Advantages of double bottom shafts:


• The bottom of the shafts with double wall (outer bottom wall of the shafts and inner wall - troughs).
• Outer bottom wall prevents deformation of the troughs of the shaft.
• Intermediate space between the outer wall of the bottom of the shafts and the trough is filled with
polyurethane foam.
• Polyurethane foam essentially increases the resistance of the bottom to hydrostatic pressure and thus
prevent deformation of the trough.
• Upon request, the space between the outer wall of the bottom of the shaft and the kinet can be
partially filled with concrete (according to the request from the project and with the addition of the
hydrostatic calculation that we provide for this type of PE shaft).
• Installation of shafts is possible as standard up to a depth of 6 m in areas with high groundwater
(up to max. 5 m).
• Great stability when placing shafts in a construction pit because ofDETALJ
the flat bottom
PE 5G of the shafts.
RAVNE BAZE
• A simple subtype and consolidating of the shafts with backfill material due to the flat design of
DN 800
MJ.: 1:10
the bottom.
• The combination of inlet connections easily adapts to the needs of the project.
• Possibility of making additional connections to the bottom of the shafts.
• The shaft trough is perfectly smooth and dimensionally-adjusted to inlet-outlet connections.

The body of the inspection shafts can be made of reinforced rotoliv rings or of ribbed PE / PP pipes
(SN 4 or SN 8).

5G shaft bottom cross section Otvor za punjenje


Filling hole Otvor za punjenje
Filling hole

High density polyethylene


DETALJ PE 5G RAVNE BAZE
DN 1000
MJ.: 1:10
Poliuretan
Polyurethane
DN

Beton Concrete
*količina*the amount of
betona
concrete prema
needed to
proračunu (otpornosti)
prevent buoyancy
okna na isplivavanje

DN 800

Otvor za punjenje
Filling hole Otvor za punjenje
Filling hole

Polyurethane
Poliuretan
DN

Polyurethane filler
concrete with the
addition of polyurethane Nacrt je vlasni�tvo Vodoplast prometa d.o.o. NAZIV:
i bez pristanka nije dopu�teno kopirati,
DISTRIBUTER:
PE 5G RAVNA BAZA S DVOSTRUKOM STIJENKOM
predati trećoj osobi ili na bilo koji drugi našin KINETE PUNJENE POLIURETANOM
zloupotrijebiti. DN 800
This drawing is the property of Vodoplast
Beton
promet d.o.o. and must not, without our PRILOG:
Concrete MJERILO: BROJ NACRTA:
*količina
consent betona
be *the
copied, prema
handed
amount of to other persons DETALJ 1 : 10 5G.2.D-01
orproračunu
otherwise (otpornosti)
misused!
concrete needed to
prevent buoyancy
okna na isplivavanje

DN 1000
TECHNICAL DATA

5G DN 625, 800, 1000 inspection shafts


Material: polyethylene and polypropylene. Possibility of making additional connections on
Inner diameters of the shafts: 625, 800, 1000. the perimeter of the shafts:
• od Ø 63 to Ø 200 by means of an inlet seal KS
Diameters of sewer pipes connections: or LKS; larger diameters are welded.
> Shafts DN 625 Minimum height: 0,5 m.
• Standard input and output connections: Maximum height: 6,0 m or by agreement.
Ø200, Ø250, Ø300 or blind connectors Easy height adjustment.
> Shafts DN 800 Ensuring the tightness of the connection of
• Standard input and output connections: shaft elements.
Ø200, Ø250, Ø300, Ø400 or blind connectors
> Shafts DN 800 Connection pipes:
• Standard input and output connections: • PVC- smooth pipes
Ø200, Ø250, Ø300, Ø400 or blind connectors • PE-smooth and ribbed pipes
• PP-smooth and ribbed pipes
Basic types of troughs: • all other sewer pipes (ductile, polyester, AC
and AB pipes, etc.)

0o

Combinations of input connectors:

90o 90o

45o 45o
0o
5/1
Standard inlet-outlet connections at the bottom of 5G shafts:

DN 625 DN 800 DN 1000


Inlet
Outlet 160 200 250 300 400 200 250 300 400 200 250 300 400
160
200
250
300
400
INSTALLATION
OF 5G INSPECTION SHAFT IN ROADS

LTŽ cover - cast

min. 50 mm
iron cover
20 - 50 mm AB relief plate

Fine asphalt

Rough asphalt

Tampon
mounting H

min. 500 mm
shaft H

Shaft body

The shaft is shrunk in 30 cm layers in the


area of 0.5 m around the shaft with:
• 0/16 crushed stone or
• 0/32 round grain and hardens to 97%
Inlet Outlet Proctor.

Soil

Bed of soil (made according to the


project instructions)
150 - 200 mm

March 2021 | We reserve the right to printing errors and technical changes. The sketches are for illustrative purposes only.

APLAST proizvodnja in trgovina d.o.o.,


Ložnica pri Žalcu 37, 3310 Žalec,
Slovenija | www.aplast.si

You might also like