Designed in site date:

A B C D E

1st Revision Owner's


March 2021

approval date:
Material List
Item Qtty. Unit Description
1 1 5 1 2 5
1 2 12 1 4 1
8 1 12 1
4 51 18 1
1 5 51 181 1 1
51 14 4
51 1 12

Av. de la Marina #10 Zona Centro Ensenada,


8 52 18 1
52 14 4

Baja California, Mexico 22800

McKinna 50' Project


1 524 181814 1 4

Baja Naval S.A. de C. .


11 524 14141 4 4 12
12 515 1814 1 4
1 515 141 4 12
14 5 1 181 1 1
15 51 181 1 1
1 51 1412 4 4
1 51 1 8 1 2 12
18 5 18 1
1 5 14 4
5 1 12
2 2
21 45 14 1
22 458 258 1
4882 1 2
2

45 4 2 12
24
14
45 54 1 2 12
FW 25

4
D 2
1 2
15 2
24
1

2
1 2 5

10 3/8 28 1

3 9 7/8 11 16 1/8
42 1/2 4 4
4

4
Length as 4
23 1/2 10 3/8 required to 4 5
get Pump "IN"
4

Approv.
connection 4
15 5 4 5/8
/8 1-1/4 from 24

3 17 Stateroom Sole
1/2 low surface 24
19
Length as
22
5

Description
Revisions
required to get
Pump "IN"
4 4

Fr
4 connection
Wa 22

es
15
ter

h
14

Ta
14

n
14

Date
CL
28
4 14 28
Drawing:
resh ater Piping
14 3/4 under Stateroom
4 7 7/8 Sole
19 P MP IN
21 1/2 Revision: 01
Drawn:
5 Sherem Mora
Revised:

Approved:

Sheet 1 of 5