Professional Documents
Culture Documents
Customer Asset
#:
Location: 101CMP-UN2800-04 Building 18 Level 4
Job Plan
Task ID Description Work Done ( Yes/No)
10 Comply with applicable HSE 6-101 Work Permit Safety Procedure Forms and
checklist (i.e. PTW, WCIC, SSOW, Lab Work Permit, Isolation permit etc.)
20 Maintain good housekeeping before, during and after work execution.
30 Ensure identified/listed tools, instruments and equipment fit for purpose is
available before start of work.
40 Inspect marks on ceiling surface
50 Inspect cracks on ceiling surface
60 Inspect discolouration on ceiling surface
70 Inspect scratches on ceiling surface
80 Inspect flaking on ceiling surface
90 Inspect warping on ceiling surface
100 Inspect deformation on ceiling surface
110 Inspect all corroded ceiling support system
120 Inspect all yeilding on ceiling support system
130 Inspect all loose ceiling support system
140 Inspect all improper materials of ceiling support system
150 Inspect all connectors of ceiling support system
160 Inspect ceiling access panel for operability and finishes.
170 Record all findings on the layout using standard notations
180 Upload layout and open corrective tickets in Maximo to rectify all findings
Planned Labor
taskid craft laborcode Qty Hours
30301 - Carpenter 2 02:30
Planned Material
Task ID Item Description Storeroom Qty
10/22/19 11:02 AM 1 / 2
Work Order
WorkOrder: 45018826: BUILDING LEVEL - BUILDING 18 LEVEL 04 - GYPSUM CEILING
Actual Labor
Labor Labor Name Crafts Start Date Start Time End Date End Time
Code
104220 Ricardo Brrameda 30307 - Jul 6, 2019 7:30:00 AM Jul 6, 2019 10:00:00 AM
Upholsterer
172834 JOHNREY LADRA 40601 - Jul 6, 2019 7:30:00 AM Jul 6, 2019 10:00:00 AM
Housekeeper
Actual Materials
Item ID Description Unit Quantity
1
Report:
10/22/19 11:02 AM 2 / 2