You are on page 1of 49

Performance Management

ACCA
Performance Instructor
Management Rizwan Maniya
Email - Rizwan@vifhe.com Instructor - Rizwan Maniya WhatsApp Number +923212436266
Performance Management

About My Self
1. Teaching ACCA from last 14 years
2. Subject's specialist if ACCA PM, FM & APM
3. Currently teaching physically at KnS School of Business Studies
4. Have produced various Global and Nationwide position holder in PM, FM, APM

Paper Introduction
Advance of Paper MA
Transition for F2
1. Expectation
2. Question types
3. Exam timing
Email - Rizwan@vifhe.com Instructor - Rizwan Maniya Whatsapp -923212436266
Performance Management

Paper Structure Section Wise


Section A Section B Section C
15 OT Questions 3 Case Style Questions 2 Contructed response
Sections 2 marks each 10 marks each Questions
(15 x 2) 30 Marks (10 x 3) 30 Marks
Advanced Costing
Yes Yes No
Techniques
Decision Making
Yes Yes Yes

Budget & Control Yes Yes Yes


Performance Measurement
Yes Yes Yes

The two 20-mark questions will come from decision making techniques, budgeting and control and/or
performance measurement and control areas of the syllabus. These questions may also include requirements
related to the information systems area of the syllabus.
Email - Rizwan@vifhe.com Instructor - Rizwan Maniya WhatsApp Number +923212436266
Performance Management

PM Passing Rates - Last 5 attempts


Sep 2019 41
Dec 2019 38
March 2020 35
Sep 2020 39
Dec 2020 40
March 2021 44
June 2021 41
Email - Rizwan@vifhe.com Instructor - Rizwan Maniya WhatsApp Number +923212436266
Performance Management

1. The Session will be 30% Knowledge and 70% Practice Based


2. All key areas of the syllabus will be discussed with practice
3. The session will equally focus on Objective Test and Constructed response questions
4. The session will equally focus on Calculations and Theory
5. There will be significant focus of examination techniques and how to gain easy marks
6. The marking scheme will be discussed in order to make it clear how to approach the
answer
7. Examiner reports and technical articles will be used
8. Objective test question bank will be used which will be like exam environment
9. Constructed response questions will be solved using spread sheets and word processing
sheets using ACCA Platform

Email - Rizwan@vifhe.com Instructor - Rizwan Maniya WhatsApp Number +923212436266


Performance Management

1. Candidates do not read the scenario actively


2. Candidates do not understand question requirements
3. Candidates are struggling to use spread sheets to optimum
4. Candidate do not relate answers with scenario
5. Candidates are struggling in theory based Objective test questions
6. Candidates are facing time management issue
7. Candidates are not covering the entire syllabus
8. Candidates are not focusing on gaining easy marks.
9. Candidates are lacking examination technique

Email - Rizwan@vifhe.com Instructor - Rizwan Maniya Whatsapp -923212436266


Performance Management

Tips & Tricks Section A


• Cover the whole syllabus

• 3.6 Minutes per question

• Please take care with Fill in the Blank questions which have rounding instructions as
you want to ensure that the answer you input meets those rules.

• Read the question carefully and if it is a narrative OT read all the distractors
carefully. Ensure you follow the instructions in the question on how to answer the
question as different question types will require different interactions.

Email - Rizwan@vifhe.com Instructor - Rizwan Maniya Whatsapp -923212436266


Performance Management

Tips & Tricks Section B


• Actively read scenario-based questions, highlighting the information that is
relevant for each part of the requirement

• Please take care with Fill in the Blank questions which have rounding instructions as you
want to ensure that the answer you input meets those rules.

• Complete in 18 Minutes

Email - Rizwan@vifhe.com Instructor - Rizwan Maniya Whatsapp -923212436266


Performance Management

• Tips & Tricks Section C


Follow instructions given in questions & Understand requirements

• The verbs used in the requirements not only indicate what to do, but often how
much detail to go in to (State & Explain)

• Look for extra requirements (and)

• Look at the number of marks

• Complete in 36 Minutes

• Perform calculations that are carefully structured and clearly set out, with all workings shown in
an easy-to-follow layout.

• Write accurately and coherently, using simple English rather than long, rambling sentences
which have no structure and no real content

Email - Rizwan@vifhe.com Instructor - Rizwan Maniya Whatsapp -923212436266


Performance Management

Email - Rizwan@vifhe.com Instructor - Rizwan Maniya WhatsApp Number +923212436266


Performance Management

Budgets types

Fixed Flexible Incremental Zero based Activity based


Rolling Budget
Budget Budget Budget Budget Budget

Fixed Budget Fixed Budget

1. Single activity level budget 1. Prepared at different activity


levels
2. Control fixed cost
2. Prepared at actual activity
level(Flexed Budget)
Purpose is like with like controlling

Email - Rizwan@vifhe.com Instructor - Rizwan Maniya WhatsApp Number +923212436266


Performance Management

Budgets types

Incremental
Budget
Budgets start from previous period budget or actual results

Cover inflation Incorporates Known changes

Useful - Stable Conditions


Advantages Disadvantages
1. Less time consuming activity as only increment 1. Prior period issues and uneconomic activates will
requires justification. continue in next period
2. It encourages wasteful spending to ensure the budgets
are met.

Email - Rizwan@vifhe.com Instructor - Rizwan Maniya WhatsApp Number +923212436266


Performance Management

Budgets types

Zero based
budget
The budgeting process starts from scratch which requires justification relating to every activity
Useful - Discretionary cost & Public sector organization
Steps
Decision package states the purpose of the activity
Evaluate and rank each package
On the basis of ranking allocate the resources.

Advantages Disadvantages
1. Efficient allocation of resources as it remove wasteful 1. Time consuming and costly budget
spending and uneconomic activities 2. Ranking activities may be difficult when the activity
2. Staff involvement increases benefits are of qualitative nature
3. Managers consider alternatives 3. Decision packages requires skills which manager need
to have to prepare decision packages

Email - Rizwan@vifhe.com Instructor - Rizwan Maniya WhatsApp Number +923212436266


Performance Management

Budgets types

Rolling Budgets

Budgets which is regularly updated by adding a further period once the previous period has expired

Useful – Dynamic
conditions

Advantages Disadvantages
1. Reduces uncertainty 1. Time consuming and costly activity
2. More realistic budgets are prepared 2. Provides less opportunity to control actual
3. Control will be based on recent plan results due to frequent budgeting

Email - Rizwan@vifhe.com Instructor - Rizwan Maniya WhatsApp Number +923212436266


Performance Management

Budgets types

Activity based
Budgets

Budgeting approach in which budgets are made for each overhead activity

Advantages Disadvantages
1. The budgets focuses on activities 1. This budgeting approach is costly and time
2. Its provides opportunity to control consuming as budgets will be prepared for
overhead cost by controlling the activity each over head activity
level

Email - Rizwan@vifhe.com Instructor - Rizwan Maniya WhatsApp Number +923212436266


Performance Management

Learning Curves
Define
• First time the production time will be highest
• Repetition of job will reduces the time
• Learning process will stop eventually
Calculations
Double approach Previous average x LR
Log approach y= ax^b

Limitations
• Labour intensive environment
• Stable conditions
• Work is repetitive and labour turnover is low

Budgets affected
Labour Budget Overhead Budget Production Budget
Material Usage Budget Material Purchase Budget Cash Budget
Email - Rizwan@vifhe.com Instructor - Rizwan Maniya WhatsApp Number +923212436266
Performance Management

Spread sheets
Define
• Used to build models in which data is presented by rows and columns
• These spread sheets are used for analyzing and manipulating the data
Advantages Disadvantages
Simplify and saves time Error can be done

Over dependent risk


Different budget options
Qualitative factors
Sensitivity analysis
Security issues

Corrupt a model
Email - Rizwan@vifhe.com Instructor - Rizwan Maniya WhatsApp Number +923212436266
Performance Management

Variances Favourable Adverse

• CHEAPER MATERIAL IS • CHEAPER MATERIAL IS


Material Mix USED MORE USED LESS
• EXPENSIVE MATERIAL IS • EXPENSIVE MATERIAL IS
1. More than one material USED LESS USED MORE
input

• Cheaper material is used less and • Cheaper material is used more


and expensive material is used
2. Material are expensive material is used more
Material Yield interchangeable • Good control over production less
process • Poor control over production
process

• WHEN MORE PROFITABLE • WHEN MORE PROFITABLE


PRODUCT SOLD MORE PRODUCT SOLD LESS
Sales Mix
1. More than one product • •
LESS PROFITABLE PRODUCT LESS PROFITABLE
SOLD LESS PRODUCT SOLD MORE
sold
2. Products are • DECREASE IN PRICE • INCREASE IN PRICE
interchangeable • FAVORABLE MARKET • ADVERSE MARKET
Sales Quantity CONDITIONS CONDITIONS
• GOOD QUALITY PRODUCT • POOR QUALITY PRODUCT

Email - Rizwan@vifhe.com Instructor - Rizwan Maniya WhatsApp Number +923212436266


Performance Management

Formula
Material Mix Variance
Actual Input in Actual Input Quantity Std Rate Cost
Standard Mix in Actual Mix Variance per input Variances
material

Material Yield Variance


Std . Input in Actual Input Quantity Std Rate Cost
Standard Mix in Std. Mix Variance per input Variances
material

Email - Rizwan@vifhe.com Instructor - Rizwan Maniya WhatsApp Number +923212436266


Performance Management

Formula
Sales Mix Variance
Actual Sales in Actual Units Std Con/ Con/ Profit
Actual Mix Sales in Std Variance Profit per Variances
Mix unit

Quantity Variance
Actual Sales in Std Sales in Units Std Con/ Con/ Profit
Std Mix Std mix Variance Profit per Variances
unit

Email - Rizwan@vifhe.com Instructor - Rizwan Maniya WhatsApp Number +923212436266


Performance Management
Material price variance Material usage variance
(Original Standard price per kg - actual price per Standard price per kg ( Original Standard quantity
kg) x actual material quantity purchased/consumed allowed - actual quantity) Where standard quantity
allowed = standard kg per unit x actual units
Variances Planning - Planning Errors Operational - Real Performance
Formula
Planning price variance Operational Price variance
(original standard price – revised (revised standard price – actual
Material Price
standard price) x actual quantity price) x actual quantity

Planning usage variance Operational Usage variance


Original Standard price per kg x Original Standard price per kg x
Material
Usage (original standard quantity (revised standard quantity allowed –
allowed – revised standard actual quantity)
quantity allowed)
NOTE the Shortcut - Planning Variance - O vs R
Operational Variance - R vs A
Email - Rizwan@vifhe.com Instructor - Rizwan Maniya WhatsApp Number +923212436266
Performance Management Labour rate variance Labour efficiency variance
(Original Standard rate per hour - Actual Standard rate per hour x (Original
rate per hour) x ctual hours paid Standard hours allowed - actual hours
worked)Where standard hours allowed =
standard hours per unit x actual units
Variances Planning - Planning Errors Operational - Real Performance
Formula
Planning rate variance Operational rate variance
(Original standard rate – Revised (Revised standard rate – Actual
Labour Rate standard rate) x actual hours rate) x actual hours

Planning efficiency variance Operational Usage variance


Original Standard rate per hour x Original Standard rate per hour x
Labour (Original standard hours allowed – (Revised standard hours allowed –
Efficiency Revised standard hours allowed) Actual hours)

NOTE the Shortcut - Planning Variance - O vs R


Operational Variance - R vs A
Email - Rizwan@vifhe.com Instructor - Rizwan Maniya WhatsApp Number +923212436266
Performance Management

Sales price variance Sales volume variance


(Actual price - Original standard Standard profit per unit x ( Actual
price) x actual units sold units - Original Standard units)
Variances Formula Planning - Planning Errors Operational - Real
Performance
Revised selling price per unit (Actual selling price per
– Original standard selling unit – Revised selling
Sales Price price per unit) x Actual units price per unit) x Actual
sold units sold

Standard profit /contribution Standard profit


per unit (Revised standard /contribution per unit
Sales Volume
sales units – Original standard (Actual sales units –
sales units) Revised sales units)
NOTE the Shortcut - Planning Variance - R vs O
Operational Variance - A vs R

Email - Rizwan@vifhe.com Instructor - Rizwan Maniya WhatsApp Number +923212436266


Performance Management
Beyond Budgeting
Problems of traditional budget
Timeconsuming Share holder value Prevent flexibility
Meeting target Sales targets Unethical behavior
Difference between traditional and beyond budgeting model
Traditional budgeting Beyond budgeting
Budget type Fixed annual plan Rolling budget, continuous
planning
Targets & rewards Incremental targets Relative target and rewards
Fixed rewards
Resources Pre-defined resources On demand resources
Culture Centralization and focus Decentralization and focus
on numbers of value creation

Email - Rizwan@vifhe.com Instructor - Rizwan Maniya WhatsApp Number +923212436266


Performance Management

Email - Rizwan@vifhe.com Instructor - Rizwan Maniya WhatsApp Number +923212436266


Performance Management

Profit maximization Cost minimization


Steps
NON-GRAPHICAL STEPS GRAPHICAL STEPS
1. DEFINE VARIABLES 1. CONVERT INEQUALITIES INTO EQUALITIES
2. CONSTRUCT OBJECTIVE FUNCTION 2. GRAPH EACH EQUATION
3. IDENTIFY AND CONVERT CONSTRAINTS INTO
3. IDENTIFY FEASIBLE REGION
INEQUALITIES
4. IDENTIFY NON-NEGATIVE CONSTRAINTS 4. IDENTIFY POINTS IN THE FEASIBLE REGION

DETERMINE OPTIMUM POINT


BY INSPECTION METHOD ISO CONTRIBUTION / COST LINE

Additional contribution earned if one extra unit of scarce resource becomes available
Shadow price at its original cost.

Slack
16/08/2021
Amount by which the resources is under-utilized

Email - Rizwan@vifhe.com Instructor - Rizwan Maniya WhatsApp Number +923212436266


2Performance Management
7
CALCULATION
Weighted average C/S Ratio
Weighted average
Weighted average break even
Average C.P.U Average S.P
Weighted average margin of Total contribution for all products Total sale revenue for all products
safety
Total no of units Total no of units

Target profit
GRAPHS
Multi Product Break even
1. Sales revenue line
2. Fixed cost line
3. Total cost line

Multi Product Contribution


1. Sales revenue line
Multi Product Profit/Volume
1. Highest C/S ratio line
2. Variable cost line
2. Constant mix line
3. Total cost line

Email - Rizwan@vifhe.com Instructor - Rizwan Maniya WhatsApp Number +923212436266


Performance Management

1. Price or demand function


2. Profit maximisation
• Alegebriac Approach - MC = MR
• Tabular Aprroach

Price skimming: Charging high prices at initial Price penetration: Charging low prices at the
phase of the product life cycle. initial phase of the product life cycle.
Conditions Conditions
a. Product life cycle is short a. Target is of higher market share
b. Inelastic demand b. Elastic demand
c. Production is limited at early stage c. Discourage competition
d. When there are barriers for competitors d. Quickly want to move to growth & maturity
stages
Email - Rizwan@vifhe.com Instructor - Rizwan Maniya WhatsApp Number +923212436266
Performance Management

Relevant IRRelevant
Incremental cost / Income Sunk Cost

Opportunity cost Committed Costs

Notional costs

Re-apportionment of
existing fixed costs

One Off Contract Make or Buy


Decision
Shut Down Decision Further Processing
Decision
Email - Rizwan@vifhe.com Instructor - Rizwan Maniya WhatsApp Number +923212436266
Performance Management

Risk - With probability


Uncertainty - Without probability

Decision makers Risk seeker, Risk Averse, Risk neutral, Sore loser

Techniques
Expected value Long term average

Decision Rule
Maxi max Maxi min Mini max regret rule

Maximum from maximum Maximum from minimum Minimum from maximum regrets

Sensitivity analysis Identify critical variable

Simulation Deal with multiple variable

Type of tree-diagram used in determining the optimum course of action, in


Decision tree
situations having several possible alternatives with uncertain outcomes
Email - Rizwan@vifhe.com Instructor - Rizwan Maniya WhatsApp Number +923212436266
Performance Management

Email - Rizwan@vifhe.com Instructor - Rizwan Maniya WhatsApp Number +923212436266


Performance Management

Critical Success Factors are strongly related to the mission and strategic goals of your business
or project. Critical Success Factors focus on the most important areas and get to the very heart
of both what is to be achieved and how you will achieve it.

Key performance indicators


Measure whether CSF will be achieved or not

Financial indicators Non- Financial indicators

Strike a balance

Email - Rizwan@vifhe.com Instructor - Rizwan Maniya WhatsApp Number +923212436266


Performance Management

Performance measurement

Financial Indicators Non-Financial Indicators

Financial Ratios

Profitability Ratios Gearing Ratios Investor ratios

Note
Critical Success Factors – Key areas of the business
Key Performance Indicators – Measure CSF achievement

Email - Rizwan@vifhe.com Instructor - Rizwan Maniya WhatsApp Number +923212436266


Performance Management

Performance measurement
Profitability Ratios

Return on capital employed Profit margin


(Operating profit) x 100
Capital employed

Gross profit Net profit


Asset turnover margin margin
Operating profit
Sales_____ Gross profit x Net profit x 100
margin
Capital employed 100 Sales
Operating profit x 100 Sales
Sales

Earning per share


Profit after tax and preference dividend
Number of shares

Email - Rizwan@vifhe.com Instructor - Rizwan Maniya WhatsApp Number +923212436266


Performance Management

Performance measurement
Liquidity Ratios

Current ratio: Current Asset Quick Ratio: Current Asset – stock


Current liabilities Current liabilities

Inventory holding period


Inventory X 365
Cost of sales

Account payable payment period Account Receivable collection period:


Trade payables x 365 Trade receivables x 365
Cost of sales Credit sales

Email - Rizwan@vifhe.com Instructor - Rizwan Maniya WhatsApp Number +923212436266


Performance Management

Performance measurement
Risk related
ratios

Financial gearing Interest cover


PBIT
Finance cost

Debt x 100 Debt x 100


(Debt + equity) Equity

Operational gearing

Fixed cost
Total cost

Email - Rizwan@vifhe.com Instructor - Rizwan Maniya WhatsApp Number +923212436266


Performance Management

Performance measurement
Non financial indicators

Balance Score Card


Financial perspective Customer perspective
Measures shareholder value creation Measures customer satisfaction
Example: Examples:
1. Return on capital employed 1. No. Repeat Customers
2. Profit Margin 2. % Customer complains

Internal perspective Innovation and learning


Measures efficiency of process Measures how business is developing it self for future
Examples: Examples:
1. % System down time 1. % Revenue form new products
2. Labour tunover 2. No staff training hours

Email - Rizwan@vifhe.com Instructor - Rizwan Maniya WhatsApp Number +923212436266


Performance Management

Performance measurement
Non financial indicators

Building Block Model – Service


Industries
Dimensions(CSF)
1. Financial performances
2. Competitiveness
3. Quality
4. Resource utilization
5. Flexibility
6. Innovation
Standards(KPI) Rewards
1. Ownership 1. Clarity
2. Achievable 2. Motivation
3. Equity 3. Controllability

Email - Rizwan@vifhe.com Instructor - Rizwan Maniya WhatsApp Number +923212436266


Performance Management

It represents the revenue per unit from the supplying division and cost per unit for
receiving division.
Objectives of transfer pricing system
Goal Performance
Autonomy
congruence measurement
Types of transfer pricing

✓ General rule (Theoretical transfer price)


(Marginal cost + opportunity cost)
✓ Market prices
✓ Adjusted Market Price
✓ Cost based approach
Marginal cost Total cost Total cost plus
Email - Rizwan@vifhe.com Instructor - Rizwan Maniya WhatsApp Number +923212436266
Performance Management

Revenue Profit Investment


Cost center
center center center

Return on Residual
investment Common problems income

Manipulation Aging of asset


Email - Rizwan@vifhe.com Instructor - Rizwan Maniya WhatsApp Number +923212436266
Performance Management

Evaluate the efficiency of an investment or to compare the efficiency of a number of


different investments

Formula

Advantages Disadvantages
Relative measure Correlation
Easily understood Dysfunctional
behavior
No need for COC
Email - Rizwan@vifhe.com Instructor - Rizwan Maniya WhatsApp Number +923212436266
Performance Management

Investment can earn over the minimum rate of return

Formula
Advantages Disadvantages
Correlation No comparing

Dysfunctional
Does not relate
behavior

Email - Rizwan@vifhe.com Instructor - Rizwan Maniya WhatsApp Number +923212436266


Performance Management

Email - Rizwan@vifhe.com Instructor - Rizwan Maniya Whatsapp -923212436266


Performance Management

Activity based costing


Method of allocating overhead costs to products and services

Cost pool Cost driver

Steps

✓ Identify cost pools and their allocated cost


✓ Identify logical cost drivers for each cost pools
✓ Calculate overhead absorption rate for each cost pools
✓ Absorb overheads into the individual products by using the rates
calculated in step 3.
Advantages Disadvantages
1. Fair allocation 1. Insignificant overheads
2. Significant overheads 2. Production related
3. Cost control 3. Detailed accounting records
4. All Overheads not production 4. Cost may exceed benefit
Email - Rizwan@vifhe.com Instructor - Rizwan Maniya Whatsapp -923212436266
Performance Management

Ways to close
Steps
Market price • Cheaper material
Desired profit
Maket Price - Desired Profit
• Reduce material losses
Target cost
Current cost
• Cheaper labour
Cost gap Current cost – Target cost • Labour training
• Reduce overhead by ABC
• Move to machine intensive
Difficult in services
Advantages • Economies of scale
industry
• Price • Value analysis
Characteristics Qualitative
• Working method Information
Simultaneity
• Customer Heterogeneity
requirement Intangible
• Cost reduction Perishability

Email - Rizwan@vifhe.com Instructor - Rizwan Maniya Whatsapp -923212436266


Performance Management

Definition Entire life Revenue Entire life cost True profitability

Stages Advantages
Development
Introduction Pricing decision
Growth Eight to ninety
Maturity Right decision
Decline Target cost
Short life cycle

Email - Rizwan@vifhe.com Instructor - Rizwan Maniya Whatsapp -923212436266


Performance Management

Through put accounting ratio


Throughput per unit
Hours per unit Decision rule

Throughput accounting ratio = Throughput per hour


Operating expense If TPAR > 1 : Feasible to make the
per hour product
If TPAR < 1 : Not feasible to make
Total operating
Ways to improve TPAR:
expenses
Total hours 1. Increase selling price per unit
2. Decrease material cost per unit
3. Decrease time to make each unit
4. Decrease the operating expense

Email - Rizwan@vifhe.com Instructor - Rizwan Maniya Whatsapp -923212436266


Performance Management

Multi Product Decision making

1. Contribution per unit 1. Throughput per unit


2. Contribution per limiting factor hour 2. Through Put per limiting factor hour
3. Ranking 3. Ranking
4. Devise optimum production plan 4. Devise optimum production plan

Email - Rizwan@vifhe.com Instructor - Rizwan Maniya Whatsapp -923212436266


1Performance Management
6
/
0 Internal Cost External Cost
8
/ •Improved systems and checks in order to avoid •Usage of energy and water
2 penalties •Forest degradation
0
2
•Waste disposal cost •Health care costs
1 •Product take back cost •Carbon emission cost
•Regulatory cost such as taxes
•Back end cost such as decommission cost, disposal of
inventory
ACCOUNTING FOR ENVIRONMENTAL COST
Input/outflow analysis
This technique records material inflows and balances this with outflows on the basis that, what comes in, must go out.

Flow cost accounting


This technique uses not only material flows but also the organizational structure. It divides the material flows into three categories: material, system and delivery and
disposal

Environmental Activity-based costing


In an environmental accounting context, it distinguishes between environment-related costs, which can be attributed to joint cost centers, and environment
driven costs, which tend to be hidden on general overheads
Lifecycle costing
Within the context of environmental accounting, lifecycle costing is a technique which requires the full environmental costs, arising from production of a product to
be taken account across its whole lifecycle.
Email - Rizwan@vifhe.com Instructor - Rizwan Maniya Whatsapp -923212436266

You might also like