You are on page 1of 8

Guideline

Document title

BGA-XXX-XXX-XX-0000

Value Assurance Framework (VAF)


Value Assurance Framework (VAF) BG Guideline

Title -----

DOCUMENT INFORMATION SHEET


TITLE:
PURPOSE AND SCOPE:

Document No: Issue No: Issue Date:


BGA-XXX-XXX-XX-0000 01

FOR ISSUE: (Issue after peer and cross functional review)

Signature: Position:

Name: Email address:

Originating Function :

HEAD FUNCTION APPROVALS: [select all relevant functions]

Department Signed by/date Name Position

FINAL APPROVAL:
Signature: Position: Head of Operations

Name: Date:

APPROVAL AND ISSUE RECORD:


Issu
Description Author Approved
e Date
(see Revision Record for details) (name) (name)
No.

REVISION RECORD:

BGA–XXX–XXX–XX-0000
Value Assurance Framework (VAF) BG Guideline

Title -----

Issue No. Description of Revision

BGA–XXX–XXX–XX-0000
Value Assurance Framework (VAF) BG Guideline

Title -----

1.0 INTRODUCTION 5
1.1 Purpose and Scope 6
1.2 Definitions 6
1.3 Abbreviations 6
4.0 FEEDBACK FORM 64

BGA–XXX–XXX–XX-0000
Value Assurance Framework (VAF) BG Guideline

Title -----

1.0 INTRODUCTION

This Guideline should be read in conjunction with the Purpose, Development and
Application of BG Standards and Guidelines Standard (BGA-BGA-GEN-OS-0001).
BG Guidelines are provided to support the mandatory BG Standards. Whilst this and all
other Guidelines are not mandatory, it is strongly recommended that the content is
understood and considered for implementation by employees, secondees and contractors.

If you are reading a hard copy of this Guideline, you should consider it out of date
and refer instead to the version currently on the Portal.

BGA–XXX–XXX–XX-0000
Value Assurance Framework (VAF) BG Guideline

Title -----

1.1 Purpose and Scope

The purpose of this document is

The scope covers

The range of Business segments and Value Funnel lifecycle stages to which this Standard
/ Guideline applies are identified below:

All developments / projects, world-wide

Business Upstream T&D Power LNG


Segment :

Stage : Create Assess Select Define Execute Operate Decommission

Note: Assess includes Feasibility studies, Select includes Option assessments, Define includes both Pre-
FEED Definition and FEED studies, Execute includes Detail Design, procurement, Construction
and Commissioning.

1.2 Definitions

In this document, the following definitions apply:

COMPANY BG Group or a wholly owned subsidiary company or other client


organisation as may be defined by the contract;

PURCHASER A Procurement Contractor acting on behalf of Company, or


Company itself, in the case of a direct purchase;

VENDOR The main supplier or manufacturer of the items of plant or


equipment to which this document applies, including items that
may be designed and / or manufactured by others;

SHALL A mandatory term - no deviation is permitted without written


approval from the Group Technical Authority;

GROUP TECHNICAL The principal discipline engineer or manager responsible


AUTHORITY for identifying, generating, approving and maintaining a given
Standard / Guideline

1.3 Abbreviations

BGA–XXX–XXX–XX-0000
Value Assurance Framework (VAF) BG Guideline

Title -----

Appendix A

LIST OF REFERENCED / ASSOCIATED DOCUMENTS

BG Standards / Guidelines:

BGA–XXX–XXX–XX-0000
Value Assurance Framework (VAF) BG Guideline

Title -----

2.0 FEEDBACK FORM

FEEDBACK FORM
This form should be used to notify comment or suggestions for improvement, relating to any aspect of the document
identified below. Please return the completed form by Email, to the Technical Authority identified in the associated
Document Information Sheet.

Document title: Document No:

Technical Standard / Operating Standard / Guideline - BGA-

Issue No:

Issue Date:

Comments by: Date: …………………………

Name: ……………………………………………….. Email address / Contact Tel.No: …………………………

Position: ………………………………………….. Project / Business Unit: …………………………..

Page / Section No: Comment

BGA–XXX–XXX–XX-0000