LAND ACQUISITION AND UTILITY SHIFTING ESTIMATE STATUS REPORT Dated: 04.08.

2021
Ram Van Gaman Marg NH731A is to be developed in three packages
Pkg-I from Ch. KM 0.000 to KM 35.000 (Mohanganj to Autarpur)
Pkg-II from Ch KM 35.000 to KM 64.682 (Autarpur to Muratganj)
Pkg-III from Ch KM 64.682 to KM 112.000 (Muratganj to Rajapur)
Land Acquisition:
Timeline for Land Acquisition process

Nomination 3A sign by 3A 3C
S.No. Pkg of CALA 3a upload 3a publish CALA 3A upload 3A Publish newspaper completion 3D sign CALA 3D upload 3D Publish
1 I 13.08.2021 15.08.2021 14.09.2021 14.09.2021 16.09.2021 23.09.2021
2 II 05.08.2021 12.08.2021 12.08.2021 14.08.2021 20.08.2021 22.08.2021 21.09.2021 25.09.2021 28.09.2021 30.09.2021
3 III 05.08.2021 20.08.2021 02.09.2021 02.09.2021 03.09.2021 10.09.2021 12.09.2021 11.10.2021 11.10.2021 14.10.2021 21.10.2021
CALA appointment :- Pratapgarh- CRO appointed on 09.04.2021
Prayagraj- SLAO Nagar Mahapalika appointed on 20.07.2021
Kaushambi- Dy. Collector Sh. Rajesh Chandra appointed on 02.08.2021
Appointment of CALA for Chitrakoot in progress may be done on 05.08.2021.
For Fatehpur the CALA appointment is in progress may be done by 05.08.2021

Pkg-I
For Pkg-I from Ch. KM 0.000 to KM 35.000 (Mohanganj to Autarpur) there is total 2.7283 Hac of land is to be acquired for which Section 3(A) of
National Highway Act, 1956 has been uploaded on Bhoomi Portal on 31.07.2021.
Pkg-II
For Pkg-II from Ch KM 35.000 to KM 64.682 (Autarpur to Muratganj) there is total of 156.399 Hac (tentative) land is proposed to be acquired as
per DPR submitted by consultant for which Section 3(a) is under preparation and shall be uploaded by 12.08.2021.
Pkg-III
For Pkg-III from Ch KM 64.682 to KM 112.000 the preparation of DPR is in progress and expected to be submitted by 15.08.2021. 3(a)
preparation is in progress.

Status of 3(a)/3(A)/3(C)/3(D)-
Pkg-I – 3(A) Uploaded on Bhoomi Portal on 31.07.2021
Pkg-II—3(a) is under correction preparation. Shall be uploaded by 12.08.2021.
Pkg-III—3(a) is under preparation. Shall be uploaded by 25.08.2021.
Utility shifting status of PKG-I, PKG-II, PKG-III
Chainage (Km) Joint Status
Sr. Department Name of Contact
Tehsil District Inspection Designation
No /Division Officer Details
From To Date
Pkg-I
UPPCL, EDD Estimate Obtained
1 0.000 35.000 Lalganj Pratrapgarh - - - -
Lalganj 29.06.2021
UP jal
2 0.000 35.000 Nigam, Lalganj Pratrapgarh - - - - Estimate Obtained
Pratapgarh
Pkg-II
UPPCL
Mr. Pradeep
JE, Kunda 9453047637 Joint Inspection on
Maurya
1 35+000 43+500 UPPCL Kunda Pratapgarh 31/07/21 31.07.21, Expected by
Mr. Umakant
Kumar
EE, Kunda 9450963894 07.08.21
Mr. Jang JE,
Phaphamau 9839104021
Bhadur Joint Inspection- 28.07.21,
3 43+500 49+500 UPPCL Phaphamau Prayagraj 28/07/21
EE, Expected date-07.08.21
Mr. Kumar
Phaphamau 9450963684
Joint Inspection- 16.07.21,
Mr. Akash EE informed that JE is
4 49+500 71+500 UPPCL Chayal Kaushambi 16/07/21 JE, Chayal 9260900851
Singh Admitted in Hospital.
Expected 07.08.21
Jal Nigham

Mr. Niranjan JE, Joint Inspection on


Phaphamau 8931812919
Verma 28.07.21,
Status- Informed on
Phaphamau 20.08.21 that inspection
2 35+000 49+000 Jal Nigam Prayagraj 28/07/21
CD-6 Jhunsi to be done again on Xing
Mr. Amit AE,
9473942662 and culvert is to be
Kumar Phaphamau
proposed.
Reinspection 05.08.21
done.
Mr. Shivam Joint Inspection- 16.07.21,
JE, Bharwari 9919864013
Yadav Status- informed on
Mr. Pankaj 02.08.21 that there is
patel
AE, Bharwari 8887833522
some confusion at site.
Need inspection again
5 49+500 77+500 Jal Nigam Bharwari Kaushambi 16/07/21
Reinspection 05.08.21
done.

Pkg-III
UPPCL
Mr.
JE,
71+500 109+000 UPPCL Manjhanpur Kaushambi 16/07/21 Chandrika 6393028608
Maurya
Manjhanpur Estimate Obtained on
6
Mr. Ankit EE, 03.08.21
Manjhanpur 9450963681
Kumar
05/08/21Letter
7 109+000 112+750 uppcl Rajapur chitrakoot
write to ee

Jal Nigham
Mr. Pankaj Joint Inspection- 16.07.21,
JE, Bharwari 9889309033
Kumar Patel Status- informed on
02.08.21 that there is
some confusion at site.
7 77+500 109+000 Jal Nigam Bharwari Kaushambi 16/07/21
Need inspection again
Mr. Rajesh
JE, Bharwari 9532247224 Reinspection 05.08.21
Kumar
done.

Chief Engineer- Sh. Vinod Kumar- 9450964444 for all Electrical utilities(Chayal, Phaphamau & Manjhanpur)