The document outlines the organizational chart for construction of the Koforidua Regional Hospital in Ghana. It details 6 departments: project management, site engineering, planning, procurement, quality assurance, and quantity surveying. Each department is responsible for specific tasks related to overseeing construction activities, ensuring quality standards are met, and procuring necessary materials and labor. A safety and health department is also included to maintain workplace safety during the project.
Original Description:
Original Title
Project Organizational Chart & Mobilization Times for Staff
The document outlines the organizational chart for construction of the Koforidua Regional Hospital in Ghana. It details 6 departments: project management, site engineering, planning, procurement, quality assurance, and quantity surveying. Each department is responsible for specific tasks related to overseeing construction activities, ensuring quality standards are met, and procuring necessary materials and labor. A safety and health department is also included to maintain workplace safety during the project.
The document outlines the organizational chart for construction of the Koforidua Regional Hospital in Ghana. It details 6 departments: project management, site engineering, planning, procurement, quality assurance, and quantity surveying. Each department is responsible for specific tasks related to overseeing construction activities, ensuring quality standards are met, and procuring necessary materials and labor. A safety and health department is also included to maintain workplace safety during the project.
PROPOSED CONSTRUCTION OF KOFORIDUA REGIONAL HOSPITAL, KOFORIDUA, GHANA
PROJECT ORGANIZATIONAL CHART
Depending upon the nature of work, category of work, size and strategy adopted for the completion of work, appropriate site staffing is very important hence the under listed highlights our site departmental team for a swift execution of the project and also our Site Organizational chart as below: Project management: The Project management team shall direct the daily activities on the site. Site Engineer: The Site engineer is to support both the project manager and the site manager. The duty of site engineer is to keep coordination within the staff, subcontractor, consultant and supplier and ensure all construction activities conforms with the industry standards. Planning department: They plan every work activity as per time given by the client making by bar chart material schedule, labour schedule, plant and machinery schedule. Their job is to get the work done with minimum cost and obtain the best results. Procurement department: Purchase and inspection of materials and goods coming on site, instruct respective departments, maintaining material registers, storing and housing all material on site in proper place as per the site condition and handover material to workers as per their requirement, keeping their records is the main work of the store department. Quality Assurance department: Checking of all material coming on site, testing of all the material as per requirement and verifying mix design of material going to use for site execution, inspection and checking of all activities involving work execution regarding quality norms and condition, testing of work executed like sample testing nondestructive testing, making of audit report maintaining material testing, mix design, concrete testing and finally auditing test reports on site is the main work of this department. Quantity surveying department: checking of all drawings and specifications regarding site, estimating and surveying quantity of each work activity separately, calculating material required and labour required for each work item. Safety and health department: This department ensures safe working environment, safety for all site workers and staff, improving and applying all safety instructions on site is the main work of this department. Cleaning of site offices, maintains all site awareness, cleaning of staff accommodations periodically etc. PROPOSED CONSTRUCTION OF KOFORIDUA REGIONAL HOSPITAL, KOFORIDUA, GHANA
Below is our Site organizational chart for easy channel of communications within our team setup: