EQUIPMENT MAINTENANCE SCHEDULE

EQUIPMENT TYPE AUTOMOTIVE (Car / Jeepney)

EQUIPMENT CODE CAR –Manual / Automatic (transport equip)


LOCATION Practical Work Area
Schedule for the Month of March
MANPOWER Daily Every Weekly Every Monthly Remarks
ACTIVITIES Other 15th
Day Day

1. Check panel board, Mechanic X Activity is


and circuit breakers’ done before
electrical connections, Traineer and after
using the
 Clean and kept dry equipment
 Parts are well-
secured/attached
 Properly labeled
2. Check oil and fuel Mechanic X Activity is
spills: done before
Traineer and after
 Clean and kept dry using the
 Parts are well- equipment
secured/ attached
 Inspect for
damages and
replace parts if
necessary
3. Check adjustment Mechanic X Activity is
lever’s of carburetor if done before
functional ,fuel Traineer and after
injector if not, using the
calibrate equipment

4. Check Tire and wheel Mechanic X Activity is


alignment. done before
Traineer and after
using the
equipment

5. Check electrical and Traineer X Activity is


auto accessories. done before
(battery and wire) and after
using the
equipment

6. Perform pre-starting Traineer X Activity is


and warm up for 10 done before
minutes and observe Mechanic and after
for unusual noise or using the
abnormal operation; if equipment
repair is necessary,
send to technician.