Patching Jumlah Titik Satuan Volume P L T (ton) Titik Lubang 369.6 A kemarau 123.2 0.40 0.40 0.06 m³ 1.18 2.72 hujan 246.4 0.40 0.40 0.06 m³ 4.73 10.88 4x patching 13.60 Dimensi Rata-rata (m') Scraping Jumlah Titik Satuan Volume Total Volume P L T B Titik Retak 100.40 15.00 3.60 m² 5,421.60 5,421.60 Titik Rutting 23.20 150.00 3.60 0.05 m² 12,528.00 12,528.00 17,949.60 Dimensi Rata-rata (m') Total Volume Overlay Uraian Satuan Volume P L T (ton) Vol Scraping 17,949.60 0.05 m³ 897.48 2,064.20 C KM 331 150.00 11.70 0.04 m³ 70.20 161.46 PR kontraktor Akses + SS 65.00 8.00 0.05 m³ 26.00 59.80 2,285.46 Dimensi Rata-rata (m') Total Volume Cold Mix Jumlah Titik Satuan Volume P L T (ton) Titik Lubang 369.60 D 184.80 0.40 0.40 0.06 m³ 1.77 4.08 1 sak 25 kg 184.80 0.65 0.65 0.04 sak 163.22 4.08