You are on page 1of 4

ZFOD-Zubair Field Op.Div.

WORK ORDER EXECUTION REPORT

Work Order 220000231267 Scheduling Start Date 07.03.2017 - Scheduling Finish Date 07.03.2017, WO Print Date 05.03.2017
Work Description Z061-5100-PB-002B_FLUSHING WATER PUMP
27.02.2017 14:46:55 Peter Nagy (ZFCO75147)
Z061-5100-PB-002B_FLUSHING WATER PUMP 1M

Superior Order
Sup. Order Description
Functional Location Z061-5100 WATER INJECTION - TRAIN 0
Equipment
Equipment Manufacturer
Model Number
Serial Number
Work Permit
WO Type Work Type Activity Type Status WBS Element
PM02 PM RO Routine INPR 6EIQ02036MA0005

Object List
Equipment Equipment Description Equipment Tag Functional Location Functional Location Description

Main Discipline MEC Mechanical


PM Plan
PM Plan Description
Planner Group HWR Hammar IPF WI MROT
Failure Mode
Failure Cause
Failure Consequence
D. Time Hours 0.00
Action Taken

Manhours Required:
W. Centers W.C. Description Num Hrs
CN-ELEC CONTRACTOR ELECTRICAL 2 4.00
CN-MROT CONTRACTOR # ROTARY MECHANIC 4 24.00
Tool Required:
Code Description Q.ty Hrs

Operation List:
Op. Sub. Op. Work Center Description Persons Actual Man Hours

Page: 1 of 4
ZFOD-Zubair Field Op.Div.
WORK ORDER EXECUTION REPORT

Work Order 220000231267 Scheduling Start Date 07.03.2017 - Scheduling Finish Date 07.03.2017, WO Print Date 05.03.2017
Work Description Z061-5100-PB-002B_FLUSHING WATER PUMP
27.02.2017 14:46:55 Peter Nagy (ZFCO75147)
Z061-5100-PB-002B_FLUSHING WATER PUMP 1M

Superior Order
Sup. Order Description
Functional Location Z061-5100 WATER INJECTION - TRAIN 0
Equipment
Equipment Manufacturer
Model Number
Serial Number
Work Permit

0010 CN-MROT FLUSHING WATER PUMP_1M 4


FLUSHING WATER PUMP_1M
10 INFORM THE CONTROL ROOM OF BEGINNING OF THE WORKS AND OPEN THE WORK P
20 CHECK ITEM SUBJECT TO MAINTENANCE FOR HSE CONDITIONS
30 MAKE SURE ELECTRICAL PERMIT OPENED
40 ALL ELECTRICAL ACTIVITIES HAS TO BE DONE BY MINIMUM 2 PERSONS QUALIFI
MECHANICAL ACTIVITIES (PUMP IS IN STAND-BY STATUS)
50CHECK THE ENTIRE PUMP FOR OIL OR FLUID LEAKS
60 FLUSH THE FLUID IN THE CRADLE DRAIN LINES
70 CHECK OIL LEVEL IN THE POWER END, LUBRICATOR AND CHAIN CASE; REFILL A
80 CHECK THE PLUNGER PACKING AND ADJUST AS NEEDED
90 CHECK THE LUBRICATION ON PLUNGER PACKING
100 CHECK THE PRESSURE IN THE SUCTION SYSTEM ENSURING IT IS WITHIN RANGE
110 CHECK THAT THE DISCHARGE PULSATION DAMPENER IS SET TO CORRECT PRESSU
120 CHECK THE VALVES, SEATS AND SPRINGS FOR WEAR AND TEAR; REPLACE AS NE
130 CHECK THE BUSHING IN THE VALVE STEM GUIDE AND REPLACE IF WORN
140 CHECK THE PISTON CROSSHEAD COUPLING FOR LOOSE OR DAMAGED PARTS; REPL
150 CHECK ALL BOLTS ON THE FLUID AND POWER ENDS OF THE PUMP; MAKE SURE T
160 CHECK THE PLUNGERS FOR WEAR AND TEAR; REPLACE AS NEEDED
170 CHECK THE EXTENSION ROD RODS FOR WEAR AND TEAR, REPAIR OR REPLACE AS
180 CLEAN OUT THE CRANKCASE BREATHER; REPLACE AS NEEDED
190 CLEAN THE SCREENS AND SETTLING CHAMBER IN THE FLUID RESERVOIR
200 CHECK THE CONDITION OF THE DRIVING BELT; ADJUST THE TENSION AS NEEDE
210 CHECK ALL GUARDS, SHIELDS OR OTHER SAFETY ITEMS IF THEY ARE PROPERLY
220 CHECK THAT THE PRESSURE RELIEF VALVE IS SET TO CORRECT PRESSURE; CAL
GENERAL (ALL DISCIPLINES)
230 MAKE SURE THAT THE PUMP AND WORK AREA ARE CLEANED AND FREE FROM HAZA
240 CHECK THE PROPER TIGHTENING OF ALL BOLTS AND FASTENERS
250 PREPARE FINAL CHECK REPORT INCLUDING ALL READINGS

Page: 2 of 4
ZFOD-Zubair Field Op.Div.
WORK ORDER EXECUTION REPORT

Work Order 220000231267 Scheduling Start Date 07.03.2017 - Scheduling Finish Date 07.03.2017, WO Print Date 05.03.2017
Work Description Z061-5100-PB-002B_FLUSHING WATER PUMP
27.02.2017 14:46:55 Peter Nagy (ZFCO75147)
Z061-5100-PB-002B_FLUSHING WATER PUMP 1M

Superior Order
Sup. Order Description
Functional Location Z061-5100 WATER INJECTION - TRAIN 0
Equipment
Equipment Manufacturer
Model Number
Serial Number
Work Permit

260 CLOSE AND CHECK IF THE WORK PERMIT HAS BEEN CORRECTLY SIGNED
270 INFORM CONTROL ROOM TO PERFORM TEST RUN

0020 CN-ELEC ELECTRICAL ACTIVITIES 2

Page: 3 of 4
ZFOD-Zubair Field Op.Div.
WORK ORDER EXECUTION REPORT

Work Order 220000231267 Scheduling Start Date 07.03.2017 - Scheduling Finish Date 07.03.2017, WO Print Date 05.03.2017
Work Description Z061-5100-PB-002B_FLUSHING WATER PUMP
27.02.2017 14:46:55 Peter Nagy (ZFCO75147)
Z061-5100-PB-002B_FLUSHING WATER PUMP 1M

Superior Order
Sup. Order Description
Functional Location Z061-5100 WATER INJECTION - TRAIN 0
Equipment
Equipment Manufacturer
Model Number
Serial Number
Work Permit

Signatures
Work Done

Remarks

Name Date
WO Waiting for Scheduling by Peter Nagy 27.02.2017
WO Waiting for material by
WO Waiting for Plant condition
WO Waiting for approval by Peter Nagy 27.02.2017
WO Approved by Antonino Mario BATTAGLIA 28.02.2017
WO Approved by KADHIM MUHAMMED TAHER AL-KANAA'NI 28.02.2017

Page: 4 of 4