP 04 027,041,042 A
PROPORTION, MATERIALS , FINISHING ETC CHECK LIST ( GF 04 029 )
220Q FIXING OF DOORS & WINDOWS GP 04 028 A PLUMB , LEVEL, MATERIAL, FIXTURES ETC CHECK LIST ( GF 04 030 )
220R FALSE CEILING WORKS GP 04 034 A MATERIAL , LINE , LEVEL , WORKMANSHIP ETC CHECK LIST ( GF 04 036 )
APPLICABLE /
SL. NO. ACTIVITY PROCEDURE NOT ACCEPTANCE CRITERIA VERIFYING DOCUMENT
APPLICABLE
220R ROOFING AND CLADDING WORKS GP 04 033 A WATER TIGHTNESS , SLOPE Etc. CHECK LIST ( GF 04 034)
PATERN,LINE,LEVEL,MATERIAL &
220S GLAZING WORKS CP04003 A CHECK LIST CF 04013
WORKMANSHIP ETC
MATERIAL,LAYOUT,LINE,LEVEL,WORKMANSHIP
220T PLUMBING AND SANITARY WORKS CP04004 A CHECK LIST CF 04004
ETC.
MATERIAL,LAYOUT,LINE,LEVEL, PRESSURE
220V FIRE FIGHTING WORKS CP04006 A CHECK LIST CF 04006
TESTING,WORKMANSHIP ETC.
220AD ROOFING AND CLADDING WORKS GP 04 033 A WATER TIGHTNESS , SLOPE Etc. CHECK LIST ( GF 04 034)
APPLICABLE /
SL. NO. ACTIVITY PROCEDURE NOT ACCEPTANCE CRITERIA VERIFYING DOCUMENT
APPLICABLE
1000 GP 10 001 AS PER THE GUIDELINES MENTIONED IN CASH FLOW , FORECAST STATEMENT , SUNDRY
260 PROCEDURE FOR FINANCE & MONITORING A
1000 GP 10 002 PROCEDURE. DEBTORS SCHEDULE
VENDOR SELECTION, PRE-QUALIFICATION AS PER THE GUIDELINES MENTIONED IN PRE QUALIFICATION FORM, VENDOR CAPABILITY
270 1000 GP 07 003 A
APPROVAL & EVALUATION PROCEDURE. ANALYSIS, APPROVED VENDOR LIST
APPLICABLE /
SL. NO. ACTIVITY PROCEDURE NOT ACCEPTANCE CRITERIA VERIFYING DOCUMENT
APPLICABLE
410 FINAL CHECK & HAND OVER CP04012 A AS PER CONTRACT COMPLETION CERTIFICATE
NOTE :- RESPONSIBILITY AND AUTHORITY DURING DIFFERENT PHASE OF THE PROJECTS IS GIVEN IN PROCEDURE AS REFERRED TO THE QUALITY PLAN AGAINST EACH ACTIVITY.
2 Is the Document codification proper for Site Code & Nature of Document ?
Is the cover page as per Model Quality Plan, Signed / Reviewed / Approved by the respective
3
authorities ?
4 Are all the details of the project mentioned ?
5 Does the flow chart mention all the processes involved in the project ?
6 Is the acceptance criteria mentioned for all the procedures ?
7 Are all the verifying documents mentioned for all the procedures ?
Remarks : - __________________________________________________________________________________
____________________________________________________________________________________________
PROJECT PLAN IN
20 DOCUMENT CONTROL PROCEDURE 70
DETAILS
ORGNISATION, RESPONSIBILITY,
INTERNAL QUALITY AUDIT 80
AUTHORITY 30
EVALUATION OF
40A
VENDOR
SELECTION OF
40C
VENDOR
CUSTOMER SUPPLIED
150 CORRECTIVE & PREVENTIVE ACTION 210
MATERIALS
INCOMING MATERIAL
160 DRAWINGS CONTROL 220
INSPECTION
CONCRETING WORKS-
CONTROLLED ,SELF
190G PROCEDURE FOR CORPORATE SHUTTERING 310
COMPACTION & ARCHITECTURAL
CONCRETE
STRUCTURAL STEEL
190J PURCHASE OF PMV 330
FABRICATION
STRUCTURE STEEL
190K PURCHASE OF SPARES FOR PMV 340
ERECTION
MASONRY 190L
PLASTERING 190M
TILING AND DADO 190N DISPOSAL & MAJOR REPAIRS OF PMV 360
WATERPROOFING 190Q
PROCEDURE FOR FINANCE & MONITORING IN
370
CONTRACT / PROJECT SITES
ROOFING &
190R
CLADDING
ELECTRICAL
190S
WORKS
WATER BODY
190V
WORKS
390
BUSINESS
WBM ROAD / ASPHALT DEVELOPMENT
ROAD WORK 190X (RO)
VACUUM
DEWATERED 190Y
FLOORING
GRANOLITHIC
190Z
FLOORING
POLYCARBONATE
190AA
SHEET WORKS
STRUCTURAL 190AE
GLAZING WORKS
WOODWORKS 190AF
EXPANSION JOINT
TREATMENT 190AG
WORKS
KERB STONE
WORKS 190AI
INT.BUILDING
MANAGEMENT SYSTEM
190AJ
PROCEDURES
FOR
410
INTERNATIONAL
ELEVATORS OPERATIONS
190AN
FLASHING 190AO
REPAIRS AND
190AQ
RECTIFICATION
MAINTENANCE FOR
AGREED PERIOD 460
Note : Activities indicated above are not necessarily in a sequential order. Certain activities such as Calibration of test equipment,
Complaint handling, Corrective Preventive action, Document and data control, Inspection & testing, Internal quality audit
a Scratches
b Twist
c Bend
d Angularity
e Colour
f Hardness
g Dent
h Expiry Date
Check for Test Report for Alloy and Mechanical
8
Properties is attached
a Alloy test report
b Mechanical Properties test report
c Check for Manutfactures accredation.
Remarks -
Checked By SAP Glazing CONSULTANT CLIENT
Name
Sign
Date
3
Check for cutting of profiles (size) done as per
Drawings
7
Check for welding is done as per specification &
drwg.
Remarks -
Checked By SAP Glazing CONSULTANT CLIENT
Name
Sign
Date
3
Check whether the Anchor fasteners are fixed with
the minimum required edge distance as per drwg.
10
Check whether the brackets are fixed as per
approved drawing spacing.
Remarks -
Checked By SAP Glazing CONSULTANT CLIENT
Name
Sign
Date
NAME OF THE PROJECT
Al Hambra
Remarks -
Checked By SAP Glazing CONSULTANT CLIENT
Name
Sign
Date
Remarks -
Remarks -
Checked By SAP Glazing CONSULTANT CLIENT
Name
Sign
Date
NAME OF THE PROJECT
Al Hambra
Remarks -
Checked By SAP Glazing CONSULTANT CLIENT
Name
Sign
Date
1
Protection tape to cover visible area to be of 70
microns, tape to remain for 3 months.
2
Glass type to be checked with sample approved as
per Wall Types
Glass with flatness (Bow) as desired in vision and
3
spandrel, HS mark randomly
4
Check for Drainage provision in Gutter profile for size
of slots.
Check whether Silicon gaskets fixed to perimeter of
5
glass with silicon sealant.
6
Check whether all panel corner joints are applied
with sealant properly.(Small joint Sealant)
Check whether Glass to Glass Panel Groove is
7
15mm as per design with a wooden TOOL.
8
Check for any damages to panel. Twist and bends in
the profile.
Remarks -
Checked By SAP Glazing CONSULTANT CLIENT
Name
Sign
Date
8
Check whether the installed panel is approved by
client quality staff for installation.
Check for Stack joint to have proper sealing and
9 flashing cover and height from Floor Level as per
drw.
Remarks -
Checked By SAP Glazing CONSULTANT CLIENT
Name
Sign
Date
NAME OF THE PROJECT
Al Hambra
4
Visually inspect for any damages (chipping,
scratches etc)
Check for Manufacturers Test report for the following
5
is attached
a ALUMINIUM ALLOY - Each Coil
b MECHANICAL PROPERTIES - Each Coil
c SKIN THICKNESS - Each Coil
d COATING THICKNESS - Each Coil
e PVDF TEST - Each Coil
Remarks -
Checked By SAP Glazing CONSULTANT CLIENT
Name
Sign
Date
2
Check whether the Distance between brackets are as
per approved drawings.
5
Visually check for any damages or bending seen in the
panels ready to install.
6
Check whether the edge of ACP is properly folded as
per approved drawings. And free of corner stresses/
7
Check whether the ACP panel is installed as per
drawing in line level and plumb.
Remarks -
Checked By SAP Glazing CONSULTANT CLIENT
Name
Sign
Date
NAME OF THE PROJECT
Al Hambra
1 Type of Test______________________________
Remarks -
Checked By SAP Glazing CONSULTANT CLIENT
Name
Sign
Date
3
Checking for any damages on glass edges or chip
outs.
6
Checking for Scrathces or any coating damages on
profile and touch up.
8
Cleaning of Glasses with soft detergent and glass
powder.
Remarks -
Checked By SAP Glazing CONSULTANT CLIENT
Name
Sign
Date
Al Hambra
SAP Glazing NAME OF THE DOCUMENT :
2
Check whether proper Drainage slot is provided in
the Gutter Section
5
Check whether end cover is provided in the subcill at
final termination
7
Check whether the subcill is installed rigidly and in
water level.
Remarks -
Checked By SAP Glazing CONSULTANT CLIENT
Cum. Planned
Cum. Shuttering
Month Shutt. Qty per SUR
mtl recd at site
month
Sep-06 277.00 277.00 372.10 372.10 0.74
Oct-06 289.00 566.00 1,291.92 1,664.02 0.17
Nov-06 1,487.00 2,053.00 237.71 1,901.73 0.78
Dec-06 2,595.00 4,648.00 - 1,901.73 1.36
Jan-07 2,223.00 6,871.00 - 1,901.73 1.17
Feb-07 2,948.00 9,819.00 - 1,901.73 1.55
Mar-07 2,948.00 12,767.00 - 1,901.73 1.55
Apr-07 1,135.84 13,902.84 372.10 2,273.83 0.50
May-07 4,163.59 18,066.43 2,273.83 1.83
Jun-07 4,754.09 22,820.52 238.14 2,511.97 1.89
Jul-07 4,754.09 27,574.61 640.01 3,151.99 1.51
Aug-07 5,476.22 33,050.83 - 3,151.99 1.74
Sep-07 3,616.47 36,667.30 - 3,151.99 1.15
Oct-07 4,615.90 41,283.20 744.20 3,896.19 1.18
Nov-07 4,945.60 46,228.80 - 3,896.19 1.27
Dec-07 3,791.63 50,020.43 297.29 4,193.48 0.90
Jan-08 5,110.46 55,130.89 595.00 4,788.48 1.07
Feb-08 4,286.19 59,417.08 - 4,788.48 0.90
Mar-08 5,110.46 64,527.54 - 4,788.48 1.07
Apr-08 2,143.10 66,670.64 - 4,788.48 0.45
May-08 3,461.92 70,132.56 - 4,788.48 0.72
Jun-08 4,451.04 74,583.60 - 4,788.48 0.93
Jul-08 4,945.60 79,529.20 - 4,788.48 1.03
Aug-08 3,956.48 83,485.68 - 4,788.48 0.83
Sep-08 4,945.60 88,431.28 - 4,788.48 1.03
Oct-08 4,670.85 93,102.13 - 4,788.48 0.98
Nov-08 4,066.39 97,168.52 - 4,788.48 0.85
Dec-08 4,780.75 101,949.27 - 4,788.48 1.00
Jan-09 4,945.60 106,894.87 - 4,788.48 1.03
Feb-09 4,615.90 111,510.77 - 4,788.48 0.96
Mar-09 164.85 111,675.62 - 4,788.48 0.03
111,675.62 111,873.35 1.00
Cum. Planned
Avg. Tech. Staff
Month Billing per SPR
per month
month
Jun-06 20.00 10
Jul-06 50.00 20
Aug-06 93.33 30
Sep-06 292.46 40
Oct-06 356.84 50
Nov-06 406.45 60
Dec-06 511.44 70
Jan-07 599.54 80
Feb-07 689.66 90
Mar-07 771.50 100 SPR = 771.5/100 =
Apr-07 26.58 798.08 110 7.26 7.71
May-07 26.58 824.65 120 6.87 Lacs per month
Jun-07 65.41 890.06 130 6.85
Jul-07 65.41 955.47 140 6.82
Aug-07 82.30 1,037.77 150 6.92
Sep-07 89.42 1,127.19 160 7.04
Oct-07 129.72 1,256.91 170 7.39
Nov-07 183.80 1,440.70 180 8.00
Dec-07 162.44 1,603.15 190 8.44
Jan-08 196.13 1,799.28 200 9.00
Feb-08 186.54 1,985.82 210 9.46
Mar-08 215.79 2,201.60 220 10.01
Apr-08 156.53 2,358.14 230 10.25
May-08 260.52 2,618.66 240 10.91
Jun-08 288.47 2,907.13 250 11.63
Jul-08 302.78 3,209.91 260 12.35
Aug-08 279.64 3,489.54 270 12.92
Sep-08 301.41 3,790.95 280 13.54
Oct-08 296.35 4,087.30 290 14.09
Nov-08 280.84 4,368.14 300 14.56
Dec-08 298.92 4,667.06 310 15.06
Jan-09 302.09 4,969.16 320 15.53
Feb-09 291.91 5,261.07 330 15.94
Mar-09 187.49 5,448.56 340 16.03
Apr-09 140.39 5,588.94 350 15.97
May-09 17.93 5,606.87 360 15.57
Jun-06 10 4 2.50
Jul-06 10 4 2.50
Aug-06 10 4 2.50
Sep-06 10 4 2.50
Oct-06 10 4 2.50
Nov-06 10 4 2.50
Dec-06 10 4 2.50
Jan-07 10 4 2.50
Feb-07 10 4 2.50
Mar-07 10 4 2.50
Apr-07 10 4 2.50
May-07 10 4 2.50
Jun-07 10 4 2.50
Jul-07 10 4 2.50
Aug-07 10 4 2.50
Sep-07 10 4 2.50
Oct-07 10 4 2.50
Nov-07 10 4 2.50
Dec-07 10 4 2.50
Jan-08 10 4 2.50
Feb-08 10 4 2.50
Mar-08 10 4 2.50
Apr-08 10 4 2.50
May-08 10 4 2.50
Jun-08 10 4 2.50
Jul-08 10 4 2.50
Aug-08 10 4 2.50
Sep-08 10 4 2.50
Oct-08 10 4 2.50
Nov-08 10 4 2.50
Dec-08 10 4 2.50
Jan-09 10 4 2.50
Feb-09 10 4 2.50
Mar-09 10 4 2.50
Apr-09 10 4 2.50
May-09 10 4 2.50