You are on page 1of 11
CE 4251 BUILDING SERVICES ENGINEERING ASSIGNMENT 02 NAME :RIDMAL KMST REG.NO +FEG/2018/ 3441 DATE 32%1/04/ 0001 SEMESTER: 04 Scanned with CamScanner Part ol: Water Supply System Number of people working in one floor = 80 Number of Females working in one floor = 80 x 19. Number of maleS working in one Floor = gOx AO 400 From data Sheet of sanitory applrances & Stack design, For a one floor, For males, For females, Water closegts = 4+ Water closets <1 Wash Basins = 4 Wash Basins = Uvinals ou And there Should be a cleaner’s Sink for the Floor AS office building iS consisted from.s Storeys, Required number of Water closetS= 4x5 + 1x5 = 95 Required number of Wash basins- sxS 41xS =05 Required number of urinals = 4x5 =20 Required cleaner’s sinks = \xS =S — Scanned with CamScanner —— LEGEND J ura CLEANER'S SINK wash (4 WATER (——] BASIN cy CLOSET Boome Ns 1ocomm . _Looomm -_rocomm 6 aoomm aa J] | Jaoomm ww) L oomm oom] at k =|} 5 4 @e | LoCo un MALE x co 1000 mm tooomm 4 OC (ey hocomm 000mm po} ¥ soomm amg (I oie asomm} J 200m dA \ooomre FEMALE x Fl freoomm x + FIGURE 01: PLAN VIEW OF MALE AND FEMALE SANITARY COMPARTMENTS Scanned with CamScanner 1500mm| * L ssmm oO 3000 om wice Urinals W/e £ Cortes! fale ye cig 5, a rf [ _ clr if fe fi L, slo 3 | ann @ Ann } asm a ao ® secemm wie J Urinals, w/be we we ys} -——~—_ | Ane os pp rl pplepe ef LEME rr trt rt ire er ainm Of Sea I oe 4 socom bo wes Sl w/8 « w/e Ws ¢e| ' | it ireceire tices fecomn : rl ; | _L } aemm © @ 28mm | ( basme h y lo { 000mm w/c | Urals | W/8 & we we Four eloors). Each floor *S consisted From, Five water closets Five wash Basins Four urinals One cleaner’s gink According 40 ahe table of “Vent Stack sizes inmm) for ofcice the Building Research PIS), diameter oF as 100mm & Cdiameter buildings © From Establishment Drgest, drainage Stack 'S Stelected Number of floors is selected ase] Then +hat column is intersected by the rowor ‘public use s*S * by 40mm. wv Vent Stack diameter iS 40 mm. ——— Scanned with CamScanner ventilated stack Discharge stack loomm bore FIGURE 03: ISOMETRIC VIEW OF BRANCH PIPE CONNECTION OF VENTILATED STACK SYSTEM OF ONE FLOOR Scanned with CamScanner Total discharge units of five floors, 25 water closets x14 = 350 dvScharge units 2S wash basins x 9 = SO diScharge units 20) urinals x 2 = 40 discharge units S Sinks x\4 = %0 discharge units Total = 510 discharge units According +0 Code of practie 304,1968 data Sheet, it can be identified that loomm stack "S Satis Factory CHere assumed that g Litres water closets are used) Water closets pipe size = 100 mm bore Wash basins pipe size = SO mm bore Urinal pipe size = 39a mm bore Cleaners sink pipe Size = 100 mm bore Wash basins and Urinal p-trap size = 32 mm bore Main ventilated stack Size = 40mm bore Wash basins branch vent Size = aS mm bore —— Scanned with CamScanner REFERENCES ©) Coursehero.com 2oai, Distribution Systems ‘mh Multi Storeged Bui/dings 32 Sp4%_ Direct Supply Systeml Course Herol online] Available at : < https: // www: courSehero. com | File / pa maski/ Distribution - Systems| ~im= Multi - Storeyed- Buildings -39-SD4ta2 -Direct- Supply - System/> Caccessed 94 April acai] (os) Cleaning. A-, 2021. Design oF plumbing Systems for multi Storeyed buildings . Contine] Need -a- pro. com. Available at: < https = // need-a- pro. com/en/ aveveles / 10 ~constructvon - and - repair / 203-desrgn- Of - plumbrng - Systems - for ~muldi -Storeyed- buildings CaAccessed a4 April aoa) ©) Resources- qld. gov-44-2041 Con\inel Available at: < https = / www. resources -q\d gov. au/_ datalassery pde_ cile /oois /sooss / water - sewerage -planning-— guidelines. pd¢ > CAccessed 2% Apri) acai] eee Scanned with CamScanner

You might also like