1 2 3 4 5 6 1 2 3 4 5 6
Sum = 95750
1 Worker Basecamp 0.000 1.500 1.583 2.313 1.000 1.000 2 70 60 1 Worker Basecamp 0 7 8 12 4 5
2 Tower Crane 1.500 0.000 2.750 3.000 2.182 1.692 3 85 40 2 Tower Crane 7 0 20 10 5 5
3 Reinforcement Fabrication 1.583 2.750 0.000 2.875 1.286 1.077 4 85 80 3 Reinforcement Fabrication 8 20 0 18 5 4
4 Scafolding Fabrication 2.313 3.000 2.875 0.000 2.067 1.762 5 75 15 4 Scafolding Fabrication 12 10 18 0 20 7
5 Ware house 1.000 2.182 1.286 2.067 0.000 1.000 6 50 15 5 Ware house 4 5 5 20 0 8
6 Main Office 1.000 1.692 1.077 1.762 1.000 0.000 6 Main Office 5 5 4 7 8 0
SC1
jarak/jarak total * nilai
1 2 3 4 5 6 1 2 3 4 5 6
Worker Reinforcement Scafolding Worker Reinforcement Scafolding
Tower Crane Ware house Main Office Tower Crane Ware house Main Office
Basecamp Fabrication Fabrication Basecamp Fabrication Fabrication
Sum = 2626.40
TD SC m
1 95750 2626.40
Skenario 1 (worker basecamp bisa dipindah ke fasilitas warehouse)
Distance Frekuensi
1 2 3 4 5 6 1 2 3 4 5 6
Reinforcement Scafolding Worker Reinforcement Scafolding Worker
Ware house Tower Crane Fabrication Fabrication Basecamp Main Office Ware house Tower Crane Fabrication Fabrication Basecamp Main Office
Sum = 84500
1 Ware house 0.000 1.500 1.583 2.313 1.000 1.000 2 70 60 1 Ware house 0 4 5 5 7 8
2 Tower Crane 1.500 0.000 2.750 3.000 2.182 1.692 3 85 40 2 Tower Crane 4 0 20 10 8 5
3 Reinforcement Fabrication 1.583 2.750 0.000 2.875 1.286 1.077 4 85 80 3 Reinforcement Fabrication 5 20 0 18 12 4
4 Scafolding Fabrication 2.313 3.000 2.875 0.000 2.067 1.762 5 75 15 4 Scafolding Fabrication 5 10 18 0 4 7
5 Worker Basecamp 1.000 2.182 1.286 2.067 0.000 1.000 6 50 15 5 Worker Basecamp 7 8 12 4 0 8
6 Main Office 1.000 1.692 1.077 1.762 1.000 0.000 6 Main Office 8 5 4 7 5 0
SC1
jarak/jarak total * nilai
1 2 3 4 5 6 1 2 3 4 5 6
Sum = 2313.94
TD SC m
1 84500 2313.94
Skenario 2 (reinforcement fabrication bisa dipindah ke fasilitas Scafolding Fabrication)
Distance Frekuensi
1 2 3 4 5 6 1 2 3 4 5 6
Worker Scafolding Reinforcement Worker Scafolding Reinforcement
Basecamp Tower Crane Fabrication Fabrication Ware house Main Office Basecamp Tower Crane Fabrication Fabrication Ware house Main Office
Sum = 95270
1 Worker Basecamp 0.000 1.500 1.583 2.313 1.000 1.000 2 70 60 1 Worker Basecamp 0 7 12 8 4 5
2 Tower Crane 1.500 0.000 2.750 3.000 2.182 1.692 3 85 40 2 Tower Crane 7 0 10 20 5 5
3 Scafolding Fabrication 1.583 2.750 0.000 2.875 1.286 1.077 4 85 80 3 Scafolding Fabrication 12 10 0 18 20 7
4 Reinforcement Fabrication 2.313 3.000 2.875 0.000 2.067 1.762 5 75 15 4 Reinforcement Fabrication 8 20 18 0 5 4
5 Ware house 1.000 2.182 1.286 2.067 0.000 1.000 6 50 15 5 Ware house 4 5 20 5 0 8
6 Main Office 1.000 1.692 1.077 1.762 1.000 0.000 6 Main Office 5 5 7 4 8 0
SC1
jarak/jarak total * nilai
1 2 3 4 5 6 1 2 3 4 5 6
Worker Scafolding Reinforcement Worker Reinforcement Scafolding
Basecamp Tower Crane Fabrication Fabrication Ware house Main Office Basecamp Tower Crane Fabrication Fabrication Ware house Main Office
Sum = 2597.06
TD SC m
1 95270 2597.06
Skenario 3 (Tower Crane bisa dipindah ke fasilitas Warehouse)
Distance Frekuensi
1 2 3 4 5 6 1 2 3 4 5 6
Worker Reinforcement Scafolding Worker Reinforcement Scafolding
Basecamp Ware house Fabrication Fabrication Tower Crane Main Office Basecamp Ware house Fabrication Fabrication Tower Crane Main Office
Sum = 77620
1 Worker Basecamp 0.000 1.500 1.583 2.313 1.000 1.000 2 70 60 1 Worker Basecamp 0 7 8 12 7 5
2 Ware house 1.500 0.000 2.750 3.000 2.182 1.692 3 85 40 2 Ware house 7 0 5 5 2 8
3 Reinforcement Fabrication 1.583 2.750 0.000 2.875 1.286 1.077 4 85 80 3 Reinforcement Fabrication 8 5 0 18 10 4
4 Scafolding Fabrication 2.313 3.000 2.875 0.000 2.067 1.762 5 75 15 4 Scafolding Fabrication 12 5 18 0 5 7
5 Tower Crane 1.000 2.182 1.286 2.067 0.000 1.000 6 50 15 5 Tower Crane 7 2 10 5 0 5
6 Main Office 1.000 1.692 1.077 1.762 1.000 0.000 6 Main Office 5 8 4 7 5 0
SC1
jarak/jarak total * nilai
1 2 3 4 5 6 1 2 3 4 5 6
Worker Reinforcement Scafolding Worker Reinforcement Scafolding
Basecamp Ware house Fabrication Fabrication Tower Crane Main Office Basecamp Tower Crane Fabrication Fabrication Ware house Main Office
Sum = 1992.13
TD SC m
1 77620 1992.13
Distance Frekuensi
1 2 3 4 5 6 1 2 3 4 5 6
Reinforcement Scafolding Worker Reinforcement Scafolding Worker
Main Office Tower Crane Fabrication Fabrication Ware house Basecamp Main Office Tower Crane Fabrication Fabrication Ware house Basecamp
Sum = 92220
Main Office Tower Crane Reinforcement Scafolding Ware house Worker 1 10 80 Main Office Tower Crane Reinforcement Scafolding Ware house Worker
Fabrication Fabrication Basecamp Fabrication Fabrication Basecamp
1 Main Office 0.000 1.500 1.583 2.313 1.000 1.000 2 70 60 1 Main Office 0 5 5 4 7 7
2 Tower Crane 1.500 0.000 2.750 3.000 2.182 1.692 3 85 40 2 Tower Crane 5 0 20 10 5 8
3 Reinforcement Fabrication 1.583 2.750 0.000 2.875 1.286 1.077 4 85 80 3 Reinforcement Fabrication 5 20 0 18 5 12
4 Scafolding Fabrication 2.313 3.000 2.875 0.000 2.067 1.762 5 75 15 4 Scafolding Fabrication 4 10 18 0 20 4
5 Ware house 1.000 2.182 1.286 2.067 0.000 1.000 6 50 15 5 Ware house 7 5 5 20 0 5
6 Worker Basecamp 1.000 1.692 1.077 1.762 1.000 0.000 6 Worker Basecamp 7 8 12 4 5 0
SC1
jarak/jarak total * nilai
1 2 3 4 5 6 1 2 3 4 5 6
Reinforcement Scafolding Worker Worker Reinforcement Scafolding
Main Office Tower Crane Ware house Tower Crane Ware house Main Office
Fabrication Fabrication Basecamp Basecamp Fabrication Fabrication
Sum = 2539.76
TD SC m
1 92220 2539.76
Distance Frekuensi
1 2 3 4 5 6 1 2 3 4 5 6
Worker Reinforcement Scafolding Worker Reinforcement Scafolding
Tower Crane Basecamp Fabrication Fabrication Ware house Main Office Tower Crane Basecamp Fabrication Fabrication Ware house Main Office
Sum = 98390
Tower Crane Worker Reinforcement Scafolding Ware house Main Office 1 10 80 Tower Crane Worker Reinforcement Scafolding Ware house Main Office
Basecamp Fabrication Fabrication Basecamp Fabrication Fabrication
1 Tower Crane 0.000 1.500 1.583 2.313 1.000 1.000 2 70 60 1 Tower Crane 0 7 20 10 5 5
2 Worker Basecamp 1.500 0.000 2.750 3.000 2.182 1.692 3 85 40 2 Worker Basecamp 7 0 8 12 4 5
3 Reinforcement Fabrication 1.583 2.750 0.000 2.875 1.286 1.077 4 85 80 3 Reinforcement Fabrication 20 8 0 18 5 4
4 Scafolding Fabrication 2.313 3.000 2.875 0.000 2.067 1.762 5 75 15 4 Scafolding Fabrication 10 12 18 0 20 7
5 Ware house 1.000 2.182 1.286 2.067 0.000 1.000 6 50 15 5 Ware house 5 4 5 20 0 8
6 Main Office 1.000 1.692 1.077 1.762 1.000 0.000 6 Main Office 5 5 4 7 8 0
SC1
jarak/jarak total * nilai
1 2 3 4 5 6 1 2 3 4 5 6
Worker Reinforcement Scafolding Worker Reinforcement Scafolding
Tower Crane Ware house Main Office Tower Crane Ware house Main Office
Basecamp Fabrication Fabrication Basecamp Fabrication Fabrication
Sum = 2585.39
TD SC m
1 98390 2585.39
Travel Distance Safety Index
Eksisting 95,750 2,626
Iterasi 1 84,500 2,314
Iterasi 2 95,270 2,597
Iterasi 3 77,620 1,992
Iterasi 4 92,220 2,540
Iterasi 5 98,390 2,585
Jadi Posisi terbaik dengan minimal Travel distance dan safety Index minimal adalah Iterasi 3
(Tower Crane bisa dipindah ke fasilitas Warehouse)
Pareto Optima
3,000
2,626
2,597 2,585
2,500 2,540
2,314
2,000 1,992
1,500
1,000
500
-
75,000 80,000 85,000 90,000 95,000 100,000