Sl No Date Work DetaiTime(HoursRate Total
Road
Shifting
Earth
4/21/2022 Levelling 3 1850 5550
Road
Shifting
Earth
4/23/2022 Levelling 4 1850 7400
Road
Shifting
Earth
4/25/2022 Levelling 6 1850 11100
Road
5/13/2022 Levelling 2.5 1850 4625
Soil
5/19/2022 Loading 4 1850 7400
T5-
Earthfillin
5/24/2022 g 4.9 1850 9065
Hitachi
5/28/2022 Breaking 4.3 1850 7955
JCB T2
Soil
Loading 3 1850 5550
CAT-JCB-
T5
5/29/2022 Levelling 1.5 1850 2775
Company
JCB 7.5 1200 9000
T5-
5/30/2022 Levelling 6.3 1850 11655
Company
JCB 3.5 1200 4200
T5
5/31/2022 Levelling 6.5 1850 12025
Trench
5/18/2022 Making 2 2850 5700
Company
JCB 1.7 1200 2040
Hitachi
5/14/2022 Breaking 5.8 2850 16530
Hitachi
5/18/2022 Breaking 6 2850 17100
5/19/2022 Loading 4.5 1850 8325
4 1850 7400
Provision
5/28/2022 of Tipper 2 2150 4300
Provision
5/29/2022 of Tipper 2 1800 3600
Provision
5/19/2022 of Tipper 2 2000 4000
F1A(Grid
O6 Line)
Footing
bottom
area hard
rock
breaking
at CLUB
1 5/15/2022 HOUSE 3 2600 7800
Blasted
hard rock
breaking
and
removing
at grid
5/29/2022 O8-c-F5) 1.5 2600 3900