You are on page 1of 6

BUMITECH GLOBAL ENERGY SDN BHD (781730-D)

(FORMERLY KNOWN AS BUMITECH INSPECTION & SERVICES SDN BHD)


NO 7, PT 186 TKT 1, PUSAT NIAGA PAKA, 23100 PAKA, DUNGUN,
TERENGGANU DARUL IMAN.MALAYSIA.
TEL : +609-827 9231/9232 FAX: +609-827 9230
WEBSITE : www.bumitech.org EMAIL : info@bumitech.org Cert. No.: 136038-2013-AQ-MYS-RvA

BGESB-OPE-001/Issue : 1/Rev. No: 1

LIQUID PENETRANT / MAGNETIC PARTICLE INSPECTION REPORT


CLIENT : GAS MALAYSIA BERHAD REPORT NO : BGESB/HESB/RTR/HPRJ1909/001
PROJECT : EPCC OF SERVICE STATION SS/F/DR PHASE 3'19 (6 UNIT) PAGE : 01 OF 01
ITEM : F 500 ST 1 DATE : 29/10/2019
PURPOSE : TO FIND INDICATION ON SURFACE PROCEDURE NO : BGESB/PT/001 REV NO 02
MATERIAL : AS PER REQUEST THICKNESS : AS PER REQUEST ACC. / REJ. CRITERIA : API 1104
SURFACE CONDITION : AS CLEAN JOINT TYPE : N/A WELDING PROCESS :GTAW

LIQUID PENETRANT INSPECTION MAGNETIC PARTICLE INSPECTION


PRE CLEANING : SKC-S DRYING TIME : 5 min EQUIPMENT :
PENETRANT : SKL-SPI PENETRATION TIME : 5-10 min AC / DC / PERMANENT MAGNET :
RED DYE / FLOURESCENT : RED DYE CURRENT / AMPERAGE :
REMOVER : SKC-S SOLVENT/WATER : SOLVENT POLES SPACING :
REMOVING METHOD : SOLVENT DRYING TIME : 3 min MAGNETIC INK :
DEVELOPER : SKD-S2 DRY / WET : WET COLOUR / FLUORESCENT : -
DEVELOPING TIME : 5 - 20 min BACKGROUND PAINT :
LIGHTING : DAY LIGHT LIGHTING : -

NO PART / WELD IDENTIFICATION RESULT

DRAWING NO.
No relevant indication was detected at the time of inspection
ITEM NO: Acceptable as per code specification
1 F 500 ST 1

JOINT NO:
J8,J9
J 15 , J 29
J 30 , J 31
J 32 , J 33
J 38 , J 39
J 40 , J 41
J 42 , J 46
J 47 , J 53
J 54 , J 65
J 66A , J 66B
J 83 , J 84
J 87 , J 88

INSPECTED BY :MUHAMMAD HAZIQ REVIEWED / VERIFIED BY :


SIGNATURE : SIGNATURE :
QUALIFICATION : ASNT LEVEL II POSITION :
DATE : 29/10/2019 DATE :
BUMITECH GLOBAL ENERGY SDN BHD (781730-D)
(FORMERLY KNOWN AS BUMITECH INSPECTION & SERVICES SDN BHD)
NO 7, PT 186 TKT 1, PUSAT NIAGA PAKA, 23100 PAKA, DUNGUN,
TERENGGANU DARUL IMAN.MALAYSIA.
TEL : +609-827 9231/9232 FAX: +609-827 9230
WEBSITE : www.bumitech.org EMAIL : info@bumitech.org Cert. No.: 136038-2013-AQ-MYS-RvA

BGESB-OPE-001/Issue : 1/Rev. No: 1

LIQUID PENETRANT / MAGNETIC PARTICLE INSPECTION REPORT


CLIENT : GAS MALAYSIA BERHAD REPORT NO : BGESB/HESB/RTR/HPRJ1909/002
PROJECT : EPCC OF SERVICE STATION SS/F/DR PHASE 3'19 (6 UNIT) PAGE : 01 OF 01
ITEM : F 500 ST 2 DATE : 29/10/2019
PURPOSE : TO FIND INDICATION ON SURFACE PROCEDURE NO : BGESB/PT/001 REV NO 02
MATERIAL : AS PER REQUEST THICKNESS : AS PER REQUEST ACC. / REJ. CRITERIA : API 1104
SURFACE CONDITION : AS CLEAN JOINT TYPE : N/A WELDING PROCESS :GTAW

LIQUID PENETRANT INSPECTION MAGNETIC PARTICLE INSPECTION


PRE CLEANING : SKC-S DRYING TIME : 5 min EQUIPMENT :
PENETRANT : SKL-SPI PENETRATION TIME : 5-10 min AC / DC / PERMANENT MAGNET :
RED DYE / FLOURESCENT : RED DYE CURRENT / AMPERAGE :
REMOVER : SKC-S SOLVENT/WATER : SOLVENT POLES SPACING :
REMOVING METHOD : SOLVENT DRYING TIME : 3 min MAGNETIC INK :
DEVELOPER : SKD-S2 DRY / WET : WET COLOUR / FLUORESCENT : -
DEVELOPING TIME : 5 - 20 min BACKGROUND PAINT :
LIGHTING : DAY LIGHT LIGHTING : -

NO PART / WELD IDENTIFICATION RESULT

DRAWING NO.
No relevant indication was detected at the time of inspection
ITEM NO: Acceptable as per code specification
2 F 500 ST 2

JOINT NO:
J8,J9
J 15 , J 29
J 30 , J 31
J 32 , J 33
J 38 , J 39
J 40 , J 41
J 42 , J 46
J 47 , J 53
J 54 , J 65
J 66A , J 66B
J 83 , J 84
J 87 , J 88

INSPECTED BY :MUHAMMAD HAZIQ REVIEWED / VERIFIED BY :


SIGNATURE : SIGNATURE :
QUALIFICATION : ASNT LEVEL II POSITION :
DATE : 29/10/2019 DATE :
BUMITECH GLOBAL ENERGY SDN BHD (781730-D)
(FORMERLY KNOWN AS BUMITECH INSPECTION & SERVICES SDN BHD)
NO 7, PT 186 TKT 1, PUSAT NIAGA PAKA, 23100 PAKA, DUNGUN,
TERENGGANU DARUL IMAN.MALAYSIA.
TEL : +609-827 9231/9232 FAX: +609-827 9230
WEBSITE : www.bumitech.org EMAIL : info@bumitech.org Cert. No.: 136038-2013-AQ-MYS-RvA

BGESB-OPE-001/Issue : 1/Rev. No: 1

LIQUID PENETRANT / MAGNETIC PARTICLE INSPECTION REPORT


CLIENT : GAS MALAYSIA BERHAD REPORT NO : BGESB/HESB/RTR/HPRJ1909/003
PROJECT : EPCC OF SERVICE STATION SS/F/DR PHASE 3'19 (6 UNIT) PAGE : 01 OF 01
ITEM : F 2000 ST 1 DATE : 29/10/2019
PURPOSE : TO FIND INDICATION ON SURFACE PROCEDURE NO : BGESB/PT/001 REV NO 02
MATERIAL : AS PER REQUEST THICKNESS : AS PER REQUEST ACC. / REJ. CRITERIA : API 1104
SURFACE CONDITION : AS CLEAN JOINT TYPE : N/A WELDING PROCESS :GTAW

LIQUID PENETRANT INSPECTION MAGNETIC PARTICLE INSPECTION


PRE CLEANING : SKC-S DRYING TIME : 5 min EQUIPMENT :
PENETRANT : SKL-SPI PENETRATION TIME : 5-10 min AC / DC / PERMANENT MAGNET :
RED DYE / FLOURESCENT : RED DYE CURRENT / AMPERAGE :
REMOVER : SKC-S SOLVENT/WATER : SOLVENT POLES SPACING :
REMOVING METHOD : SOLVENT DRYING TIME : 3 min MAGNETIC INK :
DEVELOPER : SKD-S2 DRY / WET : WET COLOUR / FLUORESCENT : -
DEVELOPING TIME : 5 - 20 min BACKGROUND PAINT :
LIGHTING : DAY LIGHT LIGHTING : -

NO PART / WELD IDENTIFICATION RESULT

DRAWING NO.
No relevant indication was detected at the time of inspection
ITEM NO: Acceptable as per code specification
3 F 2000 ST 1

JOINT NO:
J8,J9
J 15 , J 27
J 30 , J 35
J 36 , J 37
J 38 , J 39
J 40 , J 45
J 46 , J 47
J 48 , J 50
J 56 , J 57
J 63 , J 64
J 76 , J 77A
J 77B , J 97
J 98 , J 101
J 102
INSPECTED BY :MUHAMMAD HAZIQ REVIEWED / VERIFIED BY :
SIGNATURE : SIGNATURE :
QUALIFICATION : ASNT LEVEL II POSITION :
DATE : 29/10/2019 DATE :
BUMITECH GLOBAL ENERGY SDN BHD (781730-D)
(FORMERLY KNOWN AS BUMITECH INSPECTION & SERVICES SDN BHD)
NO 7, PT 186 TKT 1, PUSAT NIAGA PAKA, 23100 PAKA, DUNGUN,
TERENGGANU DARUL IMAN.MALAYSIA.
TEL : +609-827 9231/9232 FAX: +609-827 9230
WEBSITE : www.bumitech.org EMAIL : info@bumitech.org Cert. No.: 136038-2013-AQ-MYS-RvA

BGESB-OPE-001/Issue : 1/Rev. No: 1

LIQUID PENETRANT / MAGNETIC PARTICLE INSPECTION REPORT


CLIENT : GAS MALAYSIA BERHAD REPORT NO : BGESB/HESB/RTR/HPRJ1909/004
PROJECT : EPCC OF SERVICE STATION SS/F/DR PHASE 3'19 (6 UNIT) PAGE : 01 OF 01
ITEM : F 2000 ST 2 DATE : 29/10/2019
PURPOSE : TO FIND INDICATION ON SURFACE PROCEDURE NO : BGESB/PT/001 REV NO 02
MATERIAL : AS PER REQUEST THICKNESS : AS PER REQUEST ACC. / REJ. CRITERIA : API 1104
SURFACE CONDITION : AS CLEAN JOINT TYPE : N/A WELDING PROCESS :GTAW

LIQUID PENETRANT INSPECTION MAGNETIC PARTICLE INSPECTION


PRE CLEANING : SKC-S DRYING TIME : 5 min EQUIPMENT :
PENETRANT : SKL-SPI PENETRATION TIME : 5-10 min AC / DC / PERMANENT MAGNET :
RED DYE / FLOURESCENT : RED DYE CURRENT / AMPERAGE :
REMOVER : SKC-S SOLVENT/WATER : SOLVENT POLES SPACING :
REMOVING METHOD : SOLVENT DRYING TIME : 3 min MAGNETIC INK :
DEVELOPER : SKD-S2 DRY / WET : WET COLOUR / FLUORESCENT : -
DEVELOPING TIME : 5 - 20 min BACKGROUND PAINT :
LIGHTING : DAY LIGHT LIGHTING : -

NO PART / WELD IDENTIFICATION RESULT

DRAWING NO.
No relevant indication was detected at the time of inspection
ITEM NO: Acceptable as per code specification
4 F 2000 ST 2

JOINT NO:
J8,J9
J 15 , J 27
J 30 , J 35
J 36 , J 37
J 38 , J 39
J 40 , J 45
J 46 , J 47
J 48 , J 50
J 56 , J 57
J 63 , J 64
J 76 , J 77A
J 77B , J 97
J 98 , J 101
J 102
INSPECTED BY :MUHAMMAD HAZIQ REVIEWED / VERIFIED BY :
SIGNATURE : SIGNATURE :
QUALIFICATION : ASNT LEVEL II POSITION :
DATE : 29/10/2019 DATE :
BUMITECH GLOBAL ENERGY SDN BHD (781730-D)
(FORMERLY KNOWN AS BUMITECH INSPECTION & SERVICES SDN BHD)
NO 7, PT 186 TKT 1, PUSAT NIAGA PAKA, 23100 PAKA, DUNGUN,
TERENGGANU DARUL IMAN.MALAYSIA.
TEL : +609-827 9231/9232 FAX: +609-827 9230
WEBSITE : www.bumitech.org EMAIL : info@bumitech.org Cert. No.: 136038-2013-AQ-MYS-RvA

BGESB-OPE-001/Issue : 1/Rev. No: 1

LIQUID PENETRANT / MAGNETIC PARTICLE INSPECTION REPORT


CLIENT : GAS MALAYSIA BERHAD REPORT NO : BGESB/HESB/RTR/HPRJ1909/005
PROJECT : EPCC OF SERVICE STATION SS/F/DR PHASE 3'19 (6 UNIT) PAGE : 01 OF 01
ITEM : F 2000 ST 3 DATE : 29/10/2019
PURPOSE : TO FIND INDICATION ON SURFACE PROCEDURE NO : BGESB/PT/001 REV NO 02
MATERIAL : AS PER REQUEST THICKNESS : AS PER REQUEST ACC. / REJ. CRITERIA : API 1104
SURFACE CONDITION : AS CLEAN JOINT TYPE : N/A WELDING PROCESS :GTAW

LIQUID PENETRANT INSPECTION MAGNETIC PARTICLE INSPECTION


PRE CLEANING : SKC-S DRYING TIME : 5 min EQUIPMENT :
PENETRANT : SKL-SPI PENETRATION TIME : 5-10 min AC / DC / PERMANENT MAGNET :
RED DYE / FLOURESCENT : RED DYE CURRENT / AMPERAGE :
REMOVER : SKC-S SOLVENT/WATER : SOLVENT POLES SPACING :
REMOVING METHOD : SOLVENT DRYING TIME : 3 min MAGNETIC INK :
DEVELOPER : SKD-S2 DRY / WET : WET COLOUR / FLUORESCENT : -
DEVELOPING TIME : 5 - 20 min BACKGROUND PAINT :
LIGHTING : DAY LIGHT LIGHTING : -

NO PART / WELD IDENTIFICATION RESULT

DRAWING NO.
No relevant indication was detected at the time of inspection
ITEM NO: Acceptable as per code specification
5 F 2000 ST 3

JOINT NO:
J8,J9
J 15 , J 27
J 30 , J 35
J 36 , J 37
J 38 , J 39
J 40 , J 45
J 46 , J 47
J 48 , J 50
J 56 , J 57
J 63 , J 64
J 76 , J 77A
J 77B , J 97
J 98 , J 101
J 102
INSPECTED BY :MUHAMMAD HAZIQ REVIEWED / VERIFIED BY :
SIGNATURE : SIGNATURE :
QUALIFICATION : ASNT LEVEL II POSITION :
DATE : 29/10/2019 DATE :
BUMITECH GLOBAL ENERGY SDN BHD (781730-D)
(FORMERLY KNOWN AS BUMITECH INSPECTION & SERVICES SDN BHD)
NO 7, PT 186 TKT 1, PUSAT NIAGA PAKA, 23100 PAKA, DUNGUN,
TERENGGANU DARUL IMAN.MALAYSIA.
TEL : +609-827 9231/9232 FAX: +609-827 9230
WEBSITE : www.bumitech.org EMAIL : info@bumitech.org Cert. No.: 136038-2013-AQ-MYS-RvA

BGESB-OPE-001/Issue : 1/Rev. No: 1

LIQUID PENETRANT / MAGNETIC PARTICLE INSPECTION REPORT


CLIENT : GAS MALAYSIA BERHAD REPORT NO : BGESB/HESB/RTR/HPRJ1909/006
PROJECT : EPCC OF SERVICE STATION SS/F/DR PHASE 3'19 (6 UNIT) PAGE : 01 OF 01
ITEM : F 8000 DATE : 29/10/2019
PURPOSE : TO FIND INDICATION ON SURFACE PROCEDURE NO : BGESB/PT/001 REV NO 02
MATERIAL : AS PER REQUEST THICKNESS : AS PER REQUEST ACC. / REJ. CRITERIA : API 1104
SURFACE CONDITION : AS CLEAN JOINT TYPE : N/A WELDING PROCESS :GTAW

LIQUID PENETRANT INSPECTION MAGNETIC PARTICLE INSPECTION


PRE CLEANING : SKC-S DRYING TIME : 5 min EQUIPMENT :
PENETRANT : SKL-SPI PENETRATION TIME : 5-10 min AC / DC / PERMANENT MAGNET :
RED DYE / FLOURESCENT : RED DYE CURRENT / AMPERAGE :
REMOVER : SKC-S SOLVENT/WATER : SOLVENT POLES SPACING :
REMOVING METHOD : SOLVENT DRYING TIME : 3 min MAGNETIC INK :
DEVELOPER : SKD-S2 DRY / WET : WET COLOUR / FLUORESCENT : -
DEVELOPING TIME : 5 - 20 min BACKGROUND PAINT :
LIGHTING : DAY LIGHT LIGHTING : -

NO PART / WELD IDENTIFICATION RESULT

DRAWING NO.
No relevant indication was detected at the time of inspection
ITEM NO: Acceptable as per code specification
5 F 8000

JOINT NO:
J8,J9
J 15 , J 27
J 30 , J 35
J 36 , J 37
J 38 , J 39
J 40 , J 45
J 46 , J 47
J 48 , J 50
J 56 , J 57
J 63 , J 64
J 76 , J 77A
J 77B , J 97
J 98 , J 101
J 102
INSPECTED BY :MUHAMMAD HAZIQ REVIEWED / VERIFIED BY :
SIGNATURE : SIGNATURE :
QUALIFICATION : ASNT LEVEL II POSITION :
DATE : 29/10/2019 DATE :