temporary supports

existing strength reduced


old buildings
competent PE with past experience
rescue operation personnel (collapse of structure)
Revised since 1 Sep 2020
1 day MC or light duty due to workplace accident
Admitted in a hospital due to workplace accident
e.g. demolition above, excavation below
stop works earlier and check the existing
structure
prepared by PE

common boundary
sewer and special services - for new buildings cannot be under the building,
old buildings is quite common, dont damage it!
could be unauthorised; check if temp support required before demolition

brick wall can be load bearing (e.g. 400-500 thk) esp for older/conservation buildings

PT is not normal demolition - tension need to be


release, else it will SNAP.
need temp propping of retaining wall?

gas check
e.g. building after fire
(original LL)

PC, PT, etc.

start where, how long to remove one floor


Propping on 3 floors -- see slide 34 base on loading
I dont understand...
If I have a building
7m per sty, 8 sty
--> Design for 5kN//m2
4m per sty, 12 sty
--> Design for 10kN/m2
But the 7m building is much
higher!! 56m VS 48m

because impact is higher


side got opening is ok

full enclosure
not used in Singapore