Distance Frekuensi

1 2 3 4 5 6 1 2 3 4 5 6

Worker Reinforcement Scafolding Worker Reinforcement Scafolding


Basecamp Tower Crane Fabrication Fabrication Ware house Main Office Basecamp Tower Crane Fabrication Fabrication Ware house Main Office

TD1 1 Worker Basecamp 0 80 120 80 135 105 Distance 1 Worker Basecamp 0 7 8 12 4 5


2 Tower Crane 80 0 40 40 55 65 No x y 2 Tower Crane 7 0 20 10 5 5
3 Reinforcement Fabrication 120 40 0 40 35 65 1 10 80 3 Reinforcement Fabrication 8 20 0 18 5 4
4 Scafolding Fabrication 80 40 40 0 75 105 2 70 60 4 Scafolding Fabrication 12 10 18 0 20 7
5 Ware house 135 55 35 75 0 30 3 90 40 5 Ware house 4 5 5 20 0 8
6 Main Office 105 65 65 105 30 0 4 90 80 6 Main Office 5 5 4 7 8 0
5 80 15
1 2 3 4 5 6 6 50 15 1 2 3 4 5 6
Worker Reinforcement Scafolding Worker Reinforcement Scafolding
Tower Crane Ware house Main Office Tower Crane Ware house Main Office
Basecamp Fabrication Fabrication Basecamp Fabrication Fabrication

1 Worker Basecamp 3545 4400 4135 6395 3440 2520


2 Tower Crane 1345 2360 1895 3235 1840 1280
3 Reinforcement Fabrication 1225 1740 2915 2995 2000 1360
4 Scafolding Fabrication 1425 2260 2235 4315 1560 1360
5 Ware house 1715 2545 3650 3010 2730 1615
6 Main Office 2355 3235 4180 3680 3170 2085

Sum = 95750

Safety Distance Frekuensi


1 2 3 4 5 6 x y 1 2 3 4 5 6
Worker Reinforcement Scafolding Worker Reinforcement Scafolding
Basecamp Tower Crane Fabrication Fabrication Ware house Main Office 1 10 80 Basecamp Tower Crane Fabrication Fabrication Ware house Main Office

1 Worker Basecamp 0.000 1.500 1.583 2.313 1.000 1.000 2 70 60 1 Worker Basecamp 0 7 8 12 4 5
2 Tower Crane 1.500 0.000 2.750 3.000 2.182 1.692 3 85 40 2 Tower Crane 7 0 20 10 5 5
3 Reinforcement Fabrication 1.583 2.750 0.000 2.875 1.286 1.077 4 85 80 3 Reinforcement Fabrication 8 20 0 18 5 4
4 Scafolding Fabrication 2.313 3.000 2.875 0.000 2.067 1.762 5 75 15 4 Scafolding Fabrication 12 10 18 0 20 7
5 Ware house 1.000 2.182 1.286 2.067 0.000 1.000 6 50 15 5 Ware house 4 5 5 20 0 8
6 Main Office 1.000 1.692 1.077 1.762 1.000 0.000 6 Main Office 5 5 4 7 8 0
SC1
jarak/jarak total * nilai
1 2 3 4 5 6 1 2 3 4 5 6
Worker Reinforcement Scafolding Worker Reinforcement Scafolding
Tower Crane Ware house Main Office Tower Crane Ware house Main Office
Basecamp Fabrication Fabrication Basecamp Fabrication Fabrication

1 Worker Basecamp 59.92 64.79 80.63 70.50 69.67 38.02


2 Tower Crane 75.19 114.87 83.68 122.98 93.29 56.95
3 Reinforcement Fabrication 64.28 51.65 130.15 79.75 86.20 52.08
4 Scafolding Fabrication 61.08 92.83 95.88 163.17 52.72 54.60
5 Ware house 55.36 58.38 92.84 63.96 70.67 35.52
6 Main Office 45.60 51.16 78.56 68.31 53.08 38.10

Sum = 2626.40

1 diluar perputaran lengan


2 zona 2
3 paling bahaya zona 1

TD SC m
1 95750 2626.40
Skenario 1 (worker basecamp bisa dipindah ke fasilitas warehouse)

Distance Frekuensi
1 2 3 4 5 6 1 2 3 4 5 6
Reinforcement Scafolding Worker Reinforcement Scafolding Worker
Ware house Tower Crane Fabrication Fabrication Basecamp Main Office Ware house Tower Crane Fabrication Fabrication Basecamp Main Office

TD1 1 Ware house 0 80 120 80 135 105 Distance 1 Ware house 0 4 5 5 7 8


2 Tower Crane 80 0 40 40 55 65 No x y 2 Tower Crane 4 0 20 10 8 5
3 Reinforcement Fabrication 120 40 0 40 35 65 1 10 80 3 Reinforcement Fabrication 5 20 0 18 12 4
4 Scafolding Fabrication 80 40 40 0 75 105 2 70 60 4 Scafolding Fabrication 5 10 18 0 4 7
5 Worker Basecamp 135 55 35 75 0 30 3 90 40 5 Worker Basecamp 7 8 12 4 0 8
6 Main Office 105 65 65 105 30 0 4 90 80 6 Main Office 8 5 4 7 5 0
5 80 15
1 2 3 4 5 6 6 50 15 1 2 3 4 5 6
Reinforcement Scafolding Worker Worker Reinforcement Scafolding
Ware house Tower Crane Fabrication Fabrication Basecamp Main Office Basecamp Tower Crane Fabrication Fabrication Ware house Main Office

1 Ware house 3105 4805 5080 4235 2925 2520


2 Tower Crane 1305 2285 2040 1795 1525 1520
3 Reinforcement Fabrication 1125 1485 2800 1595 1645 1720
4 Scafolding Fabrication 1725 2245 2520 2555 1885 1600
5 Worker Basecamp 1010 2140 3245 2065 2255 2020
6 Main Office 1320 3010 4075 2465 2455 2400

Sum = 84500

Safety Distance Frekuensi


1 2 3 4 5 6 x y 1 2 3 4 5 6
Reinforcement Scafolding Worker Reinforcement Scafolding Worker
Ware house Tower Crane Fabrication Fabrication Basecamp Main Office 1 10 80 Ware house Tower Crane Fabrication Fabrication Basecamp Main Office

1 Ware house 0.000 1.500 1.583 2.313 1.000 1.000 2 70 60 1 Ware house 0 4 5 5 7 8
2 Tower Crane 1.500 0.000 2.750 3.000 2.182 1.692 3 85 40 2 Tower Crane 4 0 20 10 8 5
3 Reinforcement Fabrication 1.583 2.750 0.000 2.875 1.286 1.077 4 85 80 3 Reinforcement Fabrication 5 20 0 18 12 4
4 Scafolding Fabrication 2.313 3.000 2.875 0.000 2.067 1.762 5 75 15 4 Scafolding Fabrication 5 10 18 0 4 7
5 Worker Basecamp 1.000 2.182 1.286 2.067 0.000 1.000 6 50 15 5 Worker Basecamp 7 8 12 4 0 8
6 Main Office 1.000 1.692 1.077 1.762 1.000 0.000 6 Main Office 8 5 4 7 5 0
SC1
jarak/jarak total * nilai
1 2 3 4 5 6 1 2 3 4 5 6

Reinforcement Scafolding Worker Worker Reinforcement Scafolding


Ware house Tower Crane Fabrication Fabrication Basecamp Main Office Basecamp Tower Crane Fabrication Fabrication Ware house Main Office

1 Ware house 40.48 67.79 87.63 54.50 45.25 38.02


2 Tower Crane 57.56 116.92 94.45 77.57 63.96 61.45
3 Reinforcement Fabrication 42.99 50.75 134.40 48.10 49.97 56.83
4 Scafolding Fabrication 54.94 92.09 103.41 113.91 83.50 61.53
5 Worker Basecamp 33.49 55.38 89.84 56.96 53.15 38.52
6 Main Office 27.96 51.16 82.56 45.31 40.51 41.10

Sum = 2313.94

1 diluar perputaran lengan


2 zona 2
3 paling bahaya zona 1

TD SC m
1 84500 2313.94
Skenario 2 (reinforcement fabrication bisa dipindah ke fasilitas Scafolding Fabrication)

Distance Frekuensi
1 2 3 4 5 6 1 2 3 4 5 6
Worker Scafolding Reinforcement Worker Scafolding Reinforcement
Basecamp Tower Crane Fabrication Fabrication Ware house Main Office Basecamp Tower Crane Fabrication Fabrication Ware house Main Office

TD1 1 Worker Basecamp 0 80 120 80 135 105 Distance 1 Worker Basecamp 0 7 12 8 4 5


2 Tower Crane 80 0 40 40 55 65 No x y 2 Tower Crane 7 0 10 20 5 5
3 Scafolding Fabrication 120 40 0 40 35 65 1 10 80 3 Scafolding Fabrication 12 10 0 18 20 7
4 Reinforcement Fabrication 80 40 40 0 75 105 2 70 60 4 Reinforcement Fabrication 8 20 18 0 5 4
5 Ware house 135 55 35 75 0 30 3 90 40 5 Ware house 4 5 20 5 0 8
6 Main Office 105 65 65 105 30 0 4 90 80 6 Main Office 5 5 7 4 8 0
5 80 15
1 2 3 4 5 6 6 50 15 1 2 3 4 5 6
Worker Scafolding Reinforcement Worker Reinforcement Scafolding
Basecamp Tower Crane Fabrication Fabrication Ware house Main Office Basecamp Tower Crane Fabrication Fabrication Ware house Main Office

1 Worker Basecamp 3705 4000 5675 4855 4040 2640


2 Tower Crane 1345 2360 3235 1895 1840 1280
3 Scafolding Fabrication 1065 2140 3715 2195 1400 1240
4 Reinforcement Fabrication 1585 1860 3595 2955 2160 1480
5 Ware house 1555 2945 3730 2930 2130 1495
6 Main Office 2195 3635 4400 3460 2570 1965

Sum = 95270

Safety Distance Frekuensi


1 2 3 4 5 6 x y 1 2 3 4 5 6
Worker Scafolding Reinforcement Worker Scafolding Reinforcement
Basecamp Tower Crane Fabrication Fabrication Ware house Main Office 1 10 80 Basecamp Tower Crane Fabrication Fabrication Ware house Main Office

1 Worker Basecamp 0.000 1.500 1.583 2.313 1.000 1.000 2 70 60 1 Worker Basecamp 0 7 12 8 4 5
2 Tower Crane 1.500 0.000 2.750 3.000 2.182 1.692 3 85 40 2 Tower Crane 7 0 10 20 5 5
3 Scafolding Fabrication 1.583 2.750 0.000 2.875 1.286 1.077 4 85 80 3 Scafolding Fabrication 12 10 0 18 20 7
4 Reinforcement Fabrication 2.313 3.000 2.875 0.000 2.067 1.762 5 75 15 4 Reinforcement Fabrication 8 20 18 0 5 4
5 Ware house 1.000 2.182 1.286 2.067 0.000 1.000 6 50 15 5 Ware house 4 5 20 5 0 8
6 Main Office 1.000 1.692 1.077 1.762 1.000 0.000 6 Main Office 5 5 7 4 8 0
SC1
jarak/jarak total * nilai
1 2 3 4 5 6 1 2 3 4 5 6
Worker Scafolding Reinforcement Worker Reinforcement Scafolding
Basecamp Tower Crane Fabrication Fabrication Ware house Main Office Basecamp Tower Crane Fabrication Fabrication Ware house Main Office

1 Worker Basecamp 57.00 72.08 83.63 67.50 58.73 35.83


2 Tower Crane 74.19 117.37 127.48 79.18 89.54 56.20
3 Scafolding Fabrication 52.78 80.40 131.50 78.40 43.07 43.45
4 Reinforcement Fabrication 72.58 64.08 111.42 147.63 95.85 63.22
5 Ware house 52.23 66.19 78.02 78.78 58.96 33.18
6 Main Office 42.86 58.01 80.64 66.23 42.81 36.05

Sum = 2597.06

1 diluar perputaran lengan


2 zona 2
3 paling bahaya zona 1

TD SC m
1 95270 2597.06
Skenario 3 (Tower Crane bisa dipindah ke fasilitas Warehouse)

Distance Frekuensi
1 2 3 4 5 6 1 2 3 4 5 6
Worker Reinforcement Scafolding Worker Reinforcement Scafolding
Basecamp Ware house Fabrication Fabrication Tower Crane Main Office Basecamp Ware house Fabrication Fabrication Tower Crane Main Office

TD1 1 Worker Basecamp 0 80 120 80 135 105 Distance 1 Worker Basecamp 0 7 8 12 7 5


2 Ware house 80 0 40 40 55 65 No x y 2 Ware house 7 0 5 5 2 8
3 Reinforcement Fabrication 120 40 0 40 35 65 1 10 80 3 Reinforcement Fabrication 8 5 0 18 10 4
4 Scafolding Fabrication 80 40 40 0 75 105 2 70 60 4 Scafolding Fabrication 12 5 18 0 5 7
5 Tower Crane 135 55 35 75 0 30 3 90 40 5 Tower Crane 7 2 10 5 0 5
6 Main Office 105 65 65 105 30 0 4 90 80 6 Main Office 5 8 4 7 5 0
5 80 15
1 2 3 4 5 6 6 50 15 1 2 3 4 5 6
Worker Reinforcement Scafolding Worker Reinforcement Scafolding
Basecamp Ware house Fabrication Fabrication Tower Crane Main Office Basecamp Tower Crane Fabrication Fabrication Ware house Main Office

1 Worker Basecamp 3950 2110 3610 3970 2285 2355


2 Ware house 1510 1590 2170 2410 1485 1115
3 Reinforcement Fabrication 1330 1630 2490 2270 1445 1375
4 Scafolding Fabrication 1650 1750 2010 2990 1565 1255
5 Tower Crane 1715 1735 2825 2735 1930 1780
6 Main Office 2445 1645 3355 2905 2040 2190

Sum = 77620

Safety Distance Frekuensi


1 2 3 4 5 6 x y 1 2 3 4 5 6
Worker Reinforcement Scafolding Worker Reinforcement Scafolding
Basecamp Ware house Fabrication Fabrication Tower Crane Main Office 1 10 80 Basecamp Ware house Fabrication Fabrication Tower Crane Main Office

1 Worker Basecamp 0.000 1.500 1.583 2.313 1.000 1.000 2 70 60 1 Worker Basecamp 0 7 8 12 7 5
2 Ware house 1.500 0.000 2.750 3.000 2.182 1.692 3 85 40 2 Ware house 7 0 5 5 2 8
3 Reinforcement Fabrication 1.583 2.750 0.000 2.875 1.286 1.077 4 85 80 3 Reinforcement Fabrication 8 5 0 18 10 4
4 Scafolding Fabrication 2.313 3.000 2.875 0.000 2.067 1.762 5 75 15 4 Scafolding Fabrication 12 5 18 0 5 7
5 Tower Crane 1.000 2.182 1.286 2.067 0.000 1.000 6 50 15 5 Tower Crane 7 2 10 5 0 5
6 Main Office 1.000 1.692 1.077 1.762 1.000 0.000 6 Main Office 5 8 4 7 5 0
SC1
jarak/jarak total * nilai
1 2 3 4 5 6 1 2 3 4 5 6
Worker Reinforcement Scafolding Worker Reinforcement Scafolding
Basecamp Ware house Fabrication Fabrication Tower Crane Main Office Basecamp Tower Crane Fabrication Fabrication Ware house Main Office

1 Worker Basecamp 62.92 29.48 63.13 48.00 35.40 39.52


2 Ware house 81.73 57.15 94.59 90.26 61.46 50.41
3 Reinforcement Fabrication 68.13 36.65 95.33 46.72 36.34 56.47
4 Scafolding Fabrication 67.28 48.79 61.21 117.17 59.75 57.40
5 Tower Crane 55.36 31.76 60.11 53.05 39.55 42.06
6 Main Office 48.60 23.19 58.18 44.85 29.96 40.18

Sum = 1992.13

1 diluar perputaran lengan


2 zona 2
3 paling bahaya zona 1

TD SC m
1 77620 1992.13
Distance Frekuensi
1 2 3 4 5 6 1 2 3 4 5 6
Reinforcement Scafolding Worker Reinforcement Scafolding Worker
Main Office Tower Crane Fabrication Fabrication Ware house Basecamp Main Office Tower Crane Fabrication Fabrication Ware house Basecamp

TD1 1 Main Office 0 80 120 80 135 105 Distance 1 Main Office 0 5 5 4 7 7


2 Tower Crane 80 0 40 40 55 65 No x y 2 Tower Crane 5 0 20 10 5 8
3 Reinforcement Fabrication 120 40 0 40 35 65 1 10 80 3 Reinforcement Fabrication 5 20 0 18 5 12
4 Scafolding Fabrication 80 40 40 0 75 105 2 70 60 4 Scafolding Fabrication 4 10 18 0 20 4
5 Ware house 135 55 35 75 0 30 3 90 40 5 Ware house 7 5 5 20 0 5
6 Worker Basecamp 105 65 65 105 30 0 4 90 80 6 Worker Basecamp 7 8 12 4 5 0
5 80 15
1 2 3 4 5 6 6 50 15 1 2 3 4 5 6
Reinforcement Scafolding Worker Worker Reinforcement Scafolding
Main Office Tower Crane Ware house Tower Crane Ware house Main Office
Fabrication Fabrication Basecamp Basecamp Fabrication Fabrication

1 Main Office 3000 4715 4975 6080 3125 3075


2 Tower Crane 1200 2395 2175 2400 1885 1475
3 Reinforcement Fabrication 1060 1695 3075 1840 2165 1495
4 Scafolding Fabrication 1660 2415 2835 3360 1485 1735
5 Ware house 960 2365 3485 1840 3045 2105
6 Worker Basecamp 1280 3025 3865 2840 3485 2605

Sum = 92220

Safety Distance Frekuensi


1 2 3 4 5 6 x y 1 2 3 4 5 6

Main Office Tower Crane Reinforcement Scafolding Ware house Worker 1 10 80 Main Office Tower Crane Reinforcement Scafolding Ware house Worker
Fabrication Fabrication Basecamp Fabrication Fabrication Basecamp

1 Main Office 0.000 1.500 1.583 2.313 1.000 1.000 2 70 60 1 Main Office 0 5 5 4 7 7
2 Tower Crane 1.500 0.000 2.750 3.000 2.182 1.692 3 85 40 2 Tower Crane 5 0 20 10 5 8
3 Reinforcement Fabrication 1.583 2.750 0.000 2.875 1.286 1.077 4 85 80 3 Reinforcement Fabrication 5 20 0 18 5 12
4 Scafolding Fabrication 2.313 3.000 2.875 0.000 2.067 1.762 5 75 15 4 Scafolding Fabrication 4 10 18 0 20 4
5 Ware house 1.000 2.182 1.286 2.067 0.000 1.000 6 50 15 5 Ware house 7 5 5 20 0 5
6 Worker Basecamp 1.000 1.692 1.077 1.762 1.000 0.000 6 Worker Basecamp 7 8 12 4 5 0
SC1
jarak/jarak total * nilai
1 2 3 4 5 6 1 2 3 4 5 6
Reinforcement Scafolding Worker Worker Reinforcement Scafolding
Main Office Tower Crane Ware house Tower Crane Ware house Main Office
Fabrication Fabrication Basecamp Basecamp Fabrication Fabrication

1 Main Office 38.67 67.79 88.63 67.50 66.67 45.25


2 Tower Crane 52.87 116.95 92.72 105.91 92.71 66.41
3 Reinforcement Fabrication 41.79 51.71 134.02 63.86 87.72 51.01
4 Scafolding Fabrication 56.18 93.49 103.04 139.38 54.37 85.02
5 Ware house 32.60 59.38 97.84 52.96 70.67 48.15
6 Worker Basecamp 27.89 49.16 75.56 60.31 56.08 45.51

Sum = 2539.76

1 diluar perputaran lengan


2 zona 2
3 paling bahaya zona 1

TD SC m
1 92220 2539.76
Distance Frekuensi
1 2 3 4 5 6 1 2 3 4 5 6
Worker Reinforcement Scafolding Worker Reinforcement Scafolding
Tower Crane Basecamp Fabrication Fabrication Ware house Main Office Tower Crane Basecamp Fabrication Fabrication Ware house Main Office

TD1 1 Tower Crane 0 80 120 80 135 105 Distance 1 Tower Crane 0 7 20 10 5 5


2 Worker Basecamp 80 0 40 40 55 65 No x y 2 Worker Basecamp 7 0 8 12 4 5
3 Reinforcement Fabrication 120 40 0 40 35 65 1 10 80 3 Reinforcement Fabrication 20 8 0 18 5 4
4 Scafolding Fabrication 80 40 40 0 75 105 2 70 60 4 Scafolding Fabrication 10 12 18 0 20 7
5 Ware house 135 55 35 75 0 30 3 90 40 5 Ware house 5 4 5 20 0 8
6 Main Office 105 65 65 105 30 0 4 90 80 6 Main Office 5 5 4 7 8 0
5 80 15
1 2 3 4 5 6 6 50 15 1 2 3 4 5 6
Worker Reinforcement Scafolding Worker Reinforcement Scafolding
Tower Crane Ware house Main Office Tower Crane Ware house Main Office
Basecamp Fabrication Fabrication Basecamp Fabrication Fabrication

1 Tower Crane 4960 2985 3175 6555 3360 2520


2 Worker Basecamp 1800 1905 2855 3075 1920 1280
3 Reinforcement Fabrication 1180 1785 3875 2835 2080 1360
4 Scafolding Fabrication 1980 1705 2715 4235 1600 1360
5 Ware house 1985 2275 4610 2850 2810 1615
6 Main Office 2955 2635 4660 3600 3210 2085

Sum = 98390

Safety Distance Frekuensi


1 2 3 4 5 6 x y 1 2 3 4 5 6

Tower Crane Worker Reinforcement Scafolding Ware house Main Office 1 10 80 Tower Crane Worker Reinforcement Scafolding Ware house Main Office
Basecamp Fabrication Fabrication Basecamp Fabrication Fabrication

1 Tower Crane 0.000 1.500 1.583 2.313 1.000 1.000 2 70 60 1 Tower Crane 0 7 20 10 5 5
2 Worker Basecamp 1.500 0.000 2.750 3.000 2.182 1.692 3 85 40 2 Worker Basecamp 7 0 8 12 4 5
3 Reinforcement Fabrication 1.583 2.750 0.000 2.875 1.286 1.077 4 85 80 3 Reinforcement Fabrication 20 8 0 18 5 4
4 Scafolding Fabrication 2.313 3.000 2.875 0.000 2.067 1.762 5 75 15 4 Scafolding Fabrication 10 12 18 0 20 7
5 Ware house 1.000 2.182 1.286 2.067 0.000 1.000 6 50 15 5 Ware house 5 4 5 20 0 8
6 Main Office 1.000 1.692 1.077 1.762 1.000 0.000 6 Main Office 5 5 4 7 8 0
SC1
jarak/jarak total * nilai
1 2 3 4 5 6 1 2 3 4 5 6
Worker Reinforcement Scafolding Worker Reinforcement Scafolding
Tower Crane Ware house Main Office Tower Crane Ware house Main Office
Basecamp Fabrication Fabrication Basecamp Fabrication Fabrication

1 Tower Crane 75.29 49.42 62.63 73.50 68.17 38.02


2 Worker Basecamp 104.37 85.69 101.68 119.98 94.79 56.95
3 Reinforcement Fabrication 59.81 56.11 116.15 82.09 85.03 52.08
4 Scafolding Fabrication 97.64 56.26 87.63 164.54 52.03 54.60
5 Ware house 66.65 47.09 78.65 66.32 69.49 35.52
6 Main Office 56.00 40.76 70.25 69.69 52.39 38.10

Sum = 2585.39

1 diluar perputaran lengan


2 zona 2
3 paling bahaya zona 1

TD SC m
1 98390 2585.39
Travel Distance Safety Index
Eksisting 95,750 2,626
Iterasi 1 84,500 2,314
Iterasi 2 95,270 2,597
Iterasi 3 77,620 1,992
Iterasi 4 92,220 2,540
Iterasi 5 98,390 2,585

Jadi Posisi terbaik dengan minimal Travel distance dan safety Index minimal adalah Iterasi 3
(Tower Crane bisa dipindah ke fasilitas Warehouse)

Pareto Optima
3,000
2,626
2,597 2,585
2,500 2,540
2,314

2,000 1,992

1,500

1,000

500

-
75,000 80,000 85,000 90,000 95,000 100,000

Pareto Optima Linear (Pareto Optima) Linear (Pareto Optima)