Professional Documents
Culture Documents
COMMISSIONING
No Time Place to meet PIC Sub System Sub System Description Remarks Permit No
1 08:00:00 AMSR1 Ye Lin 871.01 11KV Main Switchboard No.1 System Support Operation CP2783
2 08:00:00 AMSR2 Ye Lin 871.02 11KV Main Switchboard No.2 System Support Operation CP2784
3 08:00:00 AMSR3 Ye Lin 871.03 11KV Main Switchboard No.3 System Support Operation CP2785
4 08:00:00 FMSR2 Ye Lin 865.11 3000KVA 690VAC Fwd Main SWBD Support Operation CP2798
Transformer No.2 System
5 08:00:00 TMSR2 Ye Lin 865.17 690VAC Main SWBD Topside Transformer #2 Support Operation CP2799
System
6 08:00:00 ER#3 Nay Lynn Ko 861.05 Power Gen System Main Gen Skid No.5 DG Operation
7 08:00:00 ER#3 Nay Lynn Ko 861.06 Power Gen System Main Gen Skid No.6 DG Operation
8 09:00:00 Accumulator Room Shobin 332.02 BOP and Diverter Control System Acc bank precharging,Fresh water flushing, CP-2804
Taking sample of Erifon and Glycol prior to
filling point
9 09:00:00 Mud Pump Room Lai Qili 325.01 High Pressure Mud System Precom by vendor CP-2819
10 09:00:00 Mud Pump Room Naren 325.02 Low Pressure Mud Charging System Precom by vendor CP-2822
11 09:00:00 AMP room Win Myint 324.02 Mud Agitators System Pill Pits and Slug Pits Agitators Comm (Req CP-2858
TOI)
12 09:00:00 Mud Pump Room Naren 324.03 Reserve Mud Transfer System Precom by vendor CP-2824
13 09:00:00 Mud Pump room Naren 324.01 Low Pressure Mud Mixing System Precom by vendor CP-2821
14 09:00:00 AMP room Zaw Lin Tun 311.07 Smart Drilling Instrumentation System (SDI) Precom by vendor CP-2825
15 09:00:00 Mud Mixing Room Win Myint 322.01 Bulk Air System Comm. Required TOI CP-2859
16 09:00:00 DVR1 Ye Lin 865.13 6000KVA 690V Drilling VFD Transformer No.1 Support Operation CP2846
System
17 09:00:00 DVR2 Ye Lin 865.14 6000KVA 690V Drilling VFD Transformer No.2 Support Operation CP2847
System
18 09:00:00 DVR3 Ye Lin 865.15 6000KVA 690V Drilling VFD Transformer No.3 Support Operation CP2848
System
19 09:00:00 DVR 1 Ye Lin 877.01 690VAC Drilling VFD Switchboard No.1 System Pre-comm by vendor CP-2863
20 09:00:00 DVR 2 Ye Lin 877.02 690VAC Drilling VFD Switchboard No.2 System Pre-comm by vendor CP-2864
21 09:00:00 DVR 3 Ye Lin 877.03 690VAC Drilling VFD Switchboard No.3 System Pre-comm by vendor CP-2865
22 09:00:00 ESR Ye Lin 877.04 Energy Storage System Pre-comm by vendor CP-2866
23 09:00:00 LQ08 - DP Instrumentation rm Tan Qin Hui 419.04 Heading Reference System (Gyro) Pre-comm by vendor CP-2855
24 09:00:00 LQ08, FWD swbd rm Tan Qin Hui 419.01 Navigation System HAT test. TOI required CP-2868
Page 1 of 8
11-1116 ( TOI JURONG ESPADON-III #1 )
Daily activities summary list
Page 2 of 8
11-1116 ( TOI JURONG ESPADON-III #1 )
Daily activities summary list
DEENERGIZING
No Time Place to meet PIC Sub System Sub System Description Fr Equip Tag Description To Equip Tag Description
1 17:00:00 T1 Room Ye Lin 635.01B Thruster VFD No.1 System 871-EH-002 11KV MAIN SWBD #2 635-DX-001 THRUSTER #1 VFD
2 17:00:00 Thruster Room 3 Ye Lin 635.03B Thruster VFD No.3 System 871-EH-003 11KV MAIN SWBD #3 635-DX-003 THRUSTER #3 VFD
3 18:00:00 PM Drilling VFD Room 2 Ye Lin 865.14 6000KVA 690V Drilling VFD Transformer 871-EH-002 11KV MAIN SWBD #2 865-ET-020 DRILLING VFD
No.2 System TRANSFORMER #2
Page 3 of 8
11-1116 ( TOI JURONG ESPADON-III #1 )
Daily activities summary list
DEENERGIZING VALVE
No Time Place to meet PIC Sub System Sub System Description Valve Tag Description
1 Void Tank 6S Tun Lwin Aung 832.04 Hydraulic System For Remote Control Valve 801BFH023 10" ( ELECTRO-HYDRAULIC ACTUATED BUTTERFLY
#4 (Pump Room No.1) VALVE )
2 Void Tank 6S Tun Lwin Aung 832.04 Hydraulic System For Remote Control Valve 801BFH024 10" ( ELECTRO-HYDRAULIC ACTUATED BUTTERFLY
#4 (Pump Room No.1) VALVE )
3 Void Tank 6P / P&C TRK Tun Lwin Aung 832.06 Hydraulic System For Remote Control Valve 801BFH067 10" ( ELECTRO-HYDRAULIC ACTUATED BUTTERFLY
2 (PORT) #6 (Pump Room No.3) VALVE )
4 Void Tank 6P / P&C TRK Tun Lwin Aung 832.06 Hydraulic System For Remote Control Valve 801BFH068 10" ( ELECTRO-HYDRAULIC ACTUATED BUTTERFLY
2 (PORT) #6 (Pump Room No.3) VALVE )
5 Void Tank 6P / P&C TRK Tun Lwin Aung 832.06 Hydraulic System For Remote Control Valve 801BFH023 10" ( ELECTRO-HYDRAULIC ACTUATED BUTTERFLY
2 (PORT) #6 (Pump Room No.3) VALVE )
6 Void Tank 6P / P&C TRK Tun Lwin Aung 832.06 Hydraulic System For Remote Control Valve 801BFH024 10" ( ELECTRO-HYDRAULIC ACTUATED BUTTERFLY
2 (PORT) #6 (Pump Room No.3) VALVE )
Page 4 of 8
11-1116 ( TOI JURONG ESPADON-III #1 )
Daily activities summary list
ENERGIZING
No Time Place to meet PIC Sub System Sub System Description Fr Equip Tag Description To Equip Tag Description
1 09:00:00 AM Drilling VFD Room 1 Ye Lin 865.13 6000KVA 690V Drilling VFD Transformer 871-EH-001 11KV MAIN SWBD #1 865-ET-019 DRILLING VFD
No.1 System TRANSFORMER #1
2 09:00:00 AM Drilling VFD Room 2 Ye Lin 865.14 6000KVA 690V Drilling VFD Transformer 871-EH-002 11KV MAIN SWBD #2 865-ET-020 DRILLING VFD
No.2 System TRANSFORMER #2
3 09:00:00 AM Drilling VFD Room 3 Ye Lin 865.15 6000KVA 690V Drilling VFD Transformer 871-EH-003 11KV MAIN SWBD #3 865-ET-021 DRILLING VFD
No.3 System TRANSFORMER #3
4 09:00:00 AM AFT SWBD NO 2 Ye Lin 871.02 11KV Main Switchboard No.2 System 861-EG-003 ALTERNATOR #3 871-EH-002 11KV MAIN SWBD #2
5 09:00:00 AM AFT SWBD NO 2 Ye Lin 871.02 11KV Main Switchboard No.2 System 861-EG-004 ALTERNATOR #4 871-EH-002 11KV MAIN SWBD #2
6 09:00:00 AM AFT MSB ROOM 3 Ye Lin 871.03 11KV Main Switchboard No.3 System 871-EH-002 11KV MAIN SWBD #2 865-ET-014 690VAC MAIN SWBD
FWD TRANSFORMER
#2
7 09:00:00 AM AFT MSB ROOM 3 Ye Lin 871.03 11KV Main Switchboard No.3 System 871-EH-002 11KV MAIN SWBD #2 865-ET-017 690VAC MAIN SWBD
TOPSIDE
TRANSFORMER #2
8 09:00:00 AM AFT MSB ROOM 3 Ye Lin 871.03 11KV Main Switchboard No.3 System 865-ET-014 690VAC MAIN SWBD 875-EN-002 690VAC MAIN SWBD
FWD TRANSFORMER FWD #2
#2
9 09:00:00 AM AFT MSB ROOM 3 Ye Lin 871.03 11KV Main Switchboard No.3 System 865-ET-017 690VAC MAIN SWBD 875-EN-005 690VAC MAIN SWBD
TOPSIDE TOPSIDE #2
TRANSFORMER #2
10 09:00:00 AM AFT MSB ROOM 3 Ye Lin 871.03 11KV Main Switchboard No.3 System 861-EG-006 ALTERNATOR #6 871-EH-003 11KV MAIN SWBD #3
11 10:00:00 THRUSTER ROOM 2 Ye Lin 635.02B Thruster VFD No.2 System 871-EH-001 11KV MAIN SWBD #1 635-DX-002 THRUSTER #2 VFD
12 10:00:00 AM THRUSTER ROOM 1 Rajiv 873.07 690VAC Thruster MCC No.1 System 865-ET-007 THRUSTER #1 690V 873-EN-007 THRUSTER #1
AUXILIARY 690VAC MCC
TRANSFORMER
13 10:00:00 AM Thruster room 3 Ye Lin 635.03B Thruster VFD No.3 System 871-EH-003 11KV MAIN SWBD #3 635-DX-003 THRUSTER #3 VFD
14 11:00:00 AM T1 Room Ye Lin 635.01B Thruster VFD No.1 System 871-EH-002 11KV MAIN SWBD #2 635-DX-001 THRUSTER #1 VFD
15 6:00:00 PM AFT SWBD RM # 1 Rajiv 875.56 690VAC Aft Main Switchboard No.1 TEMP DB(AFT) TEMP DB(AFT) 875-EN-007 690VAC MAIN SWBD
System AFT #1
16 6:00:00 PM TOPSIDE SWBD 1 Rajiv 875.62 690VAC Topside Main Switchboard No.1 TEMP Temporary Transformer 875-EN-004 690VAC MAIN SWBD
System TRANSFORMER TOPSIDE #1
17 7:00:00 Pm FWD SWBD #3 Rajiv 875.61 690VAC Fwd Main Switchboard No.3 TEMP DB(FWD) TEMP DB(FWD) 875-EN-003 690VAC MAIN SWBD
System FWD #3
18 7:00:00 PM FWD SWBD #3 Rajiv 875.61 690VAC Fwd Main Switchboard No.3 TEMP GEN TEMP GEN TEMP DB(FWD) TEMP DB(FWD)
System
19 9:00:00 AM AFT MSB ROOM 3 Ye Lin 871.03 11KV Main Switchboard No.3 System 861-EG-005 ALTERNATOR #5 871-EH-003 11KV MAIN SWBD #3
Page 5 of 8
11-1116 ( TOI JURONG ESPADON-III #1 )
Daily activities summary list
Daily Inspection
No Time Place to meet PIC Sub System Sub System Description Equip Tag/ Type of Inspection
Package No
1 08:30:00 AM MACHIINERY MURAD 876.06 220VAC Emergency Lighting Panel ELP04 System 876.06-L-001 Cables TP
2 08:30:00 AM MACHINERY MURAD 744.03 Main Generators UREA System - Engine No.3 744.03-C-004 Cables TP
3 08:30:00 AM LQ MURAD 792.01 Vessel Management System (VMS) 792.01-C-029 Cables TP
4 08:30:00 AM MACHINERY MURAD 408.01 Dynamic Positioning System 408.01-C-009 Cables TP
5 09:00:00 AM LQ MURAD 422.02 AERONAUTICAL VHF ANTENNA NO.1 422-RZ-002 Electrical Completion-ITR
6 09:00:00 AM LQ MURAD 422.02 AERONAUTICAL VHF ANTENNA NO.2 422-RZ-003 Electrical Completion-ITR
7 09:00:00 AM INTERNAL COMMUNICATION LAI 571.05 Air Conditioning System - LQ Area 571.05-02-AC-003 HVAC TP
EQUIPMENT ROOM (S)
8 09:00:00 AM MUD PUMP RM PHYOE 146.01 TANK CLEANING SUCTION DIAPHRAGM PUMP #3 146PF003 Mechanical Completion-ITR
9 09:00:00 AM MUD PUMP RM PHYOE 146.01 TANK CLEANING SUCTION DIAPHRAGM PUMP #4 146PF004 Mechanical Completion-ITR
10 09:30:00 AM RESERVE MUD PIT ROOM FU 294.01 LOCAL CONTROL PANEL FOR RESERVE MUD PIT ROOM 294CP003 Mechanical Completion-ITR
FWD DOOR
11 09:30:00 AM RESERVE MUD PIT ROOM FU 294.01 REMOTE CONTROL PANEL FOR RESERVE MUD PIT ROOM 294CP004 Mechanical Completion-ITR
FWD DOOR
12 09:30:00 AM AFT HVAC RM #2 FU 513.02 WATERTIGHT SLIDING DOOR #9 513DR009 Mechanical Completion-ITR
13 09:30:00 AM PASSAGE WAY / THR RM #4 FU 513.02 WATERTIGHT SLIDING DOOR #11 513DR011 Mechanical Completion-ITR
14 09:30:00 AM MUD PUMP RM PHYOE 327.01 DRILL WATER HYDROPHORE TANK 327VL001 Mechanical Completion-ITR
15 10:00:00 AM AFT PRM #3 PHYOE 734.01 DUPLEX AIR FILTER 734FLX003 Mechanical Completion-ITR
16 09:00:00 AM SHAKER HOUSE VACCUM 326.03 Desilter and Degasser System 16-LPM-018 Piping 1st TP-Reinstatement
DEGASSER 1,2 TO DERRICK
17 11:30:00 AM SHAKER HOUSE PROCESS PUMP 816.01 Fire Fighting Foam System 16-FOM-005 Piping 1st TP-Reinstatement
ROOM
18 02:00:00 PM FWD PUMP ROOM #1 721.04 Misc. Sea Water Cooling System 16-SWC-010 Piping TP-Flushing
19 03:00:00 PM AFT PORT MAIN DECK AND AFT 813.02 Fire Fighting Sea Water System (Aft) 16-FRW-013 Piping TP-Flushing
STBD MAIN DECK
20 03:00:00 PM WELL TEST UNITS 372.01 Flare Boom System (OFE) 16-FLB-003 Piping TP-Flushing
21 10:00:00 AM SHAKER HOUSE PROCESS PUMP 816.01 Fire Fighting Foam System 16-FOM-005 Piping TP-Flushing
ROOM
22 11:00:00 AM LQ LEVEL # 1 (STBD SIDE) 582.02 Sewage Vacuum System 16-GRW-021 Piping TP-Line Check
23 02:00:00 PM WELL TEST UNITS 372.01 Flare Boom System (OFE) 16-FLB-003 Piping TP-Pressure Test
24 11:00:00 AM FWD PUMP ROOM #1 721.04 Misc. Sea Water Cooling System 16-SWC-010 Piping TP-Pressure Test
25 11:00:00 AM PROVISION CONDENSING UNIT 582.02 Sewage Vacuum System 16-GRW-028 Piping TP-Pressure Test
Page 6 of 8
11-1116 ( TOI JURONG ESPADON-III #1 )
Daily activities summary list
Page 7 of 8
11-1116 ( TOI JURONG ESPADON-III #1 )
Advance call out/ One day look ahead activities
COMMISSIONING
No Time Place to meet PIC Sub System Sub System Description Remarks Permit No
75 08:00:00 AMSR1 Ye Lin 871.01 11KV Main Switchboard No.1 System Support Operation CP2783
76 08:00:00 AMSR2 Ye Lin 871.02 11KV Main Switchboard No.2 System Support Operation CP2784
77 08:00:00 AMSR3 Ye Lin 871.03 11KV Main Switchboard No.3 System Support Operation CP2785
78 08:00:00 AMSR2 Ye Lin 865.11 3000KVA 690VAC Fwd Main SWBD Support Operation CP2798
Transformer No.2 System
79 08:00:00 AMSR2 Ye Lin 865.17 690VAC Main SWBD Topside Transformer #2 Support Operation CP2799
System
80 08:00:00 ER#3 Nay Lynn Ko 861.05 Power Gen System Main Gen Skid No.5 DG Operation
81 08:00:00 ER#3 Nay Lynn Ko 861.06 Power Gen System Main Gen Skid No.6 DG Operation
82 09:00:00 DVFR1 Ye Lin 865.13 6000KVA 690V Drilling VFD Transformer No.1 Support Operation CP2846
System
83 09:00:00 DVFR2 Ye Lin 865.14 6000KVA 690V Drilling VFD Transformer No.2 Support Operation CP2847
System
84 09:00:00 DVFR3 Ye Lin 865.15 6000KVA 690V Drilling VFD Transformer No.3 Support Operation CP2848
System
ENERGIZING
No Time Place to meet PIC Sub System Sub System Description Fr Equip Tag Description To Equip Tag Description
20 Main Deck Forward HP Soh 501.01 Lifeboat and Davits System (Fwd) 873-EN-014 AUXILIARY/VENTIL 501EC002 LIFEBOAT DAVIT #2
ATION 690VAC MCC STARTER CABINET
#2
21 Main Deck Forward HP Soh 501.01 Lifeboat and Davits System (Fwd) 501EC002 LIFEBOAT DAVIT #2 501-DE-001B LIFEBOAT DAVIT #2
STARTER CABINET WINCH
22 Main Deck Forward HP Soh 501.01 Lifeboat and Davits System (Fwd) 873-EN-014 AUXILIARY/VENTIL 501EC004 LIFEBOAT DAVIT #4
ATION 690VAC MCC STARTER CABINET
#2
23 Main Deck Forward HP Soh 501.01 Lifeboat and Davits System (Fwd) 501EC004 LIFEBOAT DAVIT #4 501-DE-001D LIFEBOAT DAVIT #4
STARTER CABINET WINCH
Page 8 of 8