Professional Documents
Culture Documents
Unit Cost
I.D. No. Description Qty. Unit
Material
I General Requirements
1 Mobilization and Demobilization
2 Safety Productive Measures / PPE
3 Tools & Equipment Support
4 Temporary Facilities & Utilities
a. Temporary Electric power and light
b. Temporary water service and distribution
c. Material Storage & Warehouseman
5 Supervision & Support
TOTAL OF GENERAL REQUIREMENTS
II Direct Cost
A Site Works
1 Excavation 338 m³
2 Gravel Bedding 24 m³ ₱ 420.14
3 Embankment 273 m³
TOTAL OF SITE WORKS
C Structural Concrete
1 Footing, Column, Beams, Slab and Septic Tank
a. Portland Cement 1240 bags ₱ 205.00
b. Gravel 3/4 138 m³ ₱ 1,050.00
c. Sand 69 m³ ₱ 950.00
TOTAL OF STRUCTURAL CONCRETE
E Structural Steel
1 16mm diameter x 6m 29 pcs ₱ 378.72
2 16mm diameter x 9m 75 pcs ₱ 568.08
3 16mm diameter x 10.5m 5 pcs ₱ 662.76
4 16mm diameter x 12m 29 pcs ₱ 757.44
5 10mm diameter x 6m 1138 pcs ₱ 147.00
6 No.16 GI wire 134 kgs ₱ 16.00
TOTAL OF STRUCTURAL STEEL
G Tiling Works
1 40x40cm Glazed Floor Tiles 875 pcs ₱ 60.00
2 30x30cm Floor Tiles 134 pcs ₱ 39.00
3 30x30cm Glazed Wall Tiles 237 pcs ₱ 32.30
4 Cement 34 bags ₱ 205.00
5 Sand 3 m³ ₱ 950.00
6 Tile Adhesive 20 bags ₱ 505.00
7 Grout 87 kgs ₱ 62.00
8 Tile Trim 5 pcs ₱ 95.00
TOTAL FOR TILING WORKS
SUMMARY
II. DIRECT COSTS
III. CONTINGENCY
Unit Cost Total Cost
Grand Total
Labor Material Labor