ACTIVITY 4

OUTPUT
WORK BREAKDOWN STRUCTURES (WBS)

2 STOREY RESIDENTIAL HOUSE

SITE FOUNDATION FRAMINGS/ WALLS ROOFING UTILITIES FINISH


FORMWORKS WORK

Layout Grade Excavate Install Lay


Sheeting G.I. sheets

Erect Pour Remove Hang Tape & Electric Gas Water


Forms concrete Forms Sheetrock Bed

Floor Sub- Stud Frame Do Do Do


Joist floor Walls Roof rough-in rough-in rough-in
work work work

Install Install Install Install Get Get Get


1st 1st 1st 1st building building building
Floor Floor Floor Floor inspect inspect inspect

Install Install Install Install Do Do Do


2nd 2nd 2nd 2nd Finish Finish Finish
Floor Floor Floor Floor work work work

Install Install Install Paint Lay wall Lay floor


cabinets Appliances furnace walls tiles tiles