Write short notes on any two of the following and support your Printed Pages—2 AR406
answer with sketches.
(Following Paper ID and Roll No. to be filled in your Answer Book)
(i) Water hammering in water supply scheme. (5)
PAPER ID : 181411 Roll No.
(ii) Water carriage system of sewerage. (5)

(iii) Why and where check valves are needed in water supply B.Arch.
scheme. (5) (SEM. IV) THEORY EXAMINATION 2013-14

(iv) Self cleansing velocity in sewer line. (5)


BUILDING SERVICES (WS)

4. Explain briefly the various stages involved in treatment of water Time : 3 Hours Total Marks : 50
in ‘Treatment Plant’. (10) Note :– (1) Question No. 1 is compulsory.
5. Explain various methods of Rain Water Harvesting. (10) (2) Answer four questions in all.
6. Differentiate the following (attempt any two) and support your (3) Illustrated answer will be given due credit.
answer with sketches. 1. Design a Personal toilet attached with Master bed room situated
(i) Sewer, sewage and sewerage. (5) at ground floor as mentioned below –
(ii) Temporary and permanent hardness of water. (5) W.C. (Indian) 1 No
(iii) Gravity springs and artesian springs. (5) W.C. European 1 No
(iv) Separate and combined system of sewerage. (5) Wash Basin 1 No
Shower Tray 1 No
Drawing requirements are as follows –
(a) Lay out plan showing the detail of various sanitary
appliances with their connectivity to the inspection chamber
to the private sewer line (Scale l:10) (12)
(b) Hot and Cold water supply to the required places in the
same plan. (8)
2. Why do we need to have protected water supply scheme, explain.
(10)

AR406/DQJ-21241 950 AR406/DQJ-21241 [Turn Over


3. Write short notes on any two of the following and support your Printed Pages—2 AR406
answer with sketches.
(Following Paper ID and Roll No. to be filled in your Answer Book)
(i) Water hammering in water supply scheme. (5)
PAPER ID : 181411 Roll No.
(ii) Water carriage system of sewerage. (5)

(iii) Why and where check valves are needed in water supply B.Arch.
scheme. (5) (SEM. IV) THEORY EXAMINATION 2013-14

(iv) Self cleansing velocity in sewer line. (5)


BUILDING SERVICES (WS)

4. Explain briefly the various stages involved in treatment of water Time : 3 Hours Total Marks : 50
in ‘Treatment Plant’. (10) Note :– (1) Question No. 1 is compulsory.
5. Explain various methods of Rain Water Harvesting. (10) (2) Answer four questions in all.
6. Differentiate the following (attempt any two) and support your (3) Illustrated answer will be given due credit.
answer with sketches. 1. Design a Personal toilet attached with Master bed room situated
(i) Sewer, sewage and sewerage. (5) at ground floor as mentioned below –
(ii) Temporary and permanent hardness of water. (5) W.C. (Indian) 1 No
(iii) Gravity springs and artesian springs. (5) W.C. European 1 No
(iv) Separate and combined system of sewerage. (5) Wash Basin 1 No
Shower Tray 1 No
Drawing requirements are as follows –
(a) Lay out plan showing the detail of various sanitary
appliances with their connectivity to the inspection chamber
to the private sewer line (Scale l:10) (12)
(b) Hot and Cold water supply to the required places in the
same plan. (8)
2. Why do we need to have protected water supply scheme, explain.
(10)