Professional Documents
Culture Documents
Week 2 Activity
Week 2 Activity
DEPARTMENT OF EDUCATION
Region IX, Zamboanga Peninsula
DIVISION OF ZAMBOANGA DEL NORTE
LILOY NATIONAL HIGH SCHOOL
Liloy, Zamboanga del Norte
Name: Date:
Year & Section: Score:
Seven simple tools can be used by any professional to ease the quality improvement process: flowcharts,
check sheets, Pareto diagrams, cause and effect diagrams, histograms, scatter diagrams, and control charts.
1. Flowcharts describe a process in as much detail as possible by graphically displaying the steps in proper sequence.
2. Check sheets show how many times each value occurs, and their information is increasingly
helpful as more data are collected.
3. The Pareto diagram is named after Vilfredo Pareto, a 19th-century Italian economist who postulated
that a large share of wealth is owned by a small percentage of the population.
4. The cause and effect diagram are sometimes called an Ishikawa diagram after its inventor. It is
also known as a fish bone diagram because of its shape. A cause and effect diagram describes a
relationship between variables.
5. The histogram plots data in a frequency distribution table. What distinguishes the histogram from
a check sheet is that its data are grouped into rows so that the identity of individual values is lost.
6. A scatter diagram shows how two variables are related and is thus used to test for cause and effect
relationships.
1
7. A control chart displays statistically determined upper and lower limits drawn on either side of a
process average.
I. Directions: Arrange the scrambled letters to form a word below by understanding the given
meaning of the correct term. Write your answer on a separate sheet of paper.
1. Shows how two variables are related and is thus used to test for cause and effect relationships.
CAETTRS IGDRMAA
2. A displays statistically determined upper and lower limits drawn on either side of a process
average.
TLNROOC ACHRT
3. Is initiated with a Quality Assessment Request, typically received from one or more project
stakeholders.
EASSSS LQATYIU
4. Plots data in a frequency distribution table.
STOHISRGMA
5. Concerned with transforming a range of inputs into those outputs that are required by the
market.
ODCOTNIRPU PCSOESR
II. Enumeration:
Prepared by:
REYMOND P. SUMAYLO
CSS Grade 9 - Teacher-In-charge