Prefunctional Test Checklist

PREFUNCTIONAL TEST CHECKLIST


PIPE-_____
Specification Section ______

Project: ______Project No: ______


Components included (except at equipment):
___flanges/couplings, ___ valves, ___supports/hangers, ___vents, ___air separators, ___expansion
tanks, ___flow meters, ___expansion joints, ___sensors/transmitters/gages
Associated Checklists:
___chillers, ___cooling towers, ___pumps, ___CHW pumps, ___AHUs, ___ emergency power
system
___Other______
1.Submittal / Approvals
Submittal. The above equipment and systems integral to them are complete and ready for functional
testing. The checklist items are complete and have been checked off only by parties having direct
knowledge of the event, as marked below, respective to each responsible contractor. This
prefunctional checklist is submitted for approval, subject to an attached list of outstanding items yet
to be completed. A Statement of Correction will be submitted upon completion of any outstanding
areas. ___ List attached.
______
Mechanical ContractorDateControls ContractorDate
______
Electrical ContractorDatePlumb/FP ContractorDate
______
TAB ContractorDateGeneral ContractorDate
Prefunctional checklist items are to be completed as part of startup & initial checkout, preparatory to
functional testing.
This checklist does not take the place of the manufacturer’s recommended checkout and startup
procedures or report.
Contractors assigned responsibility for sections of the checklist shall be responsible to see that
checklist items by their subcontractors are completed and checked off.
Approvals. This filled-out checklist has been reviewed. Its completion is approved.
______
Commissioning Authority/AgentDateOwner’s RepresentativeDate
2.Requested documentation submitted
a)Shop drawings:Yes / No - date to be submitted ______
b)Performance data (friction loss, gaskets):Yes / No - date to be submitted ______
c)Installation inspection reports (x-ray, NDT, etc.):
Yes / No - date to be submitted ______
d)Flushing/water quality test results attached:Yes / No
e)Sterilization test results:N/A / Yes / No - date to be submitted ______
f)Bacterial test results:N/A / Yes / No - date to be submitted ______
3.Pipe Verification
Item / Specified / Submitted / Installed
Pipe: Manufacturer
Material
ASTM No. / Grade / Type
Service
Fitting Type (Flanged, welded, Victaulic, screwed, etc.)
Joint Type (Flanged, welded, Victaulic, screwed, etc.)
Gaskets
Pipe Coating
Wall Thickness/Sch. No.
Insulation Type
Insulation Thickness
External Wrap Type
External Wrap Thickness
Expansion Tank: Manufacturer
Model No.
Type
Air Separator: Manufacturer
Model No.
Type

1. Installation Checks

a)Piping and Supports/Hangers


i)Pipe installed per shop drawings:Yes / No
ii)Pipe installed per construction drawings:Yes / No
iii)Installed routing is acceptable:Yes / No
iv)Supports/hangers/thrust blocks installed per shop drawings:Yes / No
v)Supports/hangers/thrust blocks installed per construction drawings:
Yes / No
vi)Vibration isolation devices installed and active:Yes / No
vii)Support/hanger/thrust block installation is acceptable:Yes / No
viii)Support/hanger/thrust block as-built drawings updated:Yes / No
ix)All supports/hangers/thrust blocks are active:Yes / No
x)Dissimilar metals isolated (pipe to pipe, pipe to support):N/A / Yes / No
xi)Flanges properly aligned:N/A / Yes / No
xii)Flange bolting complete and torqued per specifications/shop drawings:
N/A / Yes / No
xiii)Victaulic couplings installed per shop drawings:N/A / Yes / No
xiv)Victaulic couplings per construction/as-built drawings:N/A / Yes / No
xv)Welded joints/fittings installed per shop drawings:N/A / Yes / No
xvi)Other joints/fittings installed per shop drawings:N/A / Yes / No
xvii)Gaskets installed:N/A / Yes / No
xviii)Gasket material per shop drawings:N/A / Yes / No
xix)Gasket material per specifications:N/A / Yes / No
xx)Containment system installed:N/A / Yes / No
xxi)Low point drains installed:N/A / Yes / No
xxii)System fill connections installed:N/A / Yes / No
xxiii)Air vents installed:N/A / Yes / No
xxiv)Expansion joints or loops installed per drawings/specifications:Yes / No
xxv)Flexible connections installed at vibrating equipment:Yes / No
xxvi)Air chambers and/or shock absorbers installed:N/A / Yes / No
xxvii)Piping as-built drawings updated:Yes / No
xxviii)Minimum clearances from roof and vertical obstructions maintained:
N/A / Yes / No
xxix)Protective coating installed on pipe and supports/hangers per specifications:
N/A / Yes / No
xxx)Permanent identification installed:Yes / No
b)Valves and Specialties
i)Components properly labeled:Yes / No
ii)Components installed in proper location:Yes / No
iii)Components installed in proper orientation and function as intended:
Yes / No
iv)Connections tight:Yes / No
v)Components insulated per specifications:N/A / Yes / No
vi)By-pass piping installed per shop and/or construction drawings:Yes / No
vii)ASME pressure vessel data sheet or certification tag posted, vessel stamped, inspection
complete: N/A / Yes / No
viii)Components accessible for maintenance, platforms and/or catwalks installed as necessary: Yes /
No
ix)Wells for monitoring/control sensors, transmitters, and/or gages are installed correctly: N/A / Yes /
No
x)Monitoring/control sensors, transmitters, and/or gages are installed correctly: N/A / Yes / No
xi)Test ports installed per shop drawings for monitoring/control sensors/transmitters: N/A / Yes / No
xii)Valve chart completed:Yes / No
c)Electrical and Controls
i)DCP(s) power source(s) identified:N/A / Yes / No
ii)Panel(s) labeled with permanent label:N/A / Yes / No
iii)Power disconnect(s) in place and labeled:N/A / Yes / No
iv)Low voltage wiring in separate conduit as 120 vac:N/A / Yes / No
v)120 vac lightning protection installed:N/A / Yes / No
vi)Low voltage lightning protection installed (underground only):N/A / Yes / No
vii)Pneumatic devices separated from controller and electronics:N/A / Yes / No
viii)E-O-L devices labeled and wiring tagged per drawings:N/A / Yes / No
ix)Panel devices labeled and wiring tagged per drawings:N/A / Yes / No
x)I/O devices labeled and wiring tagged per drawings:N/A / Yes / No
xi)Digital inputs and outputs operational:N/A / Yes / No
xii)E-PROM images on LAN for each controller:N/A / Yes / No
xiii)Controller drawing and point summary log in panel:N/A / Yes / No
xiv)All electric connections tight:N/A / Yes / No
xv)Proper grounding installed for components and unit:N/A / Yes / No
xvi)Safeties in place and operable:N/A / Yes / No
xvii)Starter overload breakers installed and correct size:N/A / Yes / No
xviii)Sensors calibrated (see below) :N/A / Yes / No
xix)Control system interlocks hooked up and functional:N/A / Yes / No
xx)All control devices, pneumatic tubing and wiring complete:N/A / Yes / No
d)TAB
i)Installation of required system balancing devices complete:N/A / Yes / No
ii)Hydronic TAB completed and accepted:N/A / Yes / No
e)Final
i)Pressure test complete with acceptable results per specifications: Yes / No
ii)Containment system tested for leaks with acceptable results: N/A / Yes / No
iii)Prefunctional testing complete for all connected equipment:Yes / No
iv)Flushing/water quality test complete:Yes / No
v)Water quality test results accepted by MDAD:N/A / Yes / No
vi)Piping system charged:Yes / No
vii)Water treatment test results accepted by water treatment company: N/A / Yes / No
viii)Sterilization test results accepted:N/A / Yes / No
ix)Bacterial test results accepted:N/A / Yes / No
x)Building and Zoning final inspection complete/approved:N/A / Yes / No
xi)MDAD approval obtained (attached) to open to existing systems:
N/A / Yes / No
6.Sensor and Actuator Calibration
All field-installed temperature and pressure sensors and gages, and all actuators shall be calibrated.
All test instruments have had a certified calibration within the last 12 months: Y/N______.
Sensor/Actuator Verification Table
Sensor or Actuator / Location OK (Y/N) / Thermometer or Gage Value / BMS Value / Instrument
Measured Value / Pass (Y/N)
Temp __
Temp __
Temp __
Temp __
Temp __
Temp __
Temp __
Temp __
Pressure __
Pressure __
Pressure __
Pressure __
Pressure __
Pressure __
Pressure __
Flow Meter ___
Flow Meter ___
Flow Meter ___
Flow Meter ___
Flow Meter ___

Thermometer/Gage reading = reading of the permanent instrument on the equipment. BMS =


building management system. Instrument = testing instrument.
All sensors are calibrated within required tolerances___ YES ___ NO
-- END OF CHECKLIST--