You are on page 1of 4

PT.

SPCO PIPELINE SERVICES


Kawasan Bintang Industri II Lot D No. 611, Tanjung Uncang, Batu Aji, Batam 29400

INSPECTION REPORT
HOT OIL FLUSHING
CUSTOMER : PT. MULTI OCEAN SHIPYARD JOB NO: PT209/23
VESSEL PRIMA NUSANTARA X DATE : 23/11/2023
QUOTATION NO : SPCO/QB482/23R1 SUPERVISOR: MISWANTO
LOCATION: ONBOARD VESSEL PAGES: 4 PAGES
SYSTEM: CABLE HANDLING DECKPREAD HYD. PIPING SYSTEM

JOB DESCRIPTION:
SPCO provided Hot oil flushing unit, flushing oil, Weldon pump, particular counter machine, Filter stand,
5 Micron Cartridge Filter, high pressure hoses, calibrated pressure gauge, consumable items, necessary
hand tools, assorted fittings, skilled workers, supervision and transportation. Carry out N2 blow to
drain out Hydraulic piping System using N2 Pallet with regulator supply by PT. MOS

NO HOT OIL FLUSHING DATA REMARKS


1 FLUSHING MEDIUM – OIL SPC HITO HD 32 TEMPERATURE - 65°C

2 START: DATE 22.11.2023 05:00 PM

3 STOP: DATE 23.11.2023 07:28 PM

4 INSPECTION DATE 23.11.2023 07:28 PM

NO N2 BLOW DATA
1 PRESSURE 5.0 BAR

2 HOLDING PERIOD 10 MINUTES

Line Number / Equipment Number / Description (If applicable)


Actual Scope:- LOOPED AND CONNECTED PIPES
CABLE HANDLING DECKPREAD HYD. PIPING SYSTEM
 Pipe Size: (25mm) OD 25 mm & ID 21 mm = Est. Length 01 Meters
DRW. No: 0141473-Rev1
Line No: LCE TO EMERG. STOPPER (AUX.)

DURATION FLUSHING: 24.0 HR With 5 Micron Cartridge Filter


RESULT: NAS 6
PARTICLE COUNTER CERT: ON APPENDEX

1|Page
PT. SPCO PIPELINE SERVICES
Kawasan Bintang Industri II Lot D No. 611, Tanjung Uncang, Batu Aji, Batam 29400

INSPECTION REPORT
HOT OIL FLUSHING

PARTICLE COUNTER RESULT:

The above works has been completed to the satisfaction of customer’s representatives.
ACCEPTANCE
SPCO’S YARD OWNER
REPRESENTATIVE REPRESENTATIVE REPRESENTATIVE

AUGUESTINE
SIGNATURE/DATE NAME/SIGNATURE/DATE NAME/SIGNATURE/DATE

2|Page
PT. SPCO PIPELINE SERVICES
Kawasan Bintang Industri II Lot D No. 611, Tanjung Uncang, Batu Aji, Batam 29400

INSPECTION REPORT
HOT OIL FLUSHING
PHOTOS

3|Page
PT. SPCO PIPELINE SERVICES
Kawasan Bintang Industri II Lot D No. 611, Tanjung Uncang, Batu Aji, Batam 29400

INSPECTION REPORT
HOT OIL FLUSHING
AS PER FORMULA FLOWRATE OF EACH BRANCH
Re = 21220 x Q/( v x D)
Re = Reynolds number
Constant = 21220
Q = Flow Rate in Liter per min (l/m)
v = Viscosity in Centistokes (Cst)
D = Inner Diameter of pipe / tube in mm
Flushing : Re ≥ 4000
Q = Re x v x D/21220
Parameter
OD (mm) ID (mm) Re v cSt @ 65°C Q (lpm) @ 65°C
25 21 4000 13,7 54,23

Re = 21220 x Q/(V x ID)

Actual
OD (mm) ID (mm) Q(lpm) v cSt @ 65°C Re
25 21 55 13,7 4056,66

THE ABOVE WORK HAS BEEN CARRIED OUT AND COMPLETED TO THE SATISFACTION OF THE
FOLLOWING REPRESENTATIVES.

ACCEPTANCE
SPCO’S YARD OWNER
REPRESENTATIVE REPRESENTATIVE REPRESENTATIVE

AUGUESTINE
SIGNATURE/DATE NAME/SIGNATURE/DATE NAME/SIGNATURE/DATE

4|Page

You might also like