The document is a project cost estimate for the construction of a new electrical tower protection wall (No. 55) in Ainaro Municipality, Timor-Leste. It provides a breakdown of costs for preliminary works, the reinforced concrete retaining wall, and river normalization/embankment work. The total cost estimate for the retaining wall construction is $283,326.24 and river work is $87,468.75, with preliminary works at $4,650.65, for a grand total project cost of $375,445.64.
The document is a project cost estimate for the construction of a new electrical tower protection wall (No. 55) in Ainaro Municipality, Timor-Leste. It provides a breakdown of costs for preliminary works, the reinforced concrete retaining wall, and river normalization/embankment work. The total cost estimate for the retaining wall construction is $283,326.24 and river work is $87,468.75, with preliminary works at $4,650.65, for a grand total project cost of $375,445.64.
The document is a project cost estimate for the construction of a new electrical tower protection wall (No. 55) in Ainaro Municipality, Timor-Leste. It provides a breakdown of costs for preliminary works, the reinforced concrete retaining wall, and river normalization/embankment work. The total cost estimate for the retaining wall construction is $283,326.24 and river work is $87,468.75, with preliminary works at $4,650.65, for a grand total project cost of $375,445.64.