You are on page 1of 5

RESULT OF E-AUCTION FOR COAL MINES UNDER 2nd TRANCHE OF COMMERCIAL AUCTIONS

By: S N Chawla, Email: sn_chawla@yahoo.com


S. No. Coal Mine Act State Coal field OC/UC Area Exploration Geo. Extractable PRC Grade Preferred Bidder IPO % FPO % Total Revenue
(sq. Status Reserve Reserve (MT) (MTPA) share for one year
in Rs. Cr.
km) (MT)

1 Bhaskarpara CM(SP) CHHATTISGARH JHILIMILI Mixed 9.34 EXPLORED 46.91 24.06 1 G7 Prakash Industries Ltd 34.25 55.75 251.09
Act, 2015
2 Burakhap Small CM(SP) JHARKHAND RAMGARH OC 0.58 EXPLORED 9.68 Mining Plan is not 0.4 G6 Shreesatya Mines Pvt Ltd 17.00 20.00 73.88
Patch Act, 2015 prepared.
3 Gondkhari CM(SP) MAHARASHTRA KAMPTEE UG 8.62 EXPLORED 98.71 41.75 1 G8 Adani Power Maharashtra 8.00 9.50 105.15
Act, 2015 Ltd
4 Jogeshwar & CM(SP) JHARKHAND WEST OC 2.66 PARTLY 84.03 Mining Plan is not 0.6 W-IV South West Pinnacle 5.00 24.25 104.63
Khas Jogeshwar Act, 2015 BOKARO EXPLORED prepared. Exploration Limited
5 Rauta Closed CM(SP) JHARKHAND RAMGARH OC 1.75 REGIONALLY 7 Mining Plan is not 0.4 G7 Shreesatya Mines Pvt Ltd 15.00 75.50 124.50
Mine Act, 2015 EXPLORED prepared.

6 BHIVKUND MMDR MAHARASHTRA WARDHA OC 8.02 EXPLORED 102.3 Mining Plan is not 0.72 G9 Sunflag Iron and Steel Co 8.50 9.00 68.29
Act, 1957 VALLEY prepared. Ltd
7 JHIGADOR MMDR CHHATTISGARH BISRAMPUR Not 39.7 REGIONALLY 250 Mining Plan is not 2 G7 CG Natural Resources Pvt 5.50 6.00 199.12
Assessed EXPLORED prepared.
Act, 1957 Ltd
8 KHARGAON MMDR CHHATTISGARH BISRAMPUR Not 40.1 REGIONALLY 250 Mining Plan is not 2 G7 CG Natural Resources Pvt 5.50 6.00 199.12
Assessed EXPLORED prepared.
Act, 1957 Ltd
848.63 Assumpt
ion

1
RESULT OF E-AUCTION
AUCTION FOR COAL MINES UNDER 2nd TRANCHE OF COMMERCIAL AUCTIONS
600
Geo. Reserves with Preferred Bidders
500
Geo. Reserve (MT)

400

300
500
200

100 102.3
46.91 16.68
98.71 84.03
0
South West
Prakash Industries Shreesatya Mines Adani Power Pinnacle Sunflag Iron and CG Natural
Ltd Pvt Ltd Maharashtra Ltd Exploration Steel Co Ltd Resources Pvt Ltd
Limited
Series1 46.91 16.68 98.71 84.03 102.3 500

RESULT OF E-AUCTION
AUCTION FOR COAL MINES UNDER 2nd TRANCHE OF COMMERCIAL AUCTIONS
By: S N Chawla, Email: sn_chawla@yahoo.com
RESULT OF E-AUCTION
AUCTION FOR COAL MINES UNDER 2nd TRANCHE OF COMMERCIAL
AUCTIONS
80

75.50
70

60

55.75 54.50
50

40

30

20 24.25

10
9.50 9.00
6.00 6.00
0
Jogeshw
Burakhap Rauta
Bhaskarp Gondkha ar & Khas BHIVKUN JHIGADO KHARGA
small Closed
ara ri Jogeshw D R ON
patch Mine
ar
PRC (MTPA) 1 0.4 1 0.6 0.4 0.72 2 2
IPO (Initial Price Offer) in % 34.25 17.00 8.00 5.00 15.00 8.50 5.50 5.50
FPO( Final Price Offer) in % 55.75 54.50 9.50 24.25 75.50 9.00 6.00 6.00

RESULT OF E-AUCTION
AUCTION FOR COAL MINES UNDER 2nd TRANCHE OF COMMERCIAL AUCTIONS
By: S N Chawla, Email: sn_chawla@yahoo.com 3
RESULT OF E-AUCTION
AUCTION FOR COAL MINES UNDER 2nd TRANCHE OF COMMERCIAL
80.00 AUCTIONS
70.00
Final Price Offer

60.00

50.00
FPO

40.00
75.50

30.00
54.50 55.75

20.00
24.25

10.00 6.00 6.00


9.00 9.50
0.00
South West
CG Natural CG Natural Sunflag Iron Adani Power
Pinnacle Shreesatya Prakash Shreesatya
Resources Pvt Resources Pvt and Steel Co Maharashtra
Exploration Mines Pvt Ltd Industries Ltd Mines Pvt Ltd
Ltd Ltd Ltd Ltd
Limited
Series1 6.00 6.00 9.00 9.50 24.25 54.50 55.75 75.50

RESULT OF E-AUCTION
AUCTION FOR COAL MINES UNDER 2nd TRANCHE OF COMMERCIAL AUCTIONS
By: S N Chawla, Email: sn_chawla@yahoo.com

4
RESULT OF E-AUCTION FOR COAL MINES UNDER 2nd TRANCHE OF COMMERCIAL AUCTIONS
By: S N Chawla, Email: sn_chawla@yahoo.com
Schedule/ Avg. Repres Effecti Applica Upfront Bid IPO FPO( Revenu Perfor Fixed Monthly Monthly Royalty DMF NME GST Total Total Others Date Clo
Area Geo. Extractabl No. of New Block GCV entativ ve ble Amount Securit (Initial Final e Share mance Amou Paymen Payment (Rs.) (Rs. ) T Comp (Royal Revenue of sing
S. No. Coal Mine
Exploration PRC
Act State Coal field OC/UC (sq. Reserv e Reserve Grade Preferred Bidder Bidde Technical Qualified Bidders
Status (MTPA) e Price Price Repres (Cr.) y (Cr.) Price Price per Guaran nt (Rs. ton on (Rs.) ensat ty, share for Auctio Tim
km) e (MT) (MT) rs (Rs./To Coeffi entative Offer) Offer) Tonne tee (Rs. Cr.) (Rs. Cr.) Annual ion DMF, one year n e of
1. Godawari Power and Ispat Ltd nnes) cient ( Price in % in % of coal. Cr.) (Rs. Cr.) (Rs.) NMET, in Rs. Others: Auc
2. Prakash Industries Ltd • Green Cover (%): 15
CM(SP) Prakash Industries Ltd 3. Sunflag Iron and Steel Co Ltd • Surface Features: State Highway-12 and another 04.08.
1 Bhaskarpara CHHATTISGARH JHILIMILI Mixed 9.34 EXPLORED 46.91 24.06 1 G7 3 Schedule-I 5350 2633 0.77 4101 30.88 6.18 34.25 55.75 1468 119.37 22.76 12.23 146.7898 574.13 57.41 11.48 400 104.30 251.09 4.36
Act, 2015 road passes through the block. 2021
• Coal Evacuation: State highway 12, running north-
south, crosses the block centrally.
1. Adhunik Power & Natural Others:
Resources Ltd • Green Cover (%): 19%
• Surface Features: Damodar river in the southern
2. Ramgarh Sponge Iron Pvt Ltd
part and N-S running NH-33 passes through the
Mining 3. Shree Sai Urja Limited
CM(SP) middle of the 04.08.
2 Burakhap Small Patch JHARKHAND RAMGARH OC 0.58 EXPLORED 9.68 Plan is not 0.4 G6 Shreesatya Mines Pvt Ltd 5 4. Shreesatya Mines Pvt Ltd Schedule-I 5350 3728 1.08 5760 9.02 1.80 17.00 54.50 2032 66.40 2.59 6.77 81.2704 806.37 80.64 16.13 400 52.13 133.40 5.45
Act, 2015 block. 2021
prepared. 5. South West Pinnacle Exploration • Coal Evacuation: Ranchi Road is the nearest Rly.
Limited Stn. At about 8 km. NH-33 crossing the block north-
south from the
middle.
1. Adani Power Maharashtra Ltd Others:
2. Sunflag Iron and Steel Co Ltd • Green Cover (%): 6%
• Surface Features: NH-6 passes through the block
CM(SP) Adani Power Maharashtra in the southern part. Proposed outer ring road 02.08.
3 Gondkhari MAHARASHTRA KAMPTEE UG 8.62 EXPLORED 98.71 41.75 1 G8 2 Schedule-I 5050 2443 0.53 2675 60.29 12.06 8.00 9.50 232 37.32 20.07 1.93 23.2085 374.51 37.45 7.49 400 81.95 105.15 1.01
Act, 2015 Ltd passes 2021
through the middle of the block.
• Coal Evacuation: Kalmeswar is the nearest Rly.
Stn. At bout 9 km
1. Dhansar Engineering Co Pvt Ltd Others:
2. Hilltop Hirise Pvt Ltd • Green Cover (%): 19%
Mining
Jogeshwar & Khas CM(SP) WEST PARTLY South West Pinnacle 3. South West Pinnacle Exploration • Surface Features: Bokaro river on the northern 02.08.
4 JHARKHAND OC 2.66 84.03 Plan is not 0.6 W-IV 3 Schedule-I 5350 3073 0.71 3818 64.56 1.22 5.00 24.25 745 45.84 1.70 3.73 44.71215 534.55 53.45 10.69 400 59.92 104.63 2.33
Jogeshwar Act, 2015 BOKARO EXPLORED Exploration Limited boundary. 2021
prepared. Limited • Coal Evacuation: Jogeswar Bihar Rly Stn is about
5 km
1. Adhunik Power & Natural Others:
Resources Ltd • Green Cover (%): 19%
Mining • Surface Features: Damodar river is the southern
CM(SP) REGIONALL Shreesatya Mines Pvt Ltd 2. Shree Sai Urja Limited 03.08. 6.04
5 Rauta Closed Mine JHARKHAND RAMGARH OC 1.75 7 Plan is not 0.4 G7 4 Schedule-I 5350 2633 0.86 4621 4.61 0.57 15.00 75.50 1988 61.27 0.06 6.63 79.5166 646.93 64.69 12.94 400 44.98 124.50 boundary limit of the block.
Act, 2015 Y EXPLORED 3. Shreesatya Mines Pvt Ltd • Coal Evacuation: Ranchi Road Rly. Stn. approx,. 2021 .
prepared.
4. South West Pinnacle Exploration 3 km
Limited
1. Aurobindo Realty & Others:
Infrastructure Pvt Ltd • Green Cover (%) : Nil (As per FSI)
Mining Sunflag Iron and Steel Co • Surface Features : Surface built-up, Visapur Rly
MMDR WARDHA 2. Sunflag Iron and Steel Co Ltd 03.08.
6 BHIVKUND MAHARASHTRA OC 8.02 EXPLORED 102.3 Plan is not 0.72 G9 Ltd 2 New Block 4150 2102 0.55 2291 53.76 10.75 8.50 9.00 189 22.63 18.13 1.14 13.62096 320.77 32.08 6.42 400 54.67 68.29 stn at east, Rly line passing through the block 1.00
Act, 1957 VALLEY • Coal Evacuation : Railway line along the eastern 2021
prepared.
boundary

1. Aurobindo Realty & PRC (MTPA) -Not Assessed, Assumption- 2 MTPA


Infrastructure Pvt Ltd • CBM Overlap (%) : Nil
Not Mining
MMDR REGIONALL CG Natural Resources Pvt 2. CG Natural Resources Pvt Ltd Others: 02.08.
7 JHIGADOR CHHATTISGARH BISRAMPUR Asses 39.7 250 Plan is not 2 G7 2 New Block 5350 2633 0.52 2791 164.56 9.45 5.50 6.00 158 68.46 1.70 2.63 31.596 390.74 39.07 7.81 400 167.53 199.12 1.00
Act, 1957 Y EXPLORED Ltd • Green Cover (%) : 31 (As per FSI) 2021
sed prepared. • Surface Features : Dam in northern part of the
block
1. Aurobindo Realty & PRC (MTPA) -Not Assessed, Assumption- 2 MTPA
Infrastructure Pvt Ltd Others:
Not Mining
MMDR REGIONALL CG Natural Resources Pvt 2. CG Natural Resources Pvt Ltd • Green Cover (%) : 21 (As per FSI) 04.08.
8 KHARGAON CHHATTISGARH BISRAMPUR Asses 40.1 250 Plan is not 2 G7 2 New Block 5350 2633 0.52 2791 164.56 0.57 5.50 6.00 158 68.46 1.06 2.63 31.596 390.74 39.07 7.81 400 167.53 199.12 1.00
Act, 1957 Y EXPLORED Ltd • Surface Features : Nadi flows through the block 2021
sed prepared.

Assum
848.63 23
ption

You might also like