Factory finifshing WBS

To construct 5-
unit warehouse
for light industry
Complex

finishing

Air conditioning Carpentry and


Plumbing works Electricity works Plastering works Isolation works Tiling works Painting works Gypsum works
works aluminum works

Concrete
Drinking water Sanitation Pull the electrical The talents of Installing marble
Screw spray Coarse plaster Soft plaster insulation with Interior tiles Exterior tiles Windows Doors Interior paints
installations extensions wires in the walls meekness .tiles on windows
bitumen materials

Adjusting the
Watering coarse Soft mulch Insulating floors Installation of Installation of
Hot water lines Install the plugs inclination under Exterior paints
mulch watering from moisture braids wooden pallets
the tiles

Install light Cleaning pour Installation of Installation of


Cold water lines Roof insulation
switches under the tiles aluminum frames partitions

Opening places for


Insulating walls
chandeliers and Tiling and defining
from moisture and Installing windows Installing doors
light spots in the spaces with tiles
sound
ceilings

Installing the box


Installing handles
chassis and closing Tile grooving
and shutters
.the breaker panel

Polishing tiles