Professional Documents
Culture Documents
00B
00B
Reference
To be confirmed if drawings list
this area is new
to be
scope by JO
furnish as
per 00B
requirement
for
preparation
00B
00B of this
layout.
JO to furnish following point for design the
Electrical and Pipe rack:
Instrumentation 1) Wall way to be provided.
Provide tag number and add cable tray to be
into equipment list.
2) Access way to be provided.
located. 3) U/G corridor to be indicated.
00B
To be check to the latest revision
PFD and PID for clarify Future space on the rack to be shown.
(Typical).
4) Operating Platform to be provided. if any
General Notes:
1. To ensure check all coordinates refer to FEED drawing for reference (Typical).
2. Provide equipment list refer to the latest PFD and P&ID. 5) Anchor bay location to be furnished.
3. Provide reference for any existing facilities in the Plot Plan drawing. 6) JO to provide UDL (uniform distributed
4. To ensure update and incorporated all of comments refer to MOM of Plot Plan Review meeting in this area. Load) sheet for each section of rack for PMC
5. Provide important dimensions in the plot plan drawing including overall battery limit, equipments, platforms, review.(Typical).
sleepers, road width etc. 6) Structural expansion to be located.
6. Indicate which is the new facilities and existing facilities with cloud for more clearly in plot plan drawing see Doc. 7) Fire proofing to be furnished.
26071-100-3DI-G04-00001.
8) Grid number should be checked and
7. To ensure all equipments, Platforms, access platforms, roads and any facilities shown in the Plot Plant drawing shall PERTAMINA
9. To ensure design of Pipe Rack available 25% allowance space for FUTURE