2. Cavite
Aggregates Cu. M. - -
Total Non-Metallics 0.00
3. Laguna
Filling Materials Cu. M. - -
Total Non-Metallics 0.00
4. Quezon
Aggregates 3 Cu. M. 51,118.00 12,505,880.00
Sand and Gravel 2 Cu. M. 26,297.00 462,820.00
Total Non-Metallics 12,968,700.00
5. Rizal
Aggregates 14 Cu. M. 4,204,786.30 797,351,386.47
Filling Materials 1 Cu. M. 47,584.00 5,098,149.76
Limestone 4 M.T. 1,623,921.03 341,008,759.62
Pozzolan 1 M.T. 302,533.90 208,368,360.47
Volcanic Tuff 1 Cu. M. 86,870.00 22,944,772.49
Blocks and Boulders
3 Cu. M. 69,366.25 14,939,786.61
(Marbleized Limestone)
Silica 3 M.T. 254,128.19 63,317,828.64
Total Non-Metallics 1,453,029,044.06