Work Order 220001061085 Scheduling Start Date 22.02.2023 - Scheduling Finish Date 22.02.2023, WO Print Date 17.02.2023
First Scheduled Dates Original Planned Start Date 23.02.2023 - Original Planned Finish Date 23.02.2023
Work Description HORIZONTAL CENTRIFUGAL PUMP GROUP B2
PREVENTIVE MAINTENANCE FOR HORIZONTAL CENTRIFUGAL PUMP GROUP B2
Superior Order
Sup. Order Description
Functional Location Z010-P-720 FIREWATER MAIN PUMP (ELECTRICAL)
Equipment 2016014639 HORIZONTAL CENTRIFUGAL PUMP
Equipment Manufacturer THYSSEN RUHRPUMPEN
Model Number ZM II 530/03
Serial Number 8628-0933A
Work Permit
WO Type Work Type Activity Type Status WBS Element
PM02 PM RO Routine APPR 6EIQ02036MA0005
Object List
Equipment Equipment Description Equipment Functional Location Functional Location Description
Tag
Manhours Required:
W. Centers W.C. Description Num Hrs
10ELEC ZUBAIR MISHRIF ELECTRICAL 2 2.00
10MROT ZUBAIR MISHRIF MECHANICAL - ROTARY 2 4.00
Page: 1 of 6
ZFOD-Zubair Field Op.Div.
WORK ORDER EXECUTION REPORT
Work Order 220001061085 Scheduling Start Date 22.02.2023 - Scheduling Finish Date 22.02.2023, WO Print Date 17.02.2023
First Scheduled Dates Original Planned Start Date 23.02.2023 - Original Planned Finish Date 23.02.2023
Work Description HORIZONTAL CENTRIFUGAL PUMP GROUP B2
PREVENTIVE MAINTENANCE FOR HORIZONTAL CENTRIFUGAL PUMP GROUP B2
Superior Order
Sup. Order Description
Functional Location Z010-P-720 FIREWATER MAIN PUMP (ELECTRICAL)
Equipment 2016014639 HORIZONTAL CENTRIFUGAL PUMP
Equipment Manufacturer THYSSEN RUHRPUMPEN
Model Number ZM II 530/03
Serial Number 8628-0933A
Work Permit
Tool Required:
Code Description Q.ty Hrs
Operation List:
Op. Sub. Op. Work Center Description Persons Actual Man Hours
Page: 2 of 6
ZFOD-Zubair Field Op.Div.
WORK ORDER EXECUTION REPORT
Work Order 220001061085 Scheduling Start Date 22.02.2023 - Scheduling Finish Date 22.02.2023, WO Print Date 17.02.2023
First Scheduled Dates Original Planned Start Date 23.02.2023 - Original Planned Finish Date 23.02.2023
Work Description HORIZONTAL CENTRIFUGAL PUMP GROUP B2
PREVENTIVE MAINTENANCE FOR HORIZONTAL CENTRIFUGAL PUMP GROUP B2
Superior Order
Sup. Order Description
Functional Location Z010-P-720 FIREWATER MAIN PUMP (ELECTRICAL)
Equipment 2016014639 HORIZONTAL CENTRIFUGAL PUMP
Equipment Manufacturer THYSSEN RUHRPUMPEN
Model Number ZM II 530/03
Serial Number 8628-0933A
Work Permit
Page: 3 of 6
ZFOD-Zubair Field Op.Div.
WORK ORDER EXECUTION REPORT
Work Order 220001061085 Scheduling Start Date 22.02.2023 - Scheduling Finish Date 22.02.2023, WO Print Date 17.02.2023
First Scheduled Dates Original Planned Start Date 23.02.2023 - Original Planned Finish Date 23.02.2023
Work Description HORIZONTAL CENTRIFUGAL PUMP GROUP B2
PREVENTIVE MAINTENANCE FOR HORIZONTAL CENTRIFUGAL PUMP GROUP B2
Superior Order
Sup. Order Description
Functional Location Z010-P-720 FIREWATER MAIN PUMP (ELECTRICAL)
Equipment 2016014639 HORIZONTAL CENTRIFUGAL PUMP
Equipment Manufacturer THYSSEN RUHRPUMPEN
Model Number ZM II 530/03
Serial Number 8628-0933A
Work Permit
REMOVED
100,,CHECK PROPER TIGHTENING OF
FOUNDATION BOLTS
110,,CHECK THE LEVEL OF LUBRICATING OIL;
REFILL AS REQUIRED
120,,CLEAN EQUIPMENTS AND AREA AFTER THE
WORK
130,,RE-ENERGIZE EQUIPMENT AND INFORM
CONTROL ROOM OF ENDING OF ,,THE WORKS
140,,PREPARE FINAL CHECK REPORT
150,,CLOSE AND CHECK IF THE WORK PERMIT
HAS BEEN CORRECTLY SIGNED
Page: 4 of 6
ZFOD-Zubair Field Op.Div.
WORK ORDER EXECUTION REPORT
Work Order 220001061085 Scheduling Start Date 22.02.2023 - Scheduling Finish Date 22.02.2023, WO Print Date 17.02.2023
First Scheduled Dates Original Planned Start Date 23.02.2023 - Original Planned Finish Date 23.02.2023
Work Description HORIZONTAL CENTRIFUGAL PUMP GROUP B2
PREVENTIVE MAINTENANCE FOR HORIZONTAL CENTRIFUGAL PUMP GROUP B2
Superior Order
Sup. Order Description
Functional Location Z010-P-720 FIREWATER MAIN PUMP (ELECTRICAL)
Equipment 2016014639 HORIZONTAL CENTRIFUGAL PUMP
Equipment Manufacturer THYSSEN RUHRPUMPEN
Model Number ZM II 530/03
Serial Number 8628-0933A
Work Permit
Signatures
Work Done
Remarks
Name Date
WO Waiting for Scheduling Salem Ibrahim Mohamed Okasha 08.02.2023
WO Waiting for material by
WO Waiting for Plant
WO Waiting for approval ABD-AL-HAMMED ABAD 08.02.2023
WO Approved by Bartolomeo SGARLATA 15.02.2023
WO Approved by WAHAB ALSHWAIRED 15.02.2023
Page: 5 of 6