1.0 PURPOSE
The purpose of this documented information is to make a system to describe the environmental
protection and mitigation measures that will be associated with all KCC work premises.
2.0 SCOPE
This procedure is applicable to all work locations of company including projects sites and office
areas.
HSE Manager, Project Safety Manager, all Department Manager and QHSE Manager
5.9 Occupational Health and Safety (OH & S) – Conditions and factors that affect or could
affect the health and safety of employees or other workers (including temporary workers
and contractual employee), visitors or any other person in the workplace
5.10 Hazard – Source, situation or act with a potential for harm in term of human injury or ill
health or a combination of these
5.12 Environment – Surroundings in which an organization operates, including air, water, land,
natural resources, flora, fauna, humans, and their interrelation
5.14 Environmental Impact – Any change to the environment, whether adverse or beneficial,
wholly or partially resulting from an organization's environmental aspects.
5.18 Hearing Protection Device (HPD) – Devices used by employees to reduce the impact of
noise levels i.e. ear plugs and ear muffs.
5.19 High Noise Area – Areas with steady state noise levels equal to or exceeding 85 dBA.
5.20 Noise Reduction Rating (NRR) – The device which check the capability/accurate of hearing
protection device of noise.
5.21 Audiometry – A method of hearing assessment that tests an individual's ability to hear
sounds of different intensities and frequencies.
5.22 Decibel (dB) – The decibel is a unit of measurement of sound pressure level.
5.23 Exchange Rate – Increase of sound level, which permissible exposure time is halved. The
two common exchange rates are 3 dBA and 5 dBA
5.25 Noise Hazard Area – An area in which the sound levels regularly exceed 85 dBA.
5.26 Time Weighted Average (TWA) – It represents the average (noise) exposure measured
over a typical 8 - hour workday
5.27 Spill Kits – Spill kits are purpose designed units that contain several items useful for
cleaning up spills that could occur.
5.29 Water Testing Instrument – To check the quality of drinking water such as
PH/TDS/Conductivity Level.
5.30 Bund Wall – Bund wall constructed from concrete to control the spills.
5.31 Spill Tray – spill tray made of metal or plastic completely sealed as per require size the
purpose to control containment of leaks from machinery, Equipment or vehicles
5.33 Hierarchy of waste management – Avoid, Reduce, Reuse, Recycle, Recovery, Disposal
6.0 RESPONSIBILITY
7.1 We are seeking by this step to get common understanding and agreement by all stakeholders,
those stakeholder’s name below shall affixed their signature and abide to implement and
follow all the steps that is written in this procedure.
Documented
Steps
Description of Activities Responsibility Information to be
(S.No)
Maintained
8.0 Context of KCC Integrated Management System (IMS), Quality, Health, Safety & Environmental
8.1 The general context of KCC shall be classified as: QHSE Manager
Documented
Steps
Description of Activities Responsibility Information to be
(S.No)
Maintained
a) Internal Context:
o Technology
o Skilled Workers
o Finance
o Stakeholder Expectations
o Other local Environmental Concerns
KCC has established, keep maintained and monitored its All Staff QHSE Policy,
Environmental Management System performance to achieve Environmental
9.1 intended outcome, including enhancing its environmental Objectives &
performance in order to meet requirements of Saudi Legal, Programs, F-01-KDI-
Documented
Steps
Description of Activities Responsibility Information to be
(S.No)
Maintained
Customer, International Standard and any other interested HRD-04 , ISO
parties etc. 14001:2015 Standard,
Environment
Monitoring
Programs
10.0 Leadership:
QHSE Policy :
10.2
KCC has established the Environmental Management System Top QHSE Policy
Documented
Steps
Description of Activities Responsibility Information to be
(S.No)
Maintained
Policy by defined scope, appropriate to the purpose and Management
context of the organization, including the nature, scale and
environmental impacts of its operations, products and
services.
Roles, Responsibility and Authority:
KCC has allocated the roles, responsibility and authority of its CEO Job Description
Environmental Monitoring Program to achieve the
10.3 Environment
environmental objectives and Target.
Monitoring
And to be periodically monitored, measured, analyzed and Environmental Programs
Coordinator
evaluated.
11.0 Planning:
KCC has established the risk and opportunities, related to its QHSE Manager Risk Assessment
environmental aspects and to prevent or reduce undesired
effects, including the potential for both internal and external (SWOT analysis from
conditions to affect the organization, impact on environment the EMS point of view)
and to achieve continual improvement.
KCC has defined and Identify the control process of Significant Environmental
Environmental Impacts as result of Company activities, Coordinator Environment
operations and services: Monitoring
Programs
11.1 Emissions to air
Releases to water
Waste management
Land contamination
Use of raw material and natural resources
Impact on the community
Other local environmental concerns
KCC will regularly monitor and evaluate the compliance status Environmental Legal Register, Internal
of the applicable environmental legal requirement. The Coordinator Audit Report, LOT,
12.1 records of the results to be periodically evaluated and shall be Environment
retained. Monitoring Programs
etc.)
12.0 Environmental Objectives:
12.1 KCC has defined and established the Environmental Objectives QHSE Manager
Documented
Steps
Description of Activities Responsibility Information to be
(S.No)
Maintained
and Programs and it is consistent with QHSE policy. QHSE Policy,
Environmental
Environmental
The environmental objectives to be monitored, measured, Programs /
Coordinator
communicated to interested parties and updated as Environmental
appropriate/whenever required. Objectives and
Target
Documented
Steps
Description of Activities Responsibility Information to be
(S.No)
Maintained
13.0 Resources
15.0 Operation
Documented
Steps
Description of Activities Responsibility Information to be
(S.No)
Maintained
appropriate) for all identified significant environmental Technical
aspects. Adequate to the operating criteria. Support,
Material Environmental
Environmental management system requirement are Management Programs,
addressed in each stages of planning, design and Manager / PM / Supplier Sub-
development process. Department Heads / contractor
Site Safety Manager / Monitoring Re-
To ensure procurement of materials, services of external Environmental
providers, including sub-contractors are communicated evaluation,
Coordinator
the company environmental requirements.
Environmental
Monitoring Measurement, Analysis and evaluation: Programs,
Monitoring and
KCC has defined, established, implemented to monitor, Measurement,
measure, analysis and evaluate its environmental
Environmental Analysis of
16.1 performance in order to meet the legal compliance, Data, , Legal
Coordinator
customer requirements, company own requirement, Compliance,
any interested parties, and international standard Calibration
requirement.
EOT.
16.2
Internal Audit:
Documented
Steps
Description of Activities Responsibility Information to be
(S.No)
Maintained
compliance requirements. QHSE Manager 05
Management Review:
F-01-KDI-QHSE-
KCC shall review the Company Environmental Management
16.3 01 & F-02-KDI-
System by planned intervals (minimum one MRM in a year), Top Management QHSE-02
to ensure its continuing suitability, adequacy and
effectiveness.
17.0 Improvement :
CONTROLLED
DEPARTMENT NAME / PROJECT NAME
COPY NO.
1 CEO
2 Operations
3 Business Development
4 Administration
5 Material
6 Quality, Health, Safety and Environmental
7 Warehouse and Inventory
8 Finance
9 Project Control Department
10 Workshop – Wood, Aluminium and Steel Production
11 Transportation and Maintenance
12 Al Khobar Hospital – Al Khobar
13 Basic Science – University of Dammam
14 Housing Complex – University of Dammam
15 Housing Compound – SWCC Al Khobar
16 Electronic Buildings – KFU Al Ahsa
17 Sec Infra Construction 310 Villas 815-C17 RC Jubail
18 Mosque Project 750-C01 RC Jubail
19 Defence Force Buildings 090-C26 RC-Jubail
20 Defence Force Buildings 090-C27 RC-Jubail
21 Administration / HRD
22 Admin Buildings 097 C-32 RC-Jubail
23 Ministry of Defence - 3345
24 738-C02
25 Ministry of Defence – (Nariyah)
26 PP14 (SECO) Riyadh Project