Professional Documents
Culture Documents
1 Coolant Thermostat 2 O-Ring 3 Coolant Pump 4 Coolant Line Arrow Vent Opening
1 Coolant Thermostat 2 O-Ring 3 Coolant Pump 4 Coolant Line Arrow Vent Opening
10
ENGINES 900.9 in MODELS 375.1, 970, 972, 975, 976
ENGINES 924.9 in MODELS 958.0, 970, 972, 974, 975, 976
1 Coolant thermostat
2 O-ring
3 Coolant pump
4 Coolant line
W20.10-1044-06
Remove/install
Danger! Risk of injury caused by body parts being Ensure that no one is within tilting range of AS60.80-Z-0001-01A
pinched or crushed as cab is tilted cab as it is being tilted. Always tilt cab all the
way to end position and secure with safety
strut.
1 Tilt cab Installation: Only tilt cab back after leak
test has been conducted.
Notes on tilting the cab AH60.80-N-0003-01A
2 Drain coolant AR20.00-W-1142J
3 Detach coolant line (4) at coolant pump (3) *BA20.10-N-1004-01C
4 Remove coolant thermostat (1) and O-ring (2) Installation: Note the installation position
of coolant thermostat (1). The vent opening
(arrow) must point upwards.
5 Test coolant thermostat (1) Only if coolant thermostat (1) is to be AR20.10-W-2455A
reused.
6 Install in the reverse order