UNITED FIRE PROTECTION CORP.

Delivery Date: July 23, 2020


Work Ticket
1 Mark Road Ticket #: 143669.07232020
Kenilworth, NJ 07033 Account #: 66-21580
P (908) 688-0300 F (908) 688-0218 PO# Verbal John Large 7-22-2020
Scheduled by: George DeVoe
Site Name: 25 Kent
Address: 25 Kent Avenue, Brooklyn, NY, 11249 Building
Site Contact: John Large 646-630-2822 needemail@ufpco.com
Type of Call: Service

Work Tickets Notes: Air Maintenance switch is in Dave's bin.

Scope of Work: Troubleshoot the loading dock dry system. Compressor is cycling. Customer reports the system
was already checked for leaks. See the Chief Engineer John Large c. 646-630-2822.
Systems:
Site Act # Ctrl Panl System Area Building Str# Str Fl City St
66-215801 VALVE Dry Loading 25 Kent Brooklyn NY
Sprinkler Dock Avenue

Description of Work Performed:


Service to troubleshoot compressor not working properly. Upon arrival system was already on test. Drained
system to test activation of air compressor. Compressor failed to cut in before hitting 2psi. Replaced pressure
switch on compressor and re piped compressor trim. Attempted to refill system, compressor did not turn on
immediately even though system was at 0psi. Compressor turned on after approximately 10 minutes even with
the system at 0psi. Compressor built air pressure to 8 psi before shutting off. Adjusted pressure switch but
compressor would not turn on no matter the pressure switch's settings. Drained system back to 0psi. This time
compressor cut in after about 5 minutes of system sitting at 0psi and built pressure to 10psi. Removed air trim to
check for potential clogs but none were found. Left compressor on in this time to check operation. Compressor
did not turn on with the system at 0, even though air trim was dismantled. Replaced air trim. Spoke with Larry to
find that a temporary compressor has been filling the system and not the riser mounted compressor.
Recommend replacing air compressor with bigger compressor as the existing compressor has a max output of
20psi and system calls for 40 - 50 psi as water pressure is at 165psi. Spoke with Larry and John about findings.
Assisted Larry in refilling system with temporary compressor. System is holding at 55psi. All systems reset and
back in service at this time.
Follow-up Required:
Recommend replacing riser mounted Gast compressor with new compressor. Pictures attached to timesheet.
Material Used:
Qty Make Model Description
1 General Air SWP60401U Cut in 27psi cut out 40psi adjustable. DPST
Products, Inc. contacts 120/240vac, 1/4'' female threaded
flange.
1 1" ball valve
Technicians Actual Time for the Job:
Date Technician Disp Arr Dep Trvl Total HRPC TOJ Lunch
Frm Trvl
Site
07/23/2020 Dave Moore 06:30 07:30 13:30 01:00 02:00 R 06:00 00:00

System Left: In Normal Operationwwwww Is Call or Insp Complete? Yeswwwww Need to Reschedule? No

Customer Signature Technician Signature


Name John Large Name Dave Moore License/Cert #
Phone 646-630-2822 Phone 908-858-7016
Email needemail@ufpco.com Email dmoore@ufpco.com

Signature Date Signature Date


07/23/2020 07/23/2020