JCB on DPR On LogSheet

Exavation/filling Diff(2-1) Diff(2-3) Diff(2-4) Dressing Diff(2-1) Diff(2-3) Diff(2-4)


Date Excavation/Filling C&G
31.01.2017 25 Lab & Play ground area 25 DPR Vijay log sheet Recon. DPR Vijay log sheet Recon.
1 2 3 4 1 2 3 4
01.02.2017 39 Toilet area 76.5 JCB JCB
02.02.2017 260 Play area 3.5 260 160 31 to 6 660 687 659.2 630 27 27.8 57
03.02.2017 240 Play Ground area 4.9 240 7 to 13 192 206 204 342.5 14 2 -136.5 4100 4000 4000 205 -100 0 3795 200
04.02.2017 50 Play Ground area 0 50 85 Exavator Exavator
05.02.2017 33 DG foundation 0 32.7 31 to 6 190 390 idle 340 200 50 2500 1500 750 -1000 750
06.02.2017 40 Petrl pump 3.3 40 7 to 13 565 595 525 595 30 70 0 2730 2900 2900 745 170 0 2155
687 Grader Grader
07.02.2017 65 Weigh bridge Water tank 5 63 31 to 6 1750 192 1750 200 -1558 -1558 -8
08.02.2017 40 3000 Weigh bridge and DG 4.7 40 3000 7 to 13 4000 400 400 400 -3600 0 0
09.02.2017 10 1000 Camp C& g 5 10 1000
10.02.2017 8 Barrier pit 0.6 8