ZFOD-Zubair Field Op.Div.

WORK ORDER EXECUTION REPORT

Work Order 220001061085 Scheduling Start Date 22.02.2023 - Scheduling Finish Date 22.02.2023, WO Print Date 17.02.2023
First Scheduled Dates Original Planned Start Date 23.02.2023 - Original Planned Finish Date 23.02.2023
Work Description HORIZONTAL CENTRIFUGAL PUMP GROUP B2
PREVENTIVE MAINTENANCE FOR HORIZONTAL CENTRIFUGAL PUMP GROUP B2

Horizontal Centrifugal Pump GROUP B2

Superior Order
Sup. Order Description
Functional Location Z010-P-720 FIREWATER MAIN PUMP (ELECTRICAL)
Equipment 2016014639 HORIZONTAL CENTRIFUGAL PUMP
Equipment Manufacturer THYSSEN RUHRPUMPEN
Model Number ZM II 530/03
Serial Number 8628-0933A
Work Permit
WO Type Work Type Activity Type Status WBS Element
PM02 PM RO Routine APPR 6EIQ02036MA0005

Object List
Equipment Equipment Description Equipment Functional Location Functional Location Description
Tag

Main Discipline MEC Mechanical


PM Plan Z10PA09M06
PM Plan Description HORIZONTAL CENTRIFUGAL PUMP GROUP B2
Planner Group 1MR ZubMish MechRotary
Main Work Center CN-MROT
Failure Mode
Failure Cause
Failure Consequence
D. Time Hours 0.00
Action Taken

Manhours Required:
W. Centers W.C. Description Num Hrs
10ELEC ZUBAIR MISHRIF ELECTRICAL 2 2.00
10MROT ZUBAIR MISHRIF MECHANICAL - ROTARY 2 4.00

Page: 1 of 6
ZFOD-Zubair Field Op.Div.
WORK ORDER EXECUTION REPORT

Work Order 220001061085 Scheduling Start Date 22.02.2023 - Scheduling Finish Date 22.02.2023, WO Print Date 17.02.2023
First Scheduled Dates Original Planned Start Date 23.02.2023 - Original Planned Finish Date 23.02.2023
Work Description HORIZONTAL CENTRIFUGAL PUMP GROUP B2
PREVENTIVE MAINTENANCE FOR HORIZONTAL CENTRIFUGAL PUMP GROUP B2

Horizontal Centrifugal Pump GROUP B2

Superior Order
Sup. Order Description
Functional Location Z010-P-720 FIREWATER MAIN PUMP (ELECTRICAL)
Equipment 2016014639 HORIZONTAL CENTRIFUGAL PUMP
Equipment Manufacturer THYSSEN RUHRPUMPEN
Model Number ZM II 530/03
Serial Number 8628-0933A
Work Permit

Tool Required:
Code Description Q.ty Hrs

Operation List:
Op. Sub. Op. Work Center Description Persons Actual Man Hours

Page: 2 of 6
ZFOD-Zubair Field Op.Div.
WORK ORDER EXECUTION REPORT

Work Order 220001061085 Scheduling Start Date 22.02.2023 - Scheduling Finish Date 22.02.2023, WO Print Date 17.02.2023
First Scheduled Dates Original Planned Start Date 23.02.2023 - Original Planned Finish Date 23.02.2023
Work Description HORIZONTAL CENTRIFUGAL PUMP GROUP B2
PREVENTIVE MAINTENANCE FOR HORIZONTAL CENTRIFUGAL PUMP GROUP B2

Horizontal Centrifugal Pump GROUP B2

Superior Order
Sup. Order Description
Functional Location Z010-P-720 FIREWATER MAIN PUMP (ELECTRICAL)
Equipment 2016014639 HORIZONTAL CENTRIFUGAL PUMP
Equipment Manufacturer THYSSEN RUHRPUMPEN
Model Number ZM II 530/03
Serial Number 8628-0933A
Work Permit

0010 10MROT HORIZONTAL CENTRIFUGAL PUMP GROUP 2


B2_1M
HORIZONTAL CENTRIFUGAL PUMP GROUP B2_1M
<H><U>Hor. Axial Split Between Bearings
Centrifugal Pump GROUP B2 1M</>
</>

10,,INFORM THE CONTROL ROOM OF BEGINNING


OF THE WORKS AND OPEN ,,THE WORK PERMIT
20,,CHECK ITEM SUBJECT TO MAINTENANCE
FOR HSE CONDITIONS
30,,CHECK THE OPERATING CONDITIONS BOTH
PUMP AND ELECTRICAL MOTOR ,,
(VIBRATION, NOISE AND TEMPERATURE, OPERATIONAL FLOW AND HEAD)
40,,CHECK PIPING CONNECTIONS FOR ANY
LEAKS
50,,CHECK THAT AUXILIARIES ARE FITTED
AND FUNCTIONING PROPERLY
60,,CHECK GLAND PACKING SEALS FOR ANY
LEAKS; TIGHTEN GLAND AS ,,REQUIRED
(AFTER DE-ENERGIZING ELECTRICAL MOTOR)
70,,MAKE SURE EQUIPMENT DE-ENERGIZED AND
ELECTRICAL PERMIT OPENED
80,,EXTERNAL CLEANING OF EQUIPMENT
90,,CHECK COUPLING GUARD AND ANY
ROTATING PARTS PROTECTION FOR ,,ANY
DEFECT AND REINSTATE THEM IF PREVIOUSLY

Page: 3 of 6
ZFOD-Zubair Field Op.Div.
WORK ORDER EXECUTION REPORT

Work Order 220001061085 Scheduling Start Date 22.02.2023 - Scheduling Finish Date 22.02.2023, WO Print Date 17.02.2023
First Scheduled Dates Original Planned Start Date 23.02.2023 - Original Planned Finish Date 23.02.2023
Work Description HORIZONTAL CENTRIFUGAL PUMP GROUP B2
PREVENTIVE MAINTENANCE FOR HORIZONTAL CENTRIFUGAL PUMP GROUP B2

Horizontal Centrifugal Pump GROUP B2

Superior Order
Sup. Order Description
Functional Location Z010-P-720 FIREWATER MAIN PUMP (ELECTRICAL)
Equipment 2016014639 HORIZONTAL CENTRIFUGAL PUMP
Equipment Manufacturer THYSSEN RUHRPUMPEN
Model Number ZM II 530/03
Serial Number 8628-0933A
Work Permit

REMOVED
100,,CHECK PROPER TIGHTENING OF
FOUNDATION BOLTS
110,,CHECK THE LEVEL OF LUBRICATING OIL;
REFILL AS REQUIRED
120,,CLEAN EQUIPMENTS AND AREA AFTER THE
WORK
130,,RE-ENERGIZE EQUIPMENT AND INFORM
CONTROL ROOM OF ENDING OF ,,THE WORKS
140,,PREPARE FINAL CHECK REPORT
150,,CLOSE AND CHECK IF THE WORK PERMIT
HAS BEEN CORRECTLY SIGNED

0020 10ELEC HORIZONTAL CENTRIFUGAL PUMP GROUP 2


B2_1M

Page: 4 of 6
ZFOD-Zubair Field Op.Div.
WORK ORDER EXECUTION REPORT

Work Order 220001061085 Scheduling Start Date 22.02.2023 - Scheduling Finish Date 22.02.2023, WO Print Date 17.02.2023
First Scheduled Dates Original Planned Start Date 23.02.2023 - Original Planned Finish Date 23.02.2023
Work Description HORIZONTAL CENTRIFUGAL PUMP GROUP B2
PREVENTIVE MAINTENANCE FOR HORIZONTAL CENTRIFUGAL PUMP GROUP B2

Horizontal Centrifugal Pump GROUP B2

Superior Order
Sup. Order Description
Functional Location Z010-P-720 FIREWATER MAIN PUMP (ELECTRICAL)
Equipment 2016014639 HORIZONTAL CENTRIFUGAL PUMP
Equipment Manufacturer THYSSEN RUHRPUMPEN
Model Number ZM II 530/03
Serial Number 8628-0933A
Work Permit

Signatures
Work Done

Remarks

Name Date
WO Waiting for Scheduling Salem Ibrahim Mohamed Okasha 08.02.2023
WO Waiting for material by
WO Waiting for Plant
WO Waiting for approval ABD-AL-HAMMED ABAD 08.02.2023
WO Approved by Bartolomeo SGARLATA 15.02.2023
WO Approved by WAHAB ALSHWAIRED 15.02.2023

Page: 5 of 6
Page: 6 of 6