Professional Documents
Culture Documents
Renewable Energies:
- German concept -
replacing fossile energy & closing down of nuclear power
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Ökonomie
Future-Proof Energy, Made in North Rhine-Westphalia
The EnergyAgency.NRW
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Ökonomie
Outline
The EnergyAgency.NRW
Sample Projects
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Folie 3 Ökonomie
North Rhine-Westphalia
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Folie 4 Ökonomie
North Rhine-Westphalia (NRW) –
Centre of the European Energy Industry
• 18 million inhabitants
• 34,084 km2 in area
• 89% of German hard coal extraction (2011)
• 54% of German lignite extraction (2011)
• 25% of German end energy consumption (2.2 EJ)
• 29% of German electricity production (176 TWh)
• 44,970 MWel installed power plant capacity
• No nuclear energy
• 7.7 % of electricity generation from renewable energies
(increasing)
• 240,000 employees in energy sector (of whom 28,000 are in
the area of renewable energies)
• Germany's "Energy Region No. 1"
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Folie 5 Ökonomie
Electricity Generated from RE in Germany during 2011
Source: BMU/AGEE-Stat
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Folie 6 Ökonomie
Electricity Generated in NRW in 2011
NRW share in
Germany NRW Germany
Energy sources
TWh % TWh % %
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Folie 7 Ökonomie
Folie 10
Mio. t CO2eq
0
100
200
300
400
500
600
700
800
900
1000
Deutschland
Großbritannien
Frankreich
Italien
Polen
Spanien
NRW
Niederlande
Tschech. Rep.
Belgien
Rumänien
Griechenland
Österreich
Finnland
Portugal
Ungarn
Schweden
Dänemark
Te
ch
nik
CiF
e.V.
Source: Ziesing 2011, LANUV
Ök
o
Ökonomie
log
ie
Outline
The EnergyAgency.NRW
Sample Projects
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Folie 11 Ökonomie
Energy Transition in Germany
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Folie 12 Ökonomie
Objectives of Energy Transition
Greenhouse
Proportion Total Primary Building Transporta
gases Electricity
of electricity proportion energy renovation tion
(cf. 1990)
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Folie 13 Ökonomie
Nuclear Phase-Out by 2022
2010 2011
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Folie 14 Ökonomie
Climate Protection Policy in NRW
Objective:
To reduce greenhouse gases in NRW by 25% by 2020 and
by at least 80% by 2050, from 1990 level in each case
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Folie 17 Ökonomie
Innovation Process in NRW:
From Research Project to Market Penetration
Academia Business
Education Advanced training
Distribution
Market launch
Demonstration
Research
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Folie 7 Ökonomie
Outline
The EnergyAgency.NRW
Sample Projects
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Folie 10 Ökonomie
Solar Tower in Jülich
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Folie 1 Ökonomie
Wind Power – Strong in NRW
Research
•35 institutions at 13 universities and 4 non-academic institutions
•Research funding (ongoing projects): approx. €12.5 million
Industry
•Strong supply industry, particularly in mechanical engineering
•7,000 employees, €2 billion in revenue
•Global market share 50%, export quota 60%
Installation
•2,940 wind turbines with 3,257 MW
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Folie 3 Ökonomie
ELECTRICITY
economically environmentally
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Ökonomie
POWER-PLANTS ELECTRICITY by RENEWABLES
competition no!
GERMANY
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Ökonomie
Almost clean energy.
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Ökonomie
Mission
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Ökonomie
Our Mission
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Ökonomie
Our Mission
Mauerstetten
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Ökonomie
Our Business
Exploration: Collection of all available geological and geophysical data to identify where suitable sites are for
geothermal development. Implementation of seismic surveys.
Prefeasibility study and financing of drilling: Planning and permitting. Geology is naturally critical, but of
equal importance is ensuring that local regulations and permitting rules are complied with. This phase includes
also the well design and procurement.
Drilling and testing: Daldrup’s engineers and planners start work many months before a drill rig appears on
site. After the drilling extensive well testing takes place. And despite the best geo-science, not all wells are
entirely successful.
Power plant design and construction: Once wells have been successfully drilled and tested, Daldrup can
start procurement and construction of the Kalina power plant. This phase takes about 18 months.
Power plant development and operation: After completion and commissioning, the power plant and wells
will continue to generate clean electricity for fifteen years or more. The electricity is exported to the national
high voltage distribution network.
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Ökonomie
Our Business
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Ökonomie
Our Business
In late 2007, Daldrup carried out one of the largest seismic surveys ever in Germany for geothermal
exploration. The survey covered approximately 150 line kilometres stretching over four claims in the Bavarian
Molasse Basin.
The survey uses modern high resolution 2-D vibroseismic, targeted on the Malm limestone formation at a depth
of approximately 3.500 meters.
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Ökonomie
Our Business
Prefeasibility Study
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Ökonomie
Our Business
Drilling and Testing
When the above-mentioned preparation phase has come to an end, we are ready to commence drilling
operations.
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Ökonomie
Our Business
Drilling and Testing – Daldrup & Sö hne AG
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Ökonomie
Our Business
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Ökonomie
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Ökonomie
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Ökonomie
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Ökonomie
There are 8 MW of clean energy hidden in this picture.
Find them with Exorka, the worlds leading company for low-temperature-geothermal energy.
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Ökonomie
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Ökonomie
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Ökonomie
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Ökonomie
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Ökonomie
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Ökonomie
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Ökonomie
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Ökonomie
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Ökonomie
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Ökonomie
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Ökonomie
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Ökonomie
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Ökonomie
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Ökonomie
Ök
nik
o
ch
CiF
log
Te
e.V.
ie
= Singapure 29th July 2014 =
Ökonomie