Start Date: 01-05-2020 End Date: 31-06-2020 Note: Attach Supporting Documents, if needed
Responsible: Mahran Aldabbas
Status For KAUST Use Only
SR/W.O Notification Required
Proposed
Problem Description Status Change Justification
Current
Number Date End Date Mitigation
Reason if Rejected
Status
Check / Rectify the FSW supply line wall get Contractor to visit the area due to under warranty, to
damaged and paint peel off from the wall in Bldg 30 be rectified after operations are back to normal Accepted
basement. See attached photos.Location: CMOR pending due to the current lock down and imposed
1040Contact: ID#133681 / Mohamed Sathar / curfew.
623777 / 65202288 2/20/20 5:40 PM 3/1/20 4:29 PM INPRG PCT mohamed.sathar@kaust.edu.sa / 808 2275 / 054
631 1280 Please approve the PCT.
Rejected
Previous PCT attached.
Accepted
Rejected
Accepted
Rejected
Accepted
Rejected