You are on page 1of 2

2.

(a) Write detailed note on the detection and prevention of Printed Pages—2 NAR206
wastage of water in the distribution system.
(Following Paper ID and Roll No. to be filled in your Answer Book)
OR
PAPER ID : 181211 Roll No.
(b) Describe the separate and combined system of sewerage.

3. (a) Describe various factors affecting storm water drainage. B.Arch.


OR (SEM. II) THEORY EXAMINATION 2013-14
ARCHITECTURAL SERVICES–I
(b) How would you determine Dry Weather Flow in sewerage
system ? Time : 3 Hours Total Marks : 50
4. Distinguish between the following (any four) : Note :– (1) Attempt all questions.
(a) Artesian spring and gravity springs. (2) Dimensioning and labelling should be done in all
(b) Arithmetical increase method and incremental increase drawings.
method of calculating future population. (3) Use appropriate scale, for drawings wherever not
(c) Water softening and disinfection of water. mentioned.

(d) Intermittent and continuous supply of water. (4) Assume any missing data.

(e) Air relies and check valve in water supply scheme. (5) Be precise in your answer.

5. Explain the following (any four) : (6) All questions carry equal marks.

(a) pH value of water. 1. (a) What are various considerations to be taken care of in
preparing a water supply scheme for a town ?
(b) Aquifers.
OR
(c) Bell and Spigot joint.

(d) Potable water. (b) Describe importance of rain water harvesting and give two
examples of rain water harvesting for direct and indirect
(e) Detention tank in treatment of water.
use with illustrations.

NAR206/DQJ-21263 2 400 NAR206/DQJ-21263 1 [Turn Over


2. (a) Write detailed note on the detection and prevention of Printed Pages—2 NAR206
wastage of water in the distribution system.
(Following Paper ID and Roll No. to be filled in your Answer Book)
OR
PAPER ID : 181211 Roll No.
(b) Describe the separate and combined system of sewerage.

3. (a) Describe various factors affecting storm water drainage. B.Arch.


OR (SEM. II) THEORY EXAMINATION 2013-14
ARCHITECTURAL SERVICES–I
(b) How would you determine Dry Weather Flow in sewerage
system ? Time : 3 Hours Total Marks : 50
4. Distinguish between the following (any four) : Note :– (1) Attempt all questions.
(a) Artesian spring and gravity springs. (2) Dimensioning and labelling should be done in all
(b) Arithmetical increase method and incremental increase drawings.
method of calculating future population. (3) Use appropriate scale, for drawings wherever not
(c) Water softening and disinfection of water. mentioned.

(d) Intermittent and continuous supply of water. (4) Assume any missing data.

(e) Air relies and check valve in water supply scheme. (5) Be precise in your answer.

5. Explain the following (any four) : (6) All questions carry equal marks.

(a) pH value of water. 1. (a) What are various considerations to be taken care of in
preparing a water supply scheme for a town ?
(b) Aquifers.
OR
(c) Bell and Spigot joint.

(d) Potable water. (b) Describe importance of rain water harvesting and give two
examples of rain water harvesting for direct and indirect
(e) Detention tank in treatment of water.
use with illustrations.

NAR206/DQJ-21263 2 400 NAR206/DQJ-21263 1 [Turn Over