Professional Documents
Culture Documents
Pack
Published by Team of SAP
Consultants at SAPTOPJOBS
Visit us at www.sap-topjobs.com
Copyright 2007-09@SAPTOPJOBS
2. WORK CENTERS..................................................................................38
2.1 Define work center type and link to task list application ................................... 39
5.3 Deactivate lock for internal assignment of serial numbers .............................. 102
1. Bills Of Materials (BOM)
a. Direct assignment
b. Indirect assignment
BACKGROUND
SCENARIO
INSTRUCTIONS
Click
Maintain fields as explained below
Field Name Value and Description of field
Tick in this check box will
activate the lowest system
date (1.1.1900) as valid from
date when creating the BOM,
User can not change it.
Tick in this check box indicate
the requirement of Validity
period for BOM.
Tick in this check box
activates the Engineering
Change Management (ECM)
for BOM.
Note: - Detailed ECM setting is
defined in our PP config
document.
Tick in this check box makes
ECM as a mandatory for each
BOM. Each BOM can be
created or changed with ECM
only.
Tick in this check box will
deactivate multi BOM creation
for a material.
Tick in this check box will
deactivate variant BOM
creation.
Click
BACKGROUND
Example: -
- Explosion in MRP
MRP only reads BOMs whose BOM status has at least one of
these indicators.
SCENARIO
1. Click
2. Click
6. Click Save .
BACKGROUND
¾ Design,
¾ Production
¾ Costing.
In this way, each area is dealing only with the specific data it
requires.
Example:
Note:-
INSTRUCTIONS
Follow the Menu Path: IMGÆPlant Maintenance and
customer servicesÆ Master data in plant maintenance and
customer service ÆBills of materialsÆ General Data Æ BOM
Usage Æ Define BOM usages
1. Click
2. Click
6. Click Save
When creating the BOM, key defined here will appear in the
BOM Usage field.
BACKGROUND
Sales
Production
Spare part
¾ is related to Production
SCENARIO
INSTRUCTIONS
Follow the Menu Path: IMGÆPlant Maintenance and
customer servicesÆ Master data in plant maintenance and
customer service ÆBills of materialsÆ General Data Æ BOM
Usage Æ Define Default values for item status
1. Click
2. Click
5. Click Save .
Example:-
BOM item level default setting will appear as per the setting
done here.
BACKGROUND
SCENARIO
INSTRUCTIONS
Click
2. Click
2. Click Save .
BACKGROUND
SCENARIO
Define item category to meet the situation as per the below
example.
INSTRUCTION
Click
Click
BACKGROUND
SCENARIO
INSTRUCTIONS
1. Click
Click
Click Save .
Impact of this configuration in Master Data /
Transaction
BACKGROUND
SCENARIO
INSTRUCTIONS
Click
Click
Click
While creating the BOM spare part group can be selected and
maintained at item level
1.9 Define Priorities for BOM usage
BACKGROUND
• Production
• Costing
• Engg / Design
There are more than one BOM (BOM usage) They are
1 for Production,
2 for Engg/Design
3 for Costing.
INSTRUCTIONS
Click
Click to create additional order of priority for BOM
usage.
BACKGROUND
Following parameters
Item category
Item increment
SCENARIO
INSTRUCTIONS
Click
Click
To view more details, select the required row and click
Click
BACKGROUND
SCENARIO
INSTRUCTIONS
Click
Click
Click Enter
Select Created capacity category
Double Click
Click
Click .
BACKGROUND
Mandatory
Optional
Highlight
Hide
SCENARIO
INSTRUCTIONS
Click
Double click Basic data
Select Req. radio button against
Click Field selection Req. radio button for the required work
center category. Contents column indicate the work center
category.
Click
Click
BACKGROUND
• Power
• Labour
• Setup time
• Depreciation
• Steam etc.
SCENARIO
Click
Click
Maintain the Following fields
Field Description
Parameter Parameter to hold the value.
Any alphanumeric six digit
may be entered. E.g. LABOUR
Origin Place where from the value is
to be taken. E.g. To indicate
value to be taken from task
list maintain 2 in this field.
Short key word Short description
Key work Key word to identify
Dimension Dimension of the parameter.
E.g. Any thing related to
Duration may have TIME as
dimension.
Standard Value Unit Unit of this parameter. E.g.
Time dimension may have
unit as MIN.
BACKGROUND
Example:-
• Production cost
• Set up cost
• Labour cost
• Quality Cost
• Power cost
• Steam cost
One work center can have only one standard value key.
SCENARIO
Click
Click
Maintain the Following fields
Field Description
Standard value key Enter any alpha numeric to
indicate standard value key.
E.g. STD1
Description Maintain standard value key
description. E.g.
setup/machine/labor/Power
Parameter Maintain the parameters. Up
to six parameters can be
maintained.
Tick this check box to
generate formula.
Click Save .
BACKGROUND
SCENARIO
INSTRUCTIONS
Click
Click
Update the Following fields
Field Description
Plant Name of the plant e.g. IND6
Person Responsible Three digit alpha numeric
entry to mention the
responsible person to the
work center. E.g. IN1
Person responsible description Detailed description of the
person responsible. E.g. Water
line Area
Click Save .
9 Planned maintenance
9 Ongoing maintenance
Hope you got an idea about task list. Let us look into its
configuration details now.
3.1 Define Task List usage keys
BACKGROUND
Usage of work center to the specific task list (i.e. only in the
maintenance task list) can be defined to restrict its usage.
SCENARIO
Define the work center usage to the specific task list types.
INSTRUCTIONS
Click
Select
Click
Update the Following fields
Field Description
Task List type A for General maintenance
task list
E – Equipment task list
T – functional location task
list
Click Save .
BACKGROUND
• Scheduling of operation
Control key is mapped with the work center in the task list
(i.e. in the routing and in the master recipe).
SCENARIO
INSTRUCTIONS
Click
Click
Maintain the Following fields
Field Description
Control Key Enter any alphanumeric four
digit key. E.g. YPM1
Description Maintain description of this
control key. E.g.
Sched,capacity,Cost,
Mustconfirm
Indicators Tick the check box as shown
above in the screen.
Tick in the Check box will
perform the respective
function to the operation /
phase which is having this
control key.
Click Save .
Click Save .
Click
Click Save .
Impact of this configuration in Master Data /
Transaction
BACKGROUND
Task list status helps to use the task list only for specified
purpose. I.e. it use can be restricted only for costing purpose
till the costing trial is completed.
In Process
SCENARIO
Create a task list status.
INSTRUCTIONS
Click
Click
Click Save .
BACKGROUND
• Production usage
• Costing only
SCENARIO
INSTRUCTIONS
Click
Click to create new entry.
Click Save .
BACKGROUND
9 Operational increment
9 User defined field key
9 Default UOM for work
9 Purchase org. for external processing
9 Currency
9 Vendor
9 Usage
9 Status
SCENARIO
INSTRUCTIONS
Click
Click
Fields are self explanatory, not explained.
Click
BACKGROUND
User field can be used in the operation heading in the task list
to define your own reference data.
SCENARIO
INSTRUCTIONS
Click
Click
BACKGROUND
SCENARIO
INSTRUCTIONS
Click
-- indicates PRTs to be allowed for planning
Click
BACKGROUND
9 Scheduling
9 Costing
9 Printing
9 Completion confirmation
SCENARIO
INSTRUCTIONS
Click
Click
Click
BACKGROUND
Cost
Capacity requirements
Calculate capacity
SCENARIO
INSTRUCTIONS
Click
Click
Maintain the Following fields
Field Description
Parameter Parameter to hold the value.
Any alphanumeric six digit
may be entered. E.g. LABOUR
Origin Place where from the value is
to be taken. E.g. To indicate
value to be taken from task
list maintain 2 in this field.
Short key word Short description
Key work Key word to identify
Dimension Dimension of the parameter.
E.g. Any thing related to
Duration may have TIME as
dimension.
Standard Value Unit Unit of this parameter. E.g.
Time dimension may have
unit as MIN.
BACKGROUND
SCENARIO
INSTRUCTIONS
Click
Click Pagedown to Locate PRT formula
Double click
Click
Example
BACKGROUND
SCENARIO
INSTRUCTIONS
Click
Click
Click
Click
Click
BACKGROUND
SCENARIO
INSTRUCTIONS
Click
Double click
Click
Click
Click
Double click
BACKGROUND
SCENARIO
INSTRUCTIONS
Click
Tick in the check box will unlock the master record while
assigning the serial number.