PROJECT: Construction of The New Link Road Between Shah Gas Field & Mezairaa Area Phase-1 (Packages 1 & 2)
PROJECT: Construction of The New Link Road Between Shah Gas Field & Mezairaa Area Phase-1 (Packages 1 & 2)
(Packages 1 & 2)
HEALTH, SAFETY AND ENVIRONMENT
Weekly Site Observation Report
Location:
Package-2
Contractor has breached:
Method Statement:
N/A
OSHAD-SF :
COP-21.0 Permit to Work System
01 Approved HSE Plan- Rev 01:
5.09 PTW-System
Musanada HSE Requirements
Musanada Key HSE requirements section-5.15
Musanada SOP:
IMS SOP 8 Hazard and Risk
Legal:
UAE Federal Law No. 08 of 1980
Ministerial Order no. 32 of 1982 A.D. on determining prevention means
and measures to protect workers from occupational hazards,
Site Visit Report for Construction of Shah Link Road: Package-1 & 2
PROJECT: Construction of the New Link Road between Shah Gas Field & Mezairaa Area Phase-1
(Packages 1 & 2)
HEALTH, SAFETY AND ENVIRONMENT
Weekly Site Observation Report
03 Observation:
Excavation observed without appropriate barricading and
signage, traffic coming from Asab Mazra side can be affected.
Insfficent awareness signage.
Location:
Package-02
Contractor has breached:
OSHAD-SF :
AD OSHAD- CoP 29.0 – Excavation, AD
Site Visit Report for Construction of Shah Link Road: Package-1 & 2
PROJECT: Construction of the New Link Road between Shah Gas Field & Mezairaa Area Phase-1
(Packages 1 & 2)
HEALTH, SAFETY AND ENVIRONMENT
Weekly Site Observation Report
Site Visit Report for Construction of Shah Link Road: Package-1 & 2
PROJECT: Construction of the New Link Road between Shah Gas Field & Mezairaa Area Phase-1
(Packages 1 & 2)
HEALTH, SAFETY AND ENVIRONMENT
Weekly Site Observation Report
Site Visit Report for Construction of Shah Link Road: Package-1 & 2
PROJECT: Construction of the New Link Road between Shah Gas Field & Mezairaa Area Phase-1
(Packages 1 & 2)
HEALTH, SAFETY AND ENVIRONMENT
Weekly Site Observation Report
Site Visit Report for Construction of Shah Link Road: Package-1 & 2