Status Change Request MACC_SCR

Service: Civil
Start Date: 01-05-2020 End Date: 31-06-2020 Note: Attach Supporting Documents, if needed
Responsible: Mahran Aldabbas
Status For KAUST Use Only
SR/W.O Notification Required

Proposed
Problem Description Status Change Justification

Current
Number Date End Date Mitigation
Reason if Rejected
Status

Check / Rectify the FSW supply line wall get Contractor to visit the area due to under warranty, to
damaged and paint peel off from the wall in Bldg 30 be rectified after operations are back to normal Accepted
basement. See attached photos.Location: CMOR pending due to the current lock down and imposed
1040Contact: ID#133681 / Mohamed Sathar / curfew.
623777 / 65202288 2/20/20 5:40 PM 3/1/20 4:29 PM INPRG PCT mohamed.sathar@kaust.edu.sa / 808 2275 / 054
631 1280 Please approve the PCT.
Rejected
Previous PCT attached.

Accepted

Rejected

Accepted

Rejected

Accepted

Rejected

MACC Service Line Manager /Delegate CTPS Service Line Approval CTPS Application Level Approval

Name: Mahran Aldabbas


_________________________________ Name: _________________________________ Name: _________________________________

Signature: ___________________ Date: ________ Signature: ___________________ Date: _________ Signature: ___________________ Date: _________

Aug 2018 Page 1 of 1 Ver. 1.0