MVCC-Tech Spec
MVCC-Tech Spec
2.4. The bidder shall submit Quality Assurance Plan for manufacturing process with the
technical bid.
2.5. The Bidder should be a manufacturer of covered conductors in India and must have a
minimum experience of 5 years as a manufacturer of covered conductor. (the Bidder
should have a covered conductor manufacturing facility in India for the past 5 years )
2.6. The bidder shall have to submit all the required type test reports should not be older
than 07 years for the offered item. All the required type test of any equal or higher
size item must have been conducted in the span of one year only. However, in the
event of partial submission of reports older than specified limit, bidder must submit
his confirmation for those type test reports to be submitted in the event of an order,
without affecting delivery schedule, before commencement of supply, free of cost. In
absence of this confirmation, the evaluation shall be carried out accordingly as non-
submission of type test reports.
2.7. It is not the intent to specify completely here in all the details of design &
construction of material. However the material shall conform in all respects to high
standards of Engineering, design and workmanship operation in manner acceptable
to the purchaser, who will interpret the meanings of drawings and specification and
shall have the power to reject any work or material which in his judgment is not in
accordance therewith. The offered material shall be complete with all components
necessary for their effective and trouble free operation. Such components shall be
deemed to be within the scope of bidders supply irrespective of whether these are
specifically brought out in his specification and / or purchaser order or not.
Network 3Phase-3wire
No of phases Three
(Page 4 of 34)
DGVCL/TS/SD-MVCC/00
6. TECHNICAL REQUIREMENT:
(Page 6 of 34)
GUVNL/GPRD/TS/SD-MVCC/04
8. PRINCIPAL PARAMETERS:
8.1. The details of Insulated / Covered AAAC 55 Sq mm conductor are tabulated below:
8.3. The lay ratio of the different layers shall be within the limits given
Confidential & Private document GPRD Cell, GUVNL, RP-IIT Gandhinagar (Page 14 of 34)