The document is a project cost estimate for the construction of a new electrical tower protection wall (No. 55) in Ainaro Municipality, Timor-Leste. It provides a breakdown of costs for preliminary works, the reinforced concrete retaining wall, and river normalization/embankment work. The total cost estimate for the retaining wall construction is $283,326.24 and river work is $87,468.75, with preliminary costs of $4,650.65. The grand total project cost is estimated to be around $375,445.64.
The document is a project cost estimate for the construction of a new electrical tower protection wall (No. 55) in Ainaro Municipality, Timor-Leste. It provides a breakdown of costs for preliminary works, the reinforced concrete retaining wall, and river normalization/embankment work. The total cost estimate for the retaining wall construction is $283,326.24 and river work is $87,468.75, with preliminary costs of $4,650.65. The grand total project cost is estimated to be around $375,445.64.
The document is a project cost estimate for the construction of a new electrical tower protection wall (No. 55) in Ainaro Municipality, Timor-Leste. It provides a breakdown of costs for preliminary works, the reinforced concrete retaining wall, and river normalization/embankment work. The total cost estimate for the retaining wall construction is $283,326.24 and river work is $87,468.75, with preliminary costs of $4,650.65. The grand total project cost is estimated to be around $375,445.64.