Civil

Sequence of Finishing works in CAFÉ


BUILDING Structure
completion
Ceiling one
coat
painting Block work

Plumbing Electrical FFL transfer


HVAC
Coring for
pipe Conduit and
HVAC
MEP
Fire
ducting Roughplaster
model box Chipping
works in toilet
fixing
Fire fighting
puddle pipe
Fan Hacking of
Flange
installation Bull marking concrete
installation DB
surface
installation Pressure
testing
Bore packing Damper Mesh fixing in
installation Joints
Floor box Springler
installation installation
Toilet Plastering for
FCU waterproofin all painting
Piping works installation g walls
Springler
Wiring work cover
Façade
Drain pipe & Toilet dado installation
Pressure
testing inlet & outlet
installation
Final Fixture Toilet Doors and
flooring windows
Flush valve
Insulation
for piping

Main
flooring
Cp fittings
Final fixture
Flooring
protection
Sanitary
fixtures
Ceiling grid
installation
Access panel
instalation
MEP
clearance
Single coat
paint
Ceiling
installation

Door
hardware

Final coat
SNAG painting