You are on page 1of 11
CE 4251 BUILDING SERVICES ENGINEERING ASSIGNMENT 02 NAME : CHANDIMA P.A.D. REG NO : €G/2018 13290 DATE + 28/04/2021 SEMESTER : O04 Scanned with CamScanner Part 1 > Water Supply System [EJ Number of people im a fiogy= 80 Female in a floor = 80 x 10 00 =Yy 1, ‘Maleleeaionana Fleer =as0— 2 = 4 Therefore Becacding $s planning of Sanitary apartment data Sheet; each Floor need, For male - #2 For female - & = 4- W.C.S5 SS 4 - Wash watts l- Wash basins 4 - Urinals Floors building . Se who te leThece are five Rea age building need, For male > F2x5= 360: For Female SQx5 =40E 4xS= 209W.C.$ Sa W-C.S AxS = 10 Wash basins 5 => Wash basin be S = 20 > Urinals two @As well as every Flare need Bae Cleanecs? Sinks alto. Then whole builtiyy need 1@ number of Cleaners’ Sinks. VL Cleaner wk fac each Flor Scanned with CamScanner LEGEND -W.Cc. (Dimensions are in rrilieneter) ( TH - Cteeners? Sint.) - Wash basins. Ioclpar tiaras + earl 300 FIGURE 1: FLOOR PLAN OF MALE AND FEMALE SANITARY COMPARTMENTS Scanned with CamScanner 000— 4poomn oot Rov W.C.5 Cael Unnels Wash besins — C. Siake a Creer vu ¢ Et p> ee eee rere Seas > Ty E (| ae ec | ee ® 9 , Sepp : 35mm —1@) ' 1 1 Wish basing Cink ‘ ¢ os ae. f ro iit i ji a 7 DB men ' : ' w-¢ \ Wath basins! C.Siat \ Z PSeeo t a Pars * Peal ala 1 1 ® | De ama Cs : 2tmn F \ ws 1 Wash besiaa C. Stak apes ee Fi Pa eo , SaE [ ete - : ® amen | @_ 28mm 0 ay Stoo mr 1 89S Omen T 500 rars| 28mm p \ WES Coy] Urinals ‘ Wash — basin's Co Sink y ‘ / ae cer [ reop ee r" Cf ae WL 1 . 50. : T i Le. @ ssf © sy Aes ae - | esakeeee Ll ee Booomm Voom 2000men —_—NN2Sinm BOOST oak. 225mm Time 350mm 350 FIGURE 2: PLUMBING ARRANGEMENT OF THE BUILDING Scanned with CamScanner Pipe No 1 f)Looding Units = 25 W.C.s x2 +25 Wash basins X 1K 410 Cleaners’ Sink x 4 = 124-5 foading unity. =. (Assumptions : ese mkhbes sare | oetertbu ted se 4 Cleaners? Siak feadtay anit is + i) Flow rake = Flow rate for Minimum flow require d WES foading UNIS for 20 urinals = 1.55 by, + 20x 0-94 Ly, = 2.35 Lye —. (Guate Flos cate for leading unit can get Fram Figuee bel] Biminimam flaw requirement For urtaglf; from tablet of pipe S2inay data Sheet) Wy) Assumed pipe ne t Gouter diameter af 35 me = SO0mm + 1S00mm + 4000Me V) Measured pipe = rua = 6000mm W Equivalent pire _ Equvalent pipe length —, Eruivalent pipe Inst length of Fibting¢ Far 35mm Copper elbow for 35mm Copper Eee = I-4 mm 2.0mm = 324 = Cereb 4 Copper Fitbings ave used) (Vatwey are get fram Eable 4, Fittings estore) Scanned with CamScanner ee vi) Effective pipe length Na) Loss of head in meters meter Ton Of per pipe iQ Head Comtumed in = meter} x) Total heed Consumed jn meters mM) Actual head = available Pd Final pipe = diame C&€ Foc pipe no 4, Measures length + equivalent resistance length 6000 mm + 3400mm Ito0 mm 0.995 M/m run (mess Eee sizing chet) Effective length Loss of head in of pipe mecers per mette ro of — pige 0.005 ppm apy aL. 0.94% mM S Individuaf heads consumed. 0-0 aM 3 35mm | Aetunt head available Total head Can tamed ( Scanned with CamScanner [a eos-or |€68°61 | ran) | Sso-o |Se-ov | s-01 | 5¥-01] ge ‘s-0 | say) sa il ae | eos-ov[syy-a1] 58x10] esi-0 | 06-00 as 019 zu [oho | oa, + at 925 9%) 579791 | 955-0 | Oor-a | OS'S Sea) 20° gt 49-0 1S'St fh 3t P9059) | yt0-91 | CBHI} SSO-0 S§-9t 59 Sh-ol oz t5-0 Nel) uu tw 9089) | hes hy [Sau “4 osi-e og)? 365) org UW O¥-0 | am) n ae 9905'S) |Gos vt |Sterd ost" o oss oat eo-) 8c ti) ols a1 uv | Cost [Hee ry feay-1 | Sso-0 | s6-a% Sao S491 ae 5-0 oe) 6 Be | costs | e566 [tty-0 | Mo-o | oF-H) 8 vn9 at 94-0 om Ay II 8% | ops-ui| o8t-G J ose-z | ozh-o | OS'S Seal oe 8b on L au e0S'd | c&€b-9 | t84-) | Ss 0-0 S6°9t et) S70 at ts-0 su 5 8t 905-3 | a87's | rt9-0 | HOO ov) 5°38 org ae ono ony S. se peers 9 oe oH De-9 ow 90°) Sic 46-1 o-z0l y | SE | °°S'% Jona -¢ [429-0 | Glo-o $3 te eure 59-01 SE €5-0 € eu | cos:y | 220° |z29-0 | 90-0 ora) cos a &t oho ov cc $6 | cosy | este Josss | osv-o | 94-6 vt oO) se sew | seu 1 wi EG? Re ells co Lae aa) Peeps oyeinias ey Sea val. Sen pyres Pays] pe eps ag Pe. - beat “bP 4 prensgra] Peawnes| Presse] ou eve se Qniaind D210 Addo JNA DHL 30 WILSAS AALVM-GI0D BAHL JO ONIZIS Adid st AId¥L Scanned with CamScanner |. Scanned with CamScanner Ventilated Stack Discharge Stack Voomm hare FIGURE 3: ISOMETRIC VIEW OF BRANCH PIPE CONNECTION OF VENTILATED STACK SYSTEM OF FLOOR Scanned with CamScanner aa Each Flow having S wit.s,5 wath basins » 4 urinal and 2 Clearners? Sink in thig Five - Storey office building. “Then betas discharge units are, 25 W.Csx 14 = 380 discharge umts 25 Wath betagx2= 50 discharge units 20 Urinaly x2 = 40 SiScharge uni es 10 Simes x 1g = 140 aUschacge Unitt Tata = 580 discharge units, Accor ding te Code of Practise 304,1968 data Sheet , iE Can he Seen that a fog me Steck will be sakisfactory- (Ospeniecan | DB titre WC. ore usea) Wa §) RIP CL a she ceca Wath betas pipe Ste- So mm bare eae "Uetwaly pipe Site Dae bore *Cleanees Sink pire Ste - \Oemamas swank barey A Urtulge pletrarn sircmesouness *Matu ventilates Stack Site — 4mm bere BWash bara: Branch veut See — DSimimimceey Scanned with CamScanner lent Ma REFERENCES © Seajonsharma. files wordpress com-2021+LOntine} Available at : ghttos: / saajentherme. Files, wor Apress - Com /2013/03/ building - Services -hendboot - pdf > L Accessed 2S Ager’ 20259, 9 Enm. wikipedia.org .2021. Piping and inttramen tation diage arn Wikipedia [ontime] Avalable at: chttps:// enim. wikipedia Org / Wied / Piping and ing tranren tation - dtagvam > C Accessed 26 Apes 20319. © Govinfo gov. 2024. [ontiaed Avatable at. & 99V [Cam ben recesses https: // www. govinfa. £/ 0&9 / Gov PUB ¢13- 9Faoaerrtf4¢Fa000n242F31 /pal> 26 Apel 2095), Scanned with CamScanner

You might also like