ULTRASONIC THICKNESS MEASUREMENT REPORT JALAN PSU 7 PLAZA SG UDANG 76300 SUNGAI UDANG MELAKA
DOMINANT ENERGY SDN BHD PAGE : 01 OF 01
LOCATION : MRCSB REPORT NO : DMSB/DESB/UTTM/2022-041
PROJECT : UTTM FTNIR CHEMOMETRIC MULTIVARIATE ANALYZER SET : OLYMPUS 38 DL PLUS (193400303) ANALYZER INSTALLATION AT PSR-1 (UNIT 11 & UNIT 16) FOR TIE-IN SCOPE VELOCITY : 5960 m/s LINE NO : 6"-P16020-A1A1 PROBE : D 790 SM 8mm. 5.0 Mhz. DRAWING NO : D-15-1360-007-021 COUPLANT : WALLPAPER PASTE UNIT / AREA : MRSCB (UNIT 16) TEMPERATURE : AMBIENT MATERIAL : CARBON STEEL SURFACE :COATED
JOINT. ORIEN- IDENTIFICATION NOM. READING
REMARKS No. TATION THK
6" SCH 40 POINT 1
NORTH EXISTING PIPE 7.11 6.90 TP-01/16- SOUTH EXISTING PIPE 7.11 7.07 003 EAST EXISTING PIPE 7.11 7.02 WEST EXISTING PIPE 7.11 7.15
NORTH EXISTING PIPE 7.11 7.15
TP-02/16- SOUTH EXISTING PIPE 7.11 7.20 003 EAST EXISTING PIPE 7.11 7.23 WEST EXISTING PIPE 7.11 7.27
NORTH EXISTING PIPE 7.11 7.15
TP-03/16- SOUTH EXISTING PIPE 7.11 7.00 003 EAST EXISTING PIPE 7.11 7.27 WEST EXISTING PIPE 7.11 7.17
Remarks : Note : All measurement are measured in unit milimeters. Orientation :
INSPECTOR : WAN IDHAM WAN OMAR REVIEWED BY : CLIENT REP. :
SIGNATURE : SIGNATURE : SIGNATURE : DATE : 30.05.2022 DATE : DATE : NON DESTRUCTIVE EXAMINATION REQUEST
PROJECT NO : PN-0067 REQUEST NO : MRCSB/DESB/UTTM/002
PROJECT TITLE : SUPPLY, DELIVERY, INSTALLATION AND INSULATION OF PIPE (TA 2022) RESET PROJECT WP20B REFERENCE CODE : ASME B31.3
CLIENT : MALAYSIAN REFINING COMPANY SDN BHD
REQUESTED DATE : 30/05/2022 LOCATION : MRCSB
REQUESTED TIME : 11:00 AM
WELDER NO. VISUAL NDE REQUIREMENT
NO DRAWING NO. LINE NO. JOINT NO WELD TYPE PROCESS MATERIAL SIZE (INCHES) THICKNESS (MM) REMARKS ROOT CAP ACC REJ RT UTTM MPI DPI PRE-HEAT PWHT HARDNESS TEST
1 D-11-1360-059-037 8"-P11168-A1A1-PP TP-01/11-0014 8" 6.35 X
2 D-11-1360-001-560 8"-P11171-A1A1 TP-02/11-0015 8" 6.35 X
TP-03/11-0015 8" 6.35 X
3 D-15-1360-007-021 6"-P16020-A1A1 TP-01/16-003 6" 7.11 X